In detail: DIY home renovation from scratch from a real master for the site my.housecope.com.
So, you have a happy event - it's time to renovate. This was preceded by the purchase of a new house, apartment, or the realization that you need to change something in your old home. You need a clear understanding of where to start and what should be the sequence of apartment renovation.
In order not to lose money, time and nerves in the future, we will clearly define the sequence of actions before purchasing materials, inviting a brigade and demolishing walls. There are quite a few programs and sites that will clearly help you understand what you want to see in your new home. Look at glossy magazines, photos with pictures - decide on the style of the interior. At this stage, you need to understand - will you completely determine the future look of your home yourself or use the services of an interior designer. Renovation of an apartment or a private house always begins with drawing up clear plans and schemes. If you think that it is better to entrust the interior design to a professional, then the designer will help:
- Decide on the style and color scheme of the house
- Draw up diagrams of the necessary engineering communications: electricians, plumbing, ventilation, heating, possibly a system of built-in vacuum cleaners
- Draw up a plan of internal partitions with a delimitation of space for all the necessary residential, technical, utility zones
- Make an estimate for rough and finishing works
- With the arrangement of furniture, electrical outlets and plumbing fixtures
- Sometimes in the procurement of materials
- Carry out all repairs from start to finish
The services of designers are not cheap, but if you do not have time to think over the interior and fully control the renovation process, then a professional can take on such a burden. After all, it is possible to involve individuals in different stages of primary planning that you cannot handle on your own.
Video (click to play). |
Now you have decided what you want to get in your new home. Now you need to understand whether it is possible to implement all your plans.
Interesting: psychologists advise starting any business with a clear definition of an action plan and an understanding of the end result. Whatever happens, as A. Herzen said: "I did nothing, because I always wanted to do more than usual."
Unfortunately, many beautiful projects “crashed” on load-bearing walls, sewer risers and air ducts, which cannot be touched according to urban planning standards. When receiving documentation for a new building or a newly purchased apartment, usually, the new owner has a floor plan or diagrams, where all load-bearing partitions and utilities are indicated. This will allow you to adjust your project so that nothing breaks. If you decide to make changes to the capital structures of the house, then you will have to take care of all the permits for this before starting construction.So, there are permissions, the project is printed, you can get down to business. The next question is: who will be the executor?
- Should I hire a brigade?
- Conclude a contract with a contractor?
- Or do it all on your own?
It is necessary to approach this issue with a clear understanding of your financial and time capabilities, as well as honestly assess your professional qualities as a builder. As with planning, some part of the work can be done independently, and something can be entrusted to professionals, or, nevertheless, all the stages of the repair can be entrusted to the masters.
The choice of professionals is also not easy.But many advise using the services of an organization or team that worked for your friends or relatives. Or at least visit the objects that have already been repaired by the forces of your chosen builders or are in the process of being renovated. This will help you evaluate the result, give you the opportunity to talk with customers.
Any organization gives you a guarantee for the work performed by it. However, the cost of hiring a separate crew is likely to be substantially lower than that of a construction or contractor.
We erect all the necessary internal partitions, observing the dimensions of future doorways, so as not to subsequently cut out the excess or lay the unnecessary. If you do not completely trust the plan that you have, then you can visually look at the future result of your planning. To do this, you can take several blocks or bricks and put them in place of your future partitions. So you may realize that you have left little space, for example, for a pantry or a bathroom. By the way, such mistakes can be avoided by a competent and experienced designer-designer. But as they say - trust, but verify. Then you live in this house.
The next stage of work will be to carry out all engineering communications that are necessary in your individual home. You should have defined their list at the initial stage:
- Electrical wiring
- Layout of television, telephone, Internet networks
- Air conditioners
- Distribution of heating systems: batteries and underfloor heating
- Lining of sewerage and water supply systems
- Laying of air ducts and ventilation
- Installation of integrated hoses for dust extraction systems
It is important to do this almost at the very beginning, so that later you do not shred the plastered or painted walls, so as not to stumble over the wires that you did not think to hide.
Next, we proceed to the rough work. We level all surfaces, carry out the so-called pre-finishing, that is, the dirtiest stage of repair work. How long you will then enjoy your new home depends on the quality of this stage and compliance with all technological periods. Take your time and let the screed and plaster dry.
When all the preparatory work has been completed, finally comes the most joyful stage of apartment renovation. Finishing work allows you to fulfill all the bright decisions of the owner and designer. And at this stage, it is advisable to follow the sequence of apartment renovation.
First, we finish the ceilings clean, then the walls and after that the floors. But when ordering stretch ceilings, sometimes it is better to completely repair the walls: paste over with wallpaper, paint or plaster with special textured plaster, and only then stretch the ceilings. The floors, after they are ready, are covered with foil or other covering material so as not to spoil them.
We also observe all temperature conditions and time intervals: let the glue, plaster, paint dry out. At the last stage of work, we install doors and platbands to them, as well as all electrical points: sockets, switches, chandeliers and lamps. We install plumbing fixtures, skirting boards.
The renovation is almost ready! Now you can import furniture, hang curtains, decorate the interior and drive into a new house!
