If we want to turn apartment renovation into an eternal endless process, then as a rule we do not plan it and do not think about what we actually need. Many unpretentious owners often choose cosmetic repairs, and they are quite understandable if the housing is in a new building, and because of the building's upsetting, a lot will have to be redone anyway. But what to do when the house is already inhabited and it makes sense to think about a reliable long-term arrangement in order to forget about repairs at least for a ten-year period?
In this case, the right choice would be a major overhaul of the apartment.... But can you do it completely yourself?
Where do the overhaul of an apartment begin?
If the building is more than twenty years old, and the apartment has never been renovated, affecting the internal foundations, and everything ended with the replacement of external decorative coatings, then the following may happen:
The worst thing is the closure of the rotten electrical wiring, when the smoldering wires hidden in the walls begin to smolder and a fire can break out It's scary to imagine if this happens at night or during your absence.
An equally terrible thing is the leakage of water and sewer pipes, “carefully” walled up behind tiles or panels without the possibility of access to them: You will have to not only break the coverings, but also reimburse the costs of repairs to the neighbors from below.
The absence of a ventilation hood or its incorrect design can lead to gas poisoning when it leaks, high humidity, unpleasant odors in the apartment, etc.
Therefore, the replacement of communications, if you do not want any emergencies at home, is the first necessary condition that is included in the scope of any major repairs.
Video (click to play).
The advantages of a major overhaul:
It makes your apartment almost invulnerable and allows you to forget about everyday problems for a long time.
Allows the use of expensive and high-quality finishing coatings, preparing the right ideal base for them
It usually lasts a long time, but with the correct distribution of stages and a reasonable combination of your independent work with the work of professional craftsmen, the time can be significantly reduced
Of course, such repairs will cost much more than cosmetic ones, but if you manage to do most of the stages yourself, this will save the lion's share of the funds. For the price, I think that independently carried out major overhauls will not differ much from the cosmetic ones performed by the repair service.
With the release of internal space.
Moving furniture or moving it to another room is not enough here:
The room must be completely freed from all objects, since it is advisable to carry out work in all rooms with a united front.
Take care of your temporary home in advance: rent an apartment or go to relatives for six months or a year.
It is assumed that there is already a plan for our future interior, and all the necessary materials and tools have been purchased.
Some tools are too expensive. You can rent it or just invite a professional at some stage if it is cheaper and the tool is no longer useful on the farm.
Overhaul of an apartment is divided into the following main stages:
Dismantling
Redevelopment
Replacement of communications
Rough work
Fine finishing works
Installation work
If you describe the whole process in detail, then the sequence of overhaul can be something like this:
Correctly planned, phased overhaul can be done in a shorter time
We start with dismantling
We demolish all the old coatings to bare walls
If a redevelopment is planned, then unnecessary partitions are demolished and new ones are erected: When affecting load-bearing walls, it is necessary to agree on your redevelopment project with the housing inspectorate.
We dismantle communications: electrical wiring, heating pipes and batteries, water and sewer pipes
If this is included in the new apartment plan, additional partitions are installed
We replace communications
Replacement of communications is carried out at the initial stages of overhaul
Replacement of electrical wiring should be carried out up to the switchboard on the site, and not strictly to the apartment corridor panel
Before installing new electrical wiring, you must have already finally approved your future interior plan in order to rationalize all the wires around the apartment.
Slitting for cable must not be performed in load-bearing panels and floor slabs.
New pipes on risers to guarantee trouble-free operation should end at the neighbors, and not at you, so all installation work must be coordinated with the neighbors above and below
It is necessary to change heating pipes and batteries in a non-heating season
Hot and cold water risers in the house must be closed before replacing pipes
Due to the great importance of communications, it is better to entrust their dismantling and installation to professional electricians and plumbers to handle them within one or two days..
This operation is also best done with one front in all rooms.
We make arches and columns at will
At this stage, we install, if necessary, heat and sound insulation, and in the bathroom and toilet - waterproofing
At the final stage of rough work, we produce:
Carpentry work: built-in wardrobes, door frames are installed
We order and install windows: Hand-made production of metal-plastic windows is hardly a reasonable solution.
