In detail: do-it-yourself apartment renovation without finishing from a real master for the site my.housecope.com.
They buy an apartment from a developer, often conclude a contract without finishing or with a rough finish. This is not only a way to reduce payments, but also to do all the work with high quality. Although renovating an apartment from scratch in a new building is a long and costly business.
If you purchased a property from a developer without finishing, you will need a step-by-step work plan. To a person who is not particularly familiar with construction, the repair procedure is not at all obvious. And since renovating an apartment from scratch in a new building will require going through all the stages, a plan is simply necessary.
Apartment renovation technology in a new building - it all starts with a plan
To determine the scope of work, you need to know where you will start. What you will receive after the commissioning of the object is spelled out in the contract. Therefore, we take it, read it carefully, then you can start planning the order of work. Usually an apartment in a new building without finishing is rented in this condition:
Installed windows (usually double glazed windows) and entrance doors (cheap and not very reliable).
Unfinished walls (concrete or brick, building blocks), internal partitions - depending on the contract: they may or may not stand.
Renovation of an apartment from scratch in a new building: everything there is - entrance doors, walls, windows, heating, water supply, sewerage and gas
Only the kitchen can have one plastered wall - gas workers require a meter to be installed
Basically, this is all you have before you start renovating an apartment from scratch in a new building. Everything is in its infancy, but all communications have been brought up.
Video (click to play).
You should immediately decide on the partitions. Decide where and which ones will stand, which ones will need to be removed / moved. If there are already partitions and you are going to redo something, you need to get permission and only then proceed with the transfer. If there are no partitions and you will install them yourself, the contract specifies what materials you can make them from. It is better to adhere to the recommendations, otherwise you can get penalties, and they are considerable.
Developing an apartment plan
After the approval of the apartment plan, you first decide where you will have large-sized furniture, appliances, plumbing, etc. You will need this data to prepare a plan for laying engineering systems (water supply, sewerage, lighting, if provided - ventilation). When the plan is more or less ready, you can proceed with the repair itself. The sequence of actions is as follows:
Installation, transfer of partitions according to the approved project.
Apartment renovation technology in a new building: we put partitions
Cold and hot water pipes, sewerage
Wall plastering - quality is important
Putty is almost a fine finish
We level the floor with a screed. Renovation of an apartment from scratch in a new building is almost finished
This is the procedure for renovating an apartment from scratch in a new building in general. There are particulars, but they are individual. Then, depending on the situation, shift or swap the stages.
VIDEO
Self-repair of an apartment from scratch in a new building will take a lot of time. If you have it in stock - not a problem. If you want to move into new housing faster, you will have to hire builders. This is where questions often arise. Whom to hire for repairs in a new building - a team that promises to do everything "on a turnkey basis" or individual specialists for each type of work? This issue has already been discussed hundreds of times, but no consensus has been reached. Both options have their supporters. So that you can decide, briefly about the advantages and disadvantages of both solutions.
Renovation stages in the apartment replace one another
If you hire a team that will do all the work from start to finish, you may not be satisfied with the quality of their work. All promise quality and speed, but few actually do all the work at the proper level. Very often you have to terminate the contract and look for someone who will complete / redo. This task is even more difficult than the search for the first brigade: no one wants to correct other people's mistakes. It is long and troublesome. These are the cons.
The advantage of this decision: the hired people are responsible for all stages of work, up to the finishing (if you so agreed). If you don't like something, you can try to force it to be redone, but it is better to control each stage of the work. The second positive point: repairs are progressing faster, since there is no need to look for performers for each new job. These are the pros.
Another moment of the organizational plan. When drawing up a contract, write down the cost of each stage of work. Then, upon termination, you will know exactly how much to pay. Otherwise, they will begin to prove to you that most of the work has been done, and that nonsense remains.
If you choose to hire separate specialists for each stage of the work, it is difficult to predict the end result. Since you have to complete a certain amount of work and leave, there is a possibility that workers will not try too hard. And each next specialist can say (and usually say) that mistakes were made before him and demand additional payment for their correction. There is only one way out: constant and tight control at all stages of work, clear execution of agreements with clarification of what you want to have at the end of them.
The result is not guaranteed
If you do not do some work yourself, then the total cost of paying for work by individual specialists will be higher. But the plus of such a decision is that you can "stretch" the spending over time. There was money - they did a certain amount of work.
Renovation of an apartment from scratch in a new building has its own characteristics. the new house will “sit down” for several years, the foundation, walls, