DIY energy meter repair

In detail: do-it-yourself electric meter repair from a real master for the site my.housecope.com.

We disassemble the energy meter CE101-R5

Friends, we have a review of the updated CE101 meter in the R5 case and compare it with the meters in the universal R5.1 case.

This electricity meter did not work much, and then broke down a little. I will say in advance: the reason for the failure is the counting coil.

Actually, Energomera CE101-R5. and in our case, the reader, the CE101 R5 145 M6. that is, the counting mechanism here is mechanical and six-bit.

Image - DIY energy meter repair

Image - DIY energy meter repair

Such single-rate electricity meters are inexpensive, and, regardless of the manufacturer, of course, they break down from time to time. In my practice, there are examples of failure of completely different metering devices, nevertheless, I do not presume to judge the mass or the weighted proportion of failures. The manufacturer's warranty obligations are important here. For some of the manufacturers, the conditions are softer and easier, for others, on the contrary, it is more difficult and harsh. Energomera. I must pay tribute, does not insert a spoke in the wheels. Maxim died, and ... IPU - an act from the network (or management / maintenance) company is enough and the device will be replaced. However, at a cost of a little over four hundred rubles, it is easier to buy a new one, change it. It's faster and takes less action. Then call a representative of the network organization for sealing.

At the current time, networkers' visits are free.

8. Actions to be performed by retail market entities in accordance with this document, including actions to put metering devices into operation, to install seals and (or) visual control marks upon completion of the metering device commissioning procedure, to take and provide readings metering devices are committed by them without charging a fee for their commission, unless otherwise expressly established in this document.

Video (click to play).

(decree of the Government of the Russian Federation dated 04.05.12 No. 442)

But ... there is an opinion that everything may change very soon.

Say, this whole procedure will gradually change. Already starting to change. A Dismantling Act is likely to be mandatory for free commissioning. If the subscriber says that there was an accident or something else, then he goes to the PRUE for a copy of the order.

Image - DIY energy meter repair

Image - DIY energy meter repair

Perhaps I will not express my preconceived opinion, limiting myself to a simple uploading of photographs in approximately the order in which the Energomer counter was sorted out.

Reader, do you have any preferences when choosing counters? Or maybe electricity suppliers impose something specific, don't they?

In Tomsk, according to the program, the big brother CE101 - R5 was installed in the whole city, the CE-101 counter, it was in 2011. On the housing stock of 50 five-story buildings, 6 driveways, 15-20 percent of 100 were replaced, some just a week after installation. Some stopped, others showed a constant load, and still others gave readings that were two or three times overestimated. There were three cases when they burned out from the inside, I don't know for what reason - the back wall of the meter melted.

8. Actions to be performed by retail market entities in accordance with this document, including actions to put metering devices into operation, to install seals and (or) visual control marks upon completion of the metering device commissioning procedure, to take and provide readings metering devices are committed by them without charging a fee for their performance, unless otherwise expressly established in this document.

(Decree of the Government of the Russian Federation dated 04.05.12 No. 442)

Please, for more details about this decree! I tried to find its full version - the content is completely different. in Tomsk, power sales demand 500 rubles for resealing.

consultant plus will help all of us. I recommend, among other things, to look at the footnotes.

Recently, the same counter, or rather its counter mechanism, has died. I called the office where I took it. There, specifying the release date, they said that at least in 2011 there was a large batch in which this defect was massively manifested. The plant itself admitted this. They seem to change without problems and right away, only an act from the energy supply is needed.

You do not know where you can look at information about the influence of voltage quality (drawdown, etc.) on electronic meters, in particular an energy meter.

Alexey, please advise the manufacturer of a model of a reliable and accurate meter in your opinion (for installation on a dinreyk). At the same time, I would like it to be inexpensive, to occupy the minimum space on the dinraik. Maybe electronic ... Although not important.

take any one based on a simple rule: "the cheaper the better" while it is advisable to ask the seller the order of treatment in case of anything. whether it is necessary to write a petition, a death certificate from networkers secured with a large official seal, etc.

this disassembled energy meter costs 400 rubles, it can be exchanged without any problems, well, it's not a pity to throw it out either

But I’ll say that recently the quality of Energomera has dropped sharply! and the number of refunds increased by 15 percent.
therefore, in principle, I stopped putting it on people.
I can't stand mercury due to the fact that it cannot be crammed onto a din-rail, or rather crammed, but it takes up so much space that it's just awful!
as a result, he began to constantly use Neva counters. while there were no refusals (I asked the marriage department in the ABC store) very convenient terminal blocks, solid covers and latches on the rail itself.
for the price they practically do not differ from the others.

O! By the way, I'll drop into ABC live to see the dimensions of different options.

It is quite easy to understand that the electric meter has broken down. This requires a visual inspection of the device. Obvious reasons for the breakdown:

  1. The electricity meter has burned out. The body is melted, burnt marks on the contacts, the smell of burning.
  2. Mechanical damage to the case and sight glass (cracks, dents, chips).
  3. Change in readings (the disk began to spin strongly without load, or vice versa, stopped and does not spin when powerful consumers are turned on).
  4. The appearance of noise during the operation of the counter.
  5. The electricity meter does not show readings, while there is light in the house. There is also no light indication. Such a malfunction occurs with electronic models.
Read also:  Repair of heated seats Renault Logan do it yourself

Image - DIY energy meter repair

These are the main malfunctions of electricity meters. There are other breakdowns, so in any case, even if you have a different situation, the information provided below will help solve the problem.

As soon as you are sure that the meter is not working, the first thing you need to do is call the power supply organization and report the incident. If a non-working electric meter in an apartment presents even the slightest danger: hums, smokes or smells burnt, be sure to turn off the voltage at the input. After that, you will need to come to the organization yourself and ask for a sample application, after writing which the representatives of the energy sales should come to your home (the approximate date and time should be said immediately).

Image - DIY energy meter repair

On site, the inspector must draw up a report on the malfunction of the electricity meter. To do this, he examines the device for third-party interference in its design, takes the last readings and after that he already draws up a document. Be sure to specify when drawing up the act what cause of the breakdown the inspector writes in, so that later there are no disagreements and resulting problems.

Important! Never try to repair the meter yourself! If you even find that the cause of the breakdown is in poor contact or its absence, you should know that opening the seal can lead to a considerable fine.

If the electricity meter does not work and you have already reported this to the energy supply company by writing a corresponding statement, the payment for electricity will be based on the average monthly rate. It, in turn, is determined by the previous reporting periods. In more detail, this information is set out in the Rules for the provision of utilities, Resolution of the Government of the Russian Federation No. 354, p. 59 "a".

Please note that payment at the average rate will occur only for the first 3 months after fixing the fact of meter failure. If the replacement is not completed before this time, you will have to pay according to the standard. We talked about how the calculation of electricity according to the standard is carried out in a separate article.

As for the replacement of the meter, it is paid at the expense of the energy supplying organization in several cases:

  1. If the meter is out of order through no fault of yours.
  2. If the electricity meter is located on a municipal territory.

In other cases, the owner will have to pay for the replacement or repair, i.e. you, even if it is located at the entrance to the site. Of course, if the electricity meter breaks down through your fault (for example, due to overload, shock, and even more so after installing the magnet), you pay.

One of the reasons for the breakdown of an electric meter is seen in the video:

That's all we would like to tell you about why the electricity meter does not work and what to do in this case to eliminate the malfunction. We hope the provided steps have helped you solve the problem!

The single-phase model of the Energomera CE 101 meter belongs to common metering devices. It is a simple and reliable device with a 5-year warranty, and enjoys a good reputation among users.

Electricity meter Energomera ce 101

According to the principle of operation, Energomera CE 101 is an electronic device in which the measured voltage and current are multiplied using sigma-delta modulation. The signal is then converted to a value that is proportional to the power.

The signal has a pulse character, and the pulses are summed up by an electromechanical type counting device or a microcontroller. The result is displayed on rotating drums or on an LCD screen. There can be one or two current circuits. If there are two, the highest current is recorded.

The Energomera ce101 meter refers to modern devices that have the ability to connect the meter to ASKUE (automated metering) systems or for verification operations. Devices with LCD have a memory, independent of the presence of power supply, which allows storing measured values ​​in case of disconnection from the mains, and a liquid crystal display with information displayed. If the display is damaged, then the data can be read after connecting a working screen.

Energy meter CE 101 with LCD display

Connection to automated accounting systems is carried out using special leads on the front of the case, closed with a plastic cover.

The CE 101 counter is equipped with indicator lights. Some devices have two LEDs: "Network" and "A". When one of them lights up, with the inscription "Mains", it means that the device is connected to the mains. The second one blinks when the load is connected.

Other device modifications have one LED "3200 imp/kW*h"Operating in two modes:

  • in the absence of load, it burns with an even light;
  • When the load appears, the LED starts flashing, the flashing frequency is proportional to the load current.

Some models have a "Rob" indicator. Its lighting up indicates the reading of the reverse power.

If the Network LED is off, there can be two reasons:

  1. Due to incorrect connection of the Energomera CE 101 meter. Check the diagram and check the reliability of the connected contacts;
  2. Fault in the device or in the LED itself. The device must be sent in for repair.

When the "Mains" indicator is on and the counter does not work, the device must also be sent for repair.

Glowing LED of the electricity meter

Inside the case there are:

  • a measuring module in the form of a printed circuit board that converts the power into a pulse signal;
  • one or two current sensors (current transformers, shunts).

The counting device has been developed in several forms and has the following features:

  1. If the device has an M6 index, then six digits are displayed for reading, M7 - 7 digits, without an index - an LCD display with seven digits;
  2. The last digit is separated by a comma and has a red border on mechanical displays;
  3. The drum mechanism has stoppers that prevent the countdown;
  4. Energy meter with LCD display is protected from external electromagnetic fields.