We connect the batteries and hide the central heating pipes
We hide water and sewer pipes in a sanitary cabinet
We produce, if necessary, according to the technical process, the installation of wooden or metal frames (for lining, suspended ceilings, etc.)
The sequence of work may, of course, be different for everyone. Someone, for example, prefers to start with a floor screed.
Exterior decoration of the premises begins after all rough work has been completed in the room and all communications have been carried out
It is better to start finishing work from the ceiling and carry it out from top to bottom, leaving the floors at last..
Such work can no longer be carried out by a united front, but by premises, taking into account the affinity of the technological process:
For example, first finish the bathroom and the bathroom, then the kitchen, then the living room and the nursery.
Corridor repairs are always done last.
Fine finishing work is the application of external coatings to ceilings, walls and floors
Installation of suspended or stretch ceilings, ceiling cornices
Pasting walls with wallpaper
Decorative plastering
Installation of lining, wall panels
Laying wall and floor tiles
Laying laminate, parquet, linoleum
Filling the floor with polyurethane
Painting, varnishing, etc.
Installation work includes:
Installation of plumbing fixtures, kitchen and room furniture, entrance and interior doors
Installation of lighting, switches and sockets, skirting boards
All external cables (television, telephone, Internet) are previously hidden under the baseboard, unless they were previously laid along with the electrical wiring in the wall grooves at the initial stage of the repair.
The final and very pleasant touch of the overhaul is decorating and decorating your home with some cute things: Flowers, paintings, macrame, totems, etc.
It is quite possible to carry out a major overhaul of an apartment on your own, but you should not strive to independently carry out absolutely all of its stages.
Make repairs yourself as long as you like it, until the moment when it becomes overwhelming
In whatever sequence the repairs are carried out, the main thing is that it is carried out amicably, cheerfully and pleases with the result.
Video: Overhaul at an accelerated pace
If you decide to carry out a major overhaul, it is very important to carefully plan everything in advance.
The question of where to start a major overhaul in an apartment is not at all idle - the correct sequence of actions will help significantly save money, time and effort, avoid inconsistencies, the correction of which can be expensive and require a lot of effort.
Apartment overhaul design project
Where to start a major overhaul in an apartment:
Help the designers make all the necessary measurements directly on the spot, since the data indicated in the passport for the apartment may not be accurate enough.
Make sure your design takes into account:
The layout of the entire apartment after its renovation.
Laying of communications (sewerage, water pipes, electrical wiring).
Layout of the most important equipment - baths, toilet, sink, kitchen sink, gas or electric stove, air conditioner, water meters and other indicators (electricity meter, gas meter, if necessary), as well as built-in furniture.
It is very important to calculate the estimate of the planned work, which should include a small amendment upward for unforeseen circumstances (up to 10 percent). You need to decide whether you will attract specialists, or will you be able to carry out all the work on the overhaul of the apartment on your own.
Decide in advance household issues - where to move with your family and take out everyday items. If this is the summer period, the problem can be solved by moving the whole family to a country house.
When moving to a recently acquired apartment on the "secondary" market, its overhaul is especially relevant, in this case, you can use a short time period and carry out the overhaul of the secondary apartment before the final move in.
So, you moved with your family to relatives or to a country house, and you are directly concerned with the question of where to start major repairs in an apartment of secondary housing? The sequence of actions for overhaul carried out on its own includes:
Dismantling the premises inside and out: at this stage it is necessary to clean everything "to the ground". Remove furniture and accessories from the apartment in which they used to live, remove lighting fixtures, dismantle sockets and switches, plumbing, window and door openings, remove old wallpaper and all the decoration that was in the room, including plaster, as well as the floor screed. If the apartment was uninhabited, the work is a little less, but it should be done no less thoroughly.
Conduct cleaning and garbage disposal work that may be larger and more significant than you originally thought.
Disconnect all utilities. Turn off the gas and water taps, turn off the electricity in the repaired apartment.
As a result of complete dismantling, the apartment resembles a "bare box".
The order and scope of work on the overhaul of the apartment, if necessary, can be adjusted, something to miss, something may need to be supplemented.
It is important to follow the sequence of work in order to avoid unforeseen situations, fraught with considerable additional costs. Planned, focused work will bring you great results.
The video shows a do-it-yourself overhaul of an apartment in 120 days: