How to make repairs in an apartment with a rough finish with your own hands
In detail: how to make repairs in an apartment with a rough finish with your own hands from a real master for the site my.housecope.com.
When choosing housing in a new house, most buyers are faced with such a term as a rough finish of an apartment. There is no clear legal definition of this term. Therefore, it is worth knowing in advance what can be obtained as a result of such a purchase and what it is proposed to pay for.
Generally speaking, a rough finish of an apartment consists of only the most necessary and "dirtiest" finishing measures. You will receive a "box" with the work performed, without which the property could not have been commissioned:
there is a primary wiring;
walls and ceilings are aligned;
an entrance door and windows have been installed (some developers offer metal doors and plastic double-glazed windows. Other ordinary cheap wooden windows and doors);
on the floor - a sand-cement screed.
In some cases, the rough finish of an apartment in a new building implies the presence of only supporting structures and tracing on the floor. There will be heating, electricity and water supply systems (even "warm floors" can be provided). But there will be no plumbing (sink, toilet, bath) and interior doors. Finding out how much the rough finishing of an apartment in a new building costs, ask if the price includes glazing of the balcony / loggia.
Now you know what is included in the rough finishing of an apartment in a new building. But is she really needed at all? As practice shows, it is easier and cheaper to carry out rough finishing activities from scratch. Indeed, in this case, you will not have to alter, dismantle or break anything. When repairing an apartment with a rough finish in a new building, you often have to get rid of low-quality finishing materials, cheap window and door structures, re-align the walls and ceiling, and change the sand-cement floor screed.
Video (click to play).
Find out about the developer's offer price and the scope of work. After that, calculate whether the rough finishing of an apartment in a new building with your own hands would not be more profitable? It is easy to do this: add up the cost of all the above activities, focusing on the proposals of private craftsmen and specialized companies. Perhaps you can do some of the work in person? And compare the amount with that offered by the developer.
But! If the apartment does not have any repairs at all, it is impossible to live in it. If the rough finish is of high quality, all you have to do is install electrical appliances, equip the flooring, carry out tiling and painting, and wallpaper. Don't forget about the shrinkage of the building. After one and a half to two years, this process can ruin even the best finishing materials.
The best option is the presence of a rough finish, a cheap final repair. After shrinkage of the new building - performance of high-quality final repairs "for centuries".
Now let's find out where to start repairs with a rough finish in a new building:
If you cannot decide which is more profitable - having a rough finish or buying only concrete walls, consult a specialist. But do this after knowing in advance what exactly is offered by the developer: the list of finishing activities should be indicated in the official contract with the real estate seller.
How do you start repairing an apartment with a rough finish? It is necessary to take into account many nuances that will allow you to get a comfortable and safe home. Rough work can be carried out in new buildings or in houses of an earlier construction, with each of the options having some differences.It is worth remembering about them in order to avoid unpleasant consequences.
Most often, apartment renovation is required when buying a new home. Currently, developers are carrying out the main set of works, which includes screed and plaster. Also, the premises have incoming connection points for communications, surfaces leveled with starting compounds, laid electrical wires and glazed window openings (with the exception of the balcony, if any).
Rough finishing involves preparing the room for the application of finishing compounds and materials
Secondary housing may also need to be repaired if the coverage and communications have served their time. But it is with newly built houses, which were built according to the same type of plan, that the most problems arise. They are as follows:
Shrinkage. All buildings are subject to this process, but new buildings are much more noticeable. If the rough work was performed incorrectly or the wrong materials were used, then any fine finish will quickly become unusable.
Lack of a communications wiring plan and the ability to create new connection points without damage. Indeed, it is very rare to draw up a diagram of the location of electrical wiring, which significantly complicates many work. And for new connection points, you will need to do wall chasing again.
There is no guarantee that all necessary steps have been completed. For example, it is not known if waterproofing has been installed, especially in the bathroom.
It is not always advisable to use excessively expensive materials and finishes in a new building, since a new house can shrink
Of course, it is much better to carry out the work yourself or check the quality of the work with hired craftsmen or organizations. But this possibility is not always available.
Where to start renovating an apartment with a rough finish? Taking into account all possible problems, the answer to this question will be unambiguous - with an assessment of quality. Although further processes include a set of works, this is paramount.
It all starts with finding flaws. It is this process that makes it possible to obtain a more accurate list of activities that need to be carried out in the future.
