Do-it-yourself inexpensive repair in a new building

In detail: do-it-yourself inexpensive repair in a new building from a real master for the site my.housecope.com.

Image - Do-it-yourself inexpensive repair in a new building

Image - Do-it-yourself inexpensive repair in a new building Image - Do-it-yourself inexpensive repair in a new building

Finally the sword came true - we bought our apartment in a new house. Happiness, euphoria from the acquisition. But, to move and live immediately without repairs in it does not seem real. The question arose: how to make repairs in it more economically and as soon as possible?

It must be remembered that a new home requires a certain amount of shrinkage time. To make inexpensive renovations in a new building, follow these tips:

choose a building and finishing material that is not afraid of shrinkage.

it is advisable to paint the walls, and not glue with wallpaper. Wallpaper may tear between corners. Having decided to glue them all the same, choose vinyl and fabric wallpaper when buying. Stretching properties are inherent in them. Before starting work on the wall, reinforce it with a special mesh.

make the ceiling stretch fabric.

parquet is used for the floor. But, if this is costly for the budget, then it is recommended to purchase a special plastic mixture that will prevent the material from cracking. Saturate the floor with it, and lay the linoleum.

The first place in the renovation of a new apartment belongs to the bathroom. It is required to establish a sewerage system, install plumbing. If it does not meet the needs of the tenants, purchase it from building supermarkets at affordable budget prices to choose from. Materials of Polish-Czech production are of good quality. When comfort meets all your wishes, move on to the kitchen. It is clear that after completing the finishing work, it takes time to install kitchen furniture and household appliances.

Next, we proceed to the living rooms. Carrying out work requires a specific algorithm. Both for the kitchen and for the rooms, communications are initially being laid. The next step is finishing. But where to start: floor or ceiling? Don't forget about windows and doors. Let's start with the ceiling, then line up the walls and floor. Windows and doors are installed after leveling the walls and ceiling screed. Finishing and decorative work, as well as the installation of the floor covering, are carried out after the doors are installed.

Video (click to play).

To make economical repairs in a new building, be prepared for the fact that the procedure will take longer than professionals would. This will definitely not work without specialists, since the variety of work performed on their own belongs only to generalists. For more economical moments, try to get to know the teams of craftsmen who built the house. Any painter or plumber, electrician will agree to a part-time job for reasonable prices. But it is better to entrust repairs to experts - a team that performs complex work as a whole. Currently, many of them are making good discounts, and the quality is not inferior to serious construction organizations. Remember that inviting a specialist separately and leaving him alone to work in the apartment, there is a loss of time savings.

If the correct plan has been drawn up and materials have been purchased, the work has been carried out according to a clear algorithm, then in a month be ready to meet your family and friends for a wonderful holiday of life - housewarming.

Almost always, new housing is acquired by a happy newcomer from the developer's company without interior decoration and repair, but with communications brought into the apartment. Firstly, such housing in a new building will be cheaper, and secondly, almost always the repair and arrangement of an apartment by the developer is carried out extremely carelessly, using cheap materials. Thirdly, there is a desire to complete some stages of apartment renovation with your own hands or with the hands of good craftsmen.

First, you need to make an audit and inspection of the apartment, to establish problem areas of walls, ceilings and floors. Then we proceed in the following order. We determine what requires repair and finishing in the first place. If the time and money for a complete renovation of the apartment is not enough, it is necessary to put in order first of all:

  • Front door and windows, apartment ventilation;
  • Perform full and highest quality electrical wiring and wiring of sockets around the apartment. This stage must be thought out in as much detail as possible, draw up a connection diagram and a circuit for laying wires into walls;
  • Connect the water and collect the sewerage system in the bathroom and toilet, install a toilet bowl, washbasin and shower cabin;
  • If the start time of the renovation of an apartment in a new building coincided with the heating season, be sure to check the degree of heating of the aluminum registers with a remote thermometer.

In the process of carrying out the listed preparatory work, you can calculate the sequence of repairs in a new building.

Much in the repair of housing in a new building depends on the availability of time and money resources. Having bought a "bare" apartment and having completed the necessary documents for the right of ownership, you automatically start paying rent and housekeeping, for using the adjacent territory, for the removal of household waste and construction waste. After connecting electricity and water, a new apartment in a new building began to bring you a loss in the form of costs for its maintenance and decoration. The longer the repair time for an apartment in a new building, the more it will cost you.

There are two main options for approaching the issue of finishing a new apartment in a new building:

  1. Planned renovation and decoration of the apartment. In this case, the owners draw up a detailed map and a schedule for finishing work, in which all the main types of finishing and installation of devices are prescribed in stages. Such repairs, as a rule, are carried out from scratch to completion by one team of craftsmen. The completion date of a repaired object may take several weeks or months. The disadvantages of this approach include the constantly growing price and cost of work, sometimes exceeding the cost of the estimate by more than two times. As a result, if due to unforeseen circumstances there are not enough funds, the repair can be delayed for an indefinite period.
  2. Fast renovation from scratch. In this case, all of the above stages of repair in a new building are carried out by the hands of hired craftsmen with direct control of the quality of work on your part. An apartment in a new building within a week will be prepared for further decoration of the rooms. In addition to communications, the smallest room of the apartment is finished and equipped with temporary linoleum and wallpaper. In such a room there are still no amenities, but it can be used as housing - a temporary hut and a warehouse for building materials. All other work is performed as free funds and time become available.