Overhaul of an apartment, as well as cosmetic, and renovation of a new apartment must begin with clear planning. But, in addition, you need to think over which engineering equipment requires replacement or reconstruction, which partitions to leave, and which to demolish. We'll have to revise all surfaces for any defects. Unlike renovation of a new building, overhaul begins with dirty work to remove non-working systems, old coatings, unnecessary walls. And then you continue according to the already described plan. As a result, the sequence of apartment renovation in the case of a capital approach can be reduced to the following plan:
- Drawing up a design project;
- Dismantling - taking out furniture, removing lighting fixtures, disassembling plumbing fixtures, removing old finishes, windows, doors, and floor screed;
- Inspection of engineering communications - water supply, sewerage, heating systems, as well as electrical wiring. Further, their repair or dismantling.
- Redevelopment (if provided for by the design project), namely the demolition of old floors, the transfer of door and window openings. This is followed by the installation of windows;
- Carrying out electrical wiring - this will require wall chasing, so this stage should precede the leveling of the surfaces;
- Breeding of water supply, heating and sewerage systems;
- Leveling the surfaces of the ceiling and walls;
- Floor screed laying;
- Construction of new plasterboard partitions in accordance with the design project;
- Ceiling, wall and floor finishing (in that order - from top to bottom);
- Installation of doors and lamps;
- Installation of household appliances, delivery of furniture and decoration of premises.
Unlike apartments, a private home requires more careful planning. Since at the planning stage it is also necessary to think over individual water supply, heating and sewerage systems. Arrangement of a boiler room, as well as a water intake unit with a filtration system, installation and connection of a septic tank or other treatment facilities, requires highly specialized knowledge and extensive professional experience. Such works determine your quiet life in the future, so it is better to entrust them to specialists.
Depending on the state of the house, the stages of repair may differ, but the following plan can be taken as a basis:
- Draw up a design project
- Calculate the amount of materials required
- Make a rough estimate
- Repair all communications, namely the water supply and sewerage system, ventilation, heating, gas and electrical wiring systems
- Replace old windows and doors
- Repair or replace the roof
- Make soundproofing and insulation of the attic
- Renew the facade of the house (partially or completely)
- Repair the interior
In addition, if a private house has several floors, then a competent layout and design of stairs will save you space, as well as bring sophistication and individuality to your home.
As they say, the road will be mastered by the walking one. Don't be afraid to get started and you will succeed.
The sequence of repairs in the house with your own hands: Step-by-step instructions from scratch with a rough finish + Photo and Video
Are there any plans for renovation in your house? Where to start, how to finish, how to carry out the work so that one does not interfere with the other and does not spoil it? First of all, it is necessary to draw up at least an approximate plan of all work, to derive an estimate of costs. It should cover all planned activities, including dismantling of old elements - batteries, lamps, window sills, switches.
In the event that it is planned to replace interior and exterior doors, windows, it is important not to forget about the subsequent cleaning and disposal of construction waste. This is a pretty big expense to consider.
Before starting construction activities, it is necessary to determine the amount of work to be done and their approximate cost, and correlate them with your own capabilities.
It is highly undesirable to make significant adjustments after the start of work. All important design decisions are made and approved in advance, because it is not always possible to change them later, but it is almost always costly.
Usually, after completing the preparatory phase, the homeowner finds himself in an empty room, in front of completely bare walls. It is still quite difficult for him to navigate the forthcoming volume of work and expenses. But he already has an idea of what color solutions are preferable for him, where what will be located, in which part of the house household and other appliances will be installed.
Need to pay attention on the number and location of windows, the level of natural illumination, because the need for artificial lighting in the room depends on this. Why is it important? The fact is that any repair most often begins replacement or re-equipment of power gridsincluding future locations for lighting fixtures, outlets and switches. This also applies to old, already inhabited houses, and those built not so long ago.
Every average household today has many different technologies that need a powerful, optimized branch network. Additional sockets and numerous extension cords are very inconvenient to use.
If it is planned to install an air conditioning system, then it is carried out in the same period. At the same time, all the necessary heating system fasteners.
In parallel, a number of works related to drilling, chiselling, making recesses, grooves and booms... This also includes other work, in the process of which it is necessary to "disfigure" the ceiling, walls and floor, as a result of which a large amount of various construction waste is formed: dust, pieces of gypsum, brick and concrete.
When all this garbage removed, you can start preparing the subfloor.
There are different options:
- preparation for underfloor heating;
- installation of a sub-floor from edged boards;
- leveling with a concrete screed.
The next stage of work refers to the windows. They are replaced if necessary.
If they completely satisfy the homeowner, then he simply checks the sealing of the cracks, the presence and condition of thermal insulation and window slopes. It is also checked whether the doors close and open well, whether there are distortions and other defects. After plastering and painting, it will be much more difficult to put them in order.
It is advisable to protect the inner window sills with a film from splashes of finishing compounds. This type of work is allowed to be carried out when installing doors, but the proposed option is more practical.
If the walls in the house need alignment and other necessary procedures, then the amount of compounds and mixtures required for this must be calculated in advance.
Materials tend to end unexpectedly at the wrong time - it is advisable to protect yourself from this.
The owners are constantly faced with various fundamental questions.
There can be no two answers to this question: before moving on to finishing the walls, you need to complete the preparatory work with the floor.
After cleaning, it must be prepared for the final, decorative coating.
The coating itself, regardless of its type and type, is done last.... This applies to self-leveling floors, parquet, laminate, linoleum and other types.
And at this stage, the prepared base is protected with foil, cardboard or several layers of newspapers. This will greatly facilitate subsequent cleaning and cleaning.
Even before moving on to plastering work, you should complete all the proposed activities with drywall. Niches, additional partitions, functional and decorative details are finished completely before moving on to the next stage of finishing work - Wet... It is advisable to perform all work of this kind within one working cycle, so as not to return to them again later.