A level rail or level is applied to the walls, the length of the tool should be more than 1.5 m. Alternatively, you can use an iron ruler. With the help of the level, the curvature is determined, and the ruler makes it possible to see the gaps that are formed between its edge and the coating. If the defects are more than 2-3 mm per 1 m2 or the wall sinks up or down, then additional leveling with a putty will be required.
To identify irregularities, an even instrument is applied to the wall and all depressions are marked with a pencil
This surface is assessed using a similar technology, but provided that a screed was used as a rough coating, an important detail is the presence of a damper tape. It is glued around the perimeter of the room before pouring the solution.
A damper tape is a mandatory attribute when arranging a screed, since without it, thermal expansion will lead to cracks
On a note! It is often believed that the damper tape is optional. In fact, its absence contributes to the appearance of cracks and deformations in the flooring. This is especially true for recently erected buildings, where the shrinkage is very uneven.
If it is not there, you should dismantle the screed to fill in a new one in accordance with all technological nuances, but this will lead to tangible time and financial losses. Therefore, there are other options for solving this problem:
If the screed is poured without a damping gap, then it can either be dismantled completely, or the seams can be cut with a grinder and filled with an elastic material such as silicone
Creation of expansion joints.This method assumes that the floor surface is cut into several sections along its entire length. For this, a grinder or a more suitable tool is used. The bottom line is that the joints created will neutralize the emerging deformation processes.
Continuation of work, taking into account the fact that after some time, it may be necessary to carry out repairs.
If during inspection it is found that the coating has curvature or defects, then a thin layer of self-leveling mixture is poured.
Self-leveling screed allows you to make the floor perfectly level
It is difficult to understand where to start renovating an apartment without assessing the condition of the ceiling. It is with this surface that the most problems arise. Of course, if the rough finish is carried out with high quality, then the base does not require additional intervention, but this is extremely rare. Therefore, there are several options for the development of events.
The deficiencies encountered are determined, the level of curvature is measured. It is recommended to tap the joints of the floor slabs. When cracks appear or mortar falls, a complete replacement of the layer and reinforcement of the seams are required. If the defects are more than 3 mm per 1 m, then putty is applied. In case of serious deviations, a new plastering should be performed or a simpler option should be used: a frame is created, which is sheathed with the selected material. An alternative is a stretch ceiling.
It is quite difficult to work with such a surface, especially without the appropriate experience.
Ceiling putty requires certain skills, so it is better for a novice master to pay attention to plasterboard or tension structures
After rough finishing, communications are predominantly located as follows:
The electrical wiring is built into the wall. Connection points were created without installed elements, that is, insulated wires protrude from the holes for sockets, switches and lighting partitions.
It makes sense to mount additional branches of electrical wiring only when there is an electrical wiring diagram for the apartment
There are inputs for water supply and sewerage sources. It is rare that all pipes have been routed to the right places.
Gas is supplied depending on the technical plan for the placement of consumption devices without connecting them.
When checking communications, you should pay attention to the accuracy of the location of all future connection points. If it is necessary to add wiring outputs, then it is necessary to groove surfaces and lay new lines.
After buying an apartment, additional wiring of communications may be required
It is important to ensure that the riser is properly installed and tight. The main problem lies in the sewer pipes: they can be not securely fixed or have faults in the sectional joints.
Naturally, you can face a lot of problems indicating that the rough finish was done very poorly. In this case, a complete rework will be required.
The found problems are fixed in the following order:
The final alignment of all surfaces is performed. If leveling compounds are used, then they are applied in a thin layer, followed by leveling.
If the defects are serious, then you can sheathe the bases with sheet material. The technology provides for two options: installation directly on the surface using glue or preliminary construction of the lathing.
Working with communications involves laying pipes to the connection points.
A good way of leveling surfaces is pasting with drywall, this method is easy to arrange and does not steal the usable area of the room
Only then can you start decorative cladding.
It happens that the renovation of an apartment does not need to correct significant deficiencies. Then the algorithm of actions is as follows:
The finishing scheme and the final design are drawn up.
All the necessary tools and materials are purchased and prepared.
First of all, it is recommended to perform the lining of the ceiling, this will avoid damage to adjacent areas.
Next, you should tackle the walls: they are painted, pasted over with wallpaper, or they choose a more suitable option.
They go to the flooring after the ceiling and floor in order to choose the right material for finishing. The last to be installed are the upper and lower skirting boards.
It remains to install interior items, connect plumbing and appliances.
Summarizing the above, we can conclude that the sequence of activities directly depends on the initial quality of the rough work.