In detail: simple DIY bathroom repair from a real master for the site my.housecope.com.
To make a quality bathroom renovation, you don't have to have big finances. Indeed, if you wish, you can significantly save money.
For example, you can refuse the services of a designer and yourself come up with a style in which the renovation will be performed.
You can also save on the construction team and do everything yourself.
But in order for the process to be established and the result achieved, it is necessary to draw up a detailed plan of action in advance.
So, you will need:
Come up with a design;
Stock up on the necessary materials and tools;
Make an estimate;
Calculate the exact dimensions of the bathroom and the dimensions of the plumbing;
When choosing a design, you need to pay attention to the area of the room. Owners of a small area should take into account that a small space is less functional.
Light colors in the interior and large mirrors on the walls will visually enlarge the room.
You can refuse to install a bath and give preference to a shower cabin. Thus, there will be more space in the room.
For hygiene products, instead of bulky floor-standing cabinets, you can hang compact hanging cabinets.
After you have decided on the choice of design, you need to draw up an action plan. After all, in order for the process to go on continuously, all actions must be performed sequentially.
Neglecting previous work can significantly affect the final result.
This is a very important stage in the renovation. An unpleasant moment may be that if the calculation is not correct, there may not be enough tiles, panels or other building materials.
Indeed, in the process of cutting and masonry, some of the material can be damaged. To avoid such an incident, you should initially purchase building materials with a margin.
Video (click to play).
To remove tiles from walls and tiles from the floor, you need to stock up on a hammer and chisel. However, it will be easier to cope with the work with a punch or drill. There are two options for dismantling: gentle and emergency.
The first is done with a hammer and chisel. First you need to soak the grout, and then carefully separate each tile from the wall or floor.
The second option is much faster, but more “dusty” and “noisy”. To do this, you just need to demolish the coating with layers using a perforator.
First of all, a screed device is installed. If the installation of an additional "warm floor" system is not provided, the height of the screed will be 1-1.5 cm. The height will be 3-4 cm if the floors are further insulated.
There are several types of "warm floor" system: water, film and electric. Any of the systems preserves the microclimate in the bathroom well, at the same time it has a low cost and is easy to install.
Today on the market there are materials for the bathroom for "every wallet". First of all, it all depends on the finances that you have. Most often, tiles are laid on the walls.
But you can choose a more budgetary option, for example, plastic panels or special moisture-resistant plaster. At this stage of the repair, everything depends on your imagination and finances.
When repairing the ceiling, it is worth starting from the materials that were used on the walls. So, for example, elastic vinyl film looks very nice with tiles and plastic.
If you plan to make a ceiling with different transitions, then use a special moisture-resistant drywall. However, there is also a more budgetary option: plastic panels.
After all the finishing work has been completed, you can install the bath, furniture and plumbing.Do-it-yourself repairs are not easy, but very informative. Plus it can save you money and make the design exactly the way you want it!
Good day, ladies and gentlemen! I want to tell my story of bathroom and toilet renovation, separate. Since the purchase of the apartment, the renovation of the bathroom was postponed for 3 years, since other rooms were the priority. Now the right time has come, we were just on vacation with the whole family in another city, spontaneously decided to come home a month earlier before the end of the vacation to start work. This was at the beginning of 2016. Therefore, all materials were purchased in Mirny, if they had planned in advance, they could have been ordered from the mainland and would have received significant savings. The budget turned out to be in the region of 150 thousand (approximately, another + -30 thousand), purely according to the materials. The main amount is collected from baths, tiles, plumbing. Basically I did all the work myself, if others did, then I can safely add another 150-200 thousand to the amount of materials for the work (probably). In our city, all prices are very high, this is a fact.
We have a house in 1996, the area is small, the bathroom, toilet, and balcony are very tiny. But the prices of apartments are the same as in Yakutsk, but the squares are lower.
Probably I will make a post in the form of a photo report with notes. We got a lot of photos.
On the floor lay old Soviet square tiles, which were glued either with concrete or with super glue, hammered with a perforator for 3 days 3 nights). Sorry neighbors again. The walls were covered with wallpaper that was painted.
A good semi-professional assistant in the repair and cleaning of carpets.
I bought tiles, I honestly don’t remember how much they cost. Wall-mounted ones cost 110 rubles / tile. Russian production. The quality is 3 minus. Even in the same box, the dimensions in length and width are different, so when you glue, the level begins to play. And if they had ordered from the mainland in advance, then for this money it would have been possible to order branded imported tiles, they do not say such a jamb.
A simple toilet, for 7 thousand. Karl. Big mistake.
The bathroom is acrylic, I like it, voluminous. Length 150 cm.
The old bathtub was made of metal. cooled down quickly.
The preparation of the sub-floor is in full swing. Deep penetration primer application. Then the concrete screed.
Neighbor Aunt Lyuba made adjustments from time to time, Soft tasty buns!
Work on replacing old metal pipes. I called the plumbers of the housing and communal services, they cut off the water, made 2 transitions to plastic from the hot water and cold water risers, and also installed 2 counters, 1 heated towel rail. Having emptied my wallet for $ 10,000
This photo shows how old metal pipes are clogged.