Readings of a six-digit electric meter

Important! If the work of the electric meter Energomera ce 101 is required at low temperatures, then a device with a mechanical counter is more reliable. The declared operating temperature limits for it are wider (from -40 ° С to + 70 ° С). Despite the fact that for a device with an LCD screen, the indicated limits start from -30 ° C, practical experience shows that it is better to use them in rooms with heating.

The connection of a single-phase metering device Energomer occurs according to a unified scheme.

There are two (phase zero) or three (phase, zero, "earth") wires at the entrance to the apartment's electrical network. First, you need to choose the option of how to connect the meter using a single-pole or double-pole circuit breaker.

Read also:  Repair washing machine samsung s803j DIY repair

Electricity meters CE 101 are available in two installation options:

  • S6 - direct mounting on the panel wall;
  • R5 - DIN rail mounting.

To connect the electric meter Energomer ce 101, in accordance with the technical documentation, there are 4 contacts located in the lower part of the front panel:

  • 1 - phase wire of the input cable;
  • 3 - phase wire outgoing to the load;
  • 4 - "zero" wire of the input cable;
  • 5 - wire "zero" load.

In the documentation, these four contacts are sometimes designated: 1, 2, 3, 4.

Wiring diagram for meter contacts

Important! If there are three wires at the entrance to the single-phase network of the apartment, the "ground" wire is not used when connecting the electric meter, it is connected to the grounding device.

When performing the circuit using a single-pole circuit breaker, only the phase wire must be inserted through it, and the zero wire must be connected directly. But the use of a two-pole device with the establishment of both phases and zero through it is preferable, since in emergency situations the neutral conductor may be under high voltage.

Important! If a wiring diagram with a two-pole circuit breaker is used, two single-pole devices cannot be used instead.

To install, you will need:

  • depending on modification, fixing screws, DIN rail;
  • the counter itself;
  • automatic switches for installation in front of the meter and for load distribution after the meter;
  • copper wire for installation with a diameter of 1 to 6 mm;
  • voltage indicators;
  • working tool (pliers, screwdrivers, etc.).

Important! Before starting work, it is necessary to remove the power from the input cable, check the absence of voltage with an indicator or multimeter.

Installation diagram of a meter with a two-pole circuit breaker

Step-by-step installation of the electric meter Energomera ce 101:

  1. Mark where the meter and machines will be located.Counters should not be placed below 160 cm from the floor or other base, otherwise it will be inconvenient to read the information;
  2. Using a level, check whether the future installation is horizontal and drill the mounting holes;
  3. The first is the installation of the meter, then the circuit breakers on the panel wall or DIN-rail;
  4. The input and load cables are inserted into the meter box. When installing outside buildings, sealing glands must be installed at the entry points;
  5. Separate the wires carefully and remove the insulation cover about 300 mm from their ends;
  6. Make wires of the required length for assembling the electrical circuit between the meter and the machines and mark them to facilitate connection to the right places;
  7. Before making the connection of the input cable, apply the supply voltage and check the location of the phase and zero wire with the indicator. Then turn off the voltage again;
  8. Connect the input cable to the 2-pole circuit breaker: top right - phase cable, left - zero. In the case of using a single-pole circuit breaker, start a phase conductor through it;

Connection diagram with a single-pole circuit breaker

  1. Connect the wires to the electricity meter according to the diagram. Insert the stripped wire straight into the desired terminal, excluding distortions. Make sure that the coated conductor does not fall into the clamping area and that the bare part of the conductor does not protrude. Each contact has two screws. The screw on top is tightened first. Then you need to check that the wire holds well by slightly tugging it several times. Then tighten the bottom screw. Wait about 5 minutes, after which both screws are tightened again;
  2. Apply power to the machine.

Important! Installed electricity meters are subject to mandatory verification and sealing with the participation of a representative of the power supply organization.

For a three-phase meter Energomer, the connection diagram is different. There, three phases are started on the device, and three-phase machines are used. The neutral conductor of the three-phase network is connected directly to the device, bypassing the circuit breaker.

Energomera metering device is designed to read readings at one tariff. The liquid crystal screen simply shows information in a different form, but there is no way to program the device and keep multi-tariff accounting.

The readings are written off from the device, discarding the last digit. Then the result is calculated by comparing with the previously recorded value and multiplying by the value of the applied tariff.

Important! The display of a new device may contain indications that appear during the verification of the electric meter in production conditions. The calculation of the first amount of the consumer's electricity consumption is based on this figure.

The manufacturer puts protective devices on the electricity meters:

  • a metal seal, which indicates the verification performed;
  • protective hologram.

Protection reveals whether the device case was opened on the way from the factory to the consumer. Sometimes they offer to buy devices in which a module is installed that serves to stop the meter using remote control. Specialists can easily find additional equipment on an electrical device, even if the fake hologram and seal are well forged. The owner of such a meter is charged a large fine.

The operational life of the device is 30 years, the secondary verification is carried out after 16 years, counting from the date of installation. The meter attracts many electricity subscribers by its low price, which is an average of 700 rubles.