The first option is well suited if the family has small children or elderly people who need to provide some comfort and convenience. The second option is considered more economical and quicker, especially if, after finishing the kitchen, bathroom, toilet and one room, the housing is rented, with the consecutive bringing the remaining rooms of the new building to condition.

Among the most popular horror stories for new buildings, it is customary to consider stories about the shrinkage of the walls of the house and its foundation. In reality, a similar process for a multi-storey building should finally be completed by the time the building is put into operation. This period is on average no more than 18 months. If, after 1.5 years, cracks form in the corners, the ceiling or at the joints and in the masonry of the walls, the tiles in the bathroom fall off, and the doors are deformed with skewed doors, this means that the new building has certain problems with the stability of the foundation.With the repair, you should wait until the main thing is clarified - what is happening with the new building.

Before starting work, first of all, inspect the lock on the front door. The model and standard equipment of the door can be subject to separate agreement. Indicate in the addendum to the contract which model of door and lock you want to install. If it becomes necessary to take additional security measures, first of all, change the lock supplied when the new building was handed over.

At the next stage, it is necessary to resolve the issue of installing an electrical switchboard, connecting an electric meter. This will make it possible to start using a power tool when renovating an apartment. To get rid of the need to use a large number of carriers and extension cords, plan the layout of the electrical wiring in the apartment. When doing this, consider the following:

  • For kitchens and bathrooms, wiring must be laid in sealed hoses and sleeves;
  • Lay a separate wire cable to the bathroom for connecting a boiler or washing machine. The cable cross-section must be rated for a current of at least 25 A;
  • An additional wire must be laid to the place where the air conditioner is installed;
  • It is necessary to lead a wire to the bathroom, to the kitchen, to the hall, which will be connected and used in the future when organizing additional grounding.

In addition to electricity, to create more or less normal conditions, it is necessary to connect hot and cold water meters and collect sewage in the bathroom and toilet. It is necessary to start work with the installation of a toilet and a washbasin.

Considering that good plumbing is expensive, for the first time you can install an inexpensive toilet bowl, assemble and connect plastic sewer pipes, a bellows and a washbasin sink. During the renovation of an apartment, plumbing can be replaced at any time. The installation of expensive plumbing increases the risk of damage to it during the repair; it must be installed at the final stage of the renovation of a new building.

To lay a plastic water supply using a perforator, we pierce channels in the walls of the bathroom, toilet, kitchen with a depth of 2.5-3 cm. Next, you need to solder the water pipes and connect the leads to the cistern and washbasin. Finally, we will install and connect cold and hot water meters to the domestic water supply system.

Before starting work, you will need to perform a large amount of cleaning the remnants of concrete and mortar. The main part will be for rough cleaning of walls, floor, ceiling, their chasing, alignment and trimming of seams. Such work gives a large amount of dirt and dust, so it will be necessary to organize good ventilation and wet cleaning inside the new building.

A separate point is to highlight the preparation of floors in each of the rooms for finishing. During the repairs in the apartment, it will be necessary to close up all the cracks, holes in the seams between the slabs, in the floor, in the interior walls of the new building. The most difficult thing will be leveling the floor with a cement mortar screed and reinforcing mesh. This procedure will need to be performed upon completion of the preparation of the walls and ceiling for finishing.

We will perform similar work in the kitchen, bathroom and toilet.

After rough cleaning, it will be necessary to prepare the walls in the kitchen and toilet for laying tiles on the walls and floors. Facing tiles can be laid with your own hands, but it is troublesome and takes a lot of time. Therefore, it is better to entrust the laying of tiles to masters specializing in this kind of finish. While the tiles are being laid, you can do your own repairs in one of the rooms of the apartment. The best option would be to lay decorative plaster or liquid wallpaper on the walls. If at the time of the start of repairs in the apartment of the new building, the double-glazed windows in the windows were in a satisfactory condition, then you can start applying plaster on the walls of the room immediately.

Upon completion of the laying of tiles on the floor and walls in the kitchen, bathroom and toilet, you need to lay inexpensive linoleum in the corridor connecting these three rooms and the room in which the renovation was carried out using decorative plaster. This will reduce the amount of dust being raised and make cleaning the apartment easier.

Before finishing the walls in the apartment, it is necessary to align, and if a defect is found, to repair the interior doors. If your future plans include wallpapering, normally closing doors are essential for high-quality wallpapering. After the wall decoration is completed, we proceed to laying linoleum, laminate or carpet on the floor of the apartment. The most practical is considered to be a laminate for living rooms; for a corridor, an office version of linoleum with increased abrasion resistance. This type of work does not require special qualifications and is easily done with your own hands during the renovation of a new building apartment.

The final stage of the renovation is the connection of lamps and the installation of furniture in the apartment. Approximately 70% of the volume of work during repairs in a new building is quite available for doing it yourself. And only when performing special types of finishes - laying parquet, installing stretch ceilings, installing double-glazed windows or entrance doors in a new building, you will need the services of specialists.