For a complete replacement of pipes they asked for another 15 thousand rubles. This is without breaking the walls. And my wife had an interesting idea. After watching a video on the installation of polypropylene pipes on YouTube, I decided to do it myself. I bought a welding machine for 2 thousand rubles. In principle, nothing complicated. The main thing is not to overexpose the pipes in the welding machine.
Didn't like the paint on the wall. To remove paint, I made just such a structure from a 5 liter bottle with a connection to a vacuum cleaner. The result was not particularly pleasing, because very long, dusty and noisy. I'll tell you in advance, it's easier how to do it: the paint that leaves itself - we clean it, then we go through the paint again with a scraper or chisel, then we buy a solution - concrete contact, apply and that's it. The surface becomes flaky, like coarse sandpaper. Tile glue is calmly adhered to it.
There are traces of a grinder on the wall.
Since the floors are very uneven, the slope is 3-5 cm per 1 meter, it is necessary to make an even level using the so-called beacons (green dots on the floor). Then, between the beacons, we throw a concrete solution and connect the beacons. We will fill in the inner squares along these lines.
As a result, we get a flat floor.There will be a bath on the right, so I decided to save some concrete there, we will level the level with the help of the legs.
Next, a layer of waterproofing is applied. For every fireman. Before each layer of concrete or waterproofing, apply a primer for better adhesion.
We glue the tiles, make a distance of 2mm between the tiles, using crosses. In the future, the inter-tile space is filled with a special grout.
Bath installation. Behind the bathroom, he chipped the wall and put a pipe from the mixer in there. When you switch the mixer mode to the shower, water will flow from the top. This is the wife's idea.
On the left is a strobe for electrical wiring, we connected a washing machine and made sockets. Right for the shower. Red is the concrete contact layer.
2 mixers)) The bathroom fills up 2 times faster))
We begin to glue the tiles on the wall from the level of the bath. First we go through 1 horizontal line, then 2 rows of tiles. You can see how to glue tiles on the Internet, I watched YouTube)). There you can find the entire repair process.
By the way, our walls are very crooked, sometimes with a propeller, sometimes with a slope. nightmare. And no one knew how to level the walls and would not have time. The most difficult areas were the corners. More glue, time and nerves. Now the walls are not crooked at all.
My mistake. I glued the mirror to the tile glue. The mirror is old from the previous owners.
Here you can see very clearly. Above, the corner goes back to back, and from below it begins to diverge. The question was solved by grouting and more glue)).
The ceiling has already been made. Lighting - 5 point diode lamps, enough for the eyes. A shower is installed, it works well (China), bought in Yakutsk, I don’t remember which store.
Drying glue spoiled the reflective layer.
Dismantling with your favorite hammer drill.
I bought an ordinary countertop, we have nothing but ordinary things in our city. Or in the tridoroga they will make to order "cool type".
Found a bedside table just in size.
Not a single centimeter between the cabinet and the bathroom. End-to-end. My perfectionism gets high. I installed the tabletop on the corners in the wall and on the bedside table. Holds on tight. At least jump.
Voila. The joint was smeared with white sealant.
Here is the final result.
The skirting board needs to be redone, hack. The shower is good.
Toilet. The foundation has been prepared.
Concrete screed. It is done like in the bathroom.
Waterproofing. Don't forget about the primer.
And we begin to glue the floor tiles.
There are many pipes, meters, etc. To hide all this wealth, we make a frame structure from profiles with drywall.
A concrete contact is also applied to the drywall, then the tiles are glued. The ceiling is the same as in the bathroom, here it is 2-point. By the way, both the bathroom and the toilet are equipped with ventilation systems (fans). A very useful thing.
A hidden shelf was made behind the toilet.
That's all. In time, I spent a year. 1 month did the main thing. Then a little bit, then the doors were changed, then they made a shelf in the toilet.
In Yakutsk, you can do everything even cheaper, and in a more original way, there are more choices in stores and prices are lower than ours. So go for it. The post was made so that others are not afraid to make repairs, everyone can also, even better... The main desire.
There are many reasons to start renovating a bathroom: plumbing equipment has broken down, the bath has lost its original shine, old tiles have fallen off, and mold has started in the corners.
As a rule, one attempt to change something in the interior brings with it a number of design ideas, and as a result, light cosmetic touches turn into a global overhaul. Let's try to put everything on the shelves and understand the nuances of the repair work.
There are two ways to create a design project. You can contact the bureau and order a bathroom project, providing the dimensions of the room and choosing one of the fashionable styles. The company's specialists will make calculations and, taking into account your wishes, select several options for a possible interior design.
Get ready that the fantasies of designers will have to be paid for, and remember: the more famous the company, the more expensive the finished project.
However, there are no guarantees that the proposed options will suit you - you may not be satisfied with the color, the choice of plumbing, the price range of materials for repair, or the recommended style.
Thanks to the abundance of information in magazines, books and the worldwide Internet, you can independently draw up a sketch of the future bathroom, study the characteristics of modern plumbing, and choose the wall cladding to your taste.
And most importantly, you will be able to draw up a project based on your own style preferences. Cold hi-tech, strict classics, luxurious art deco, sophisticated rococo - reflect any ideas first on a sheet of paper, and then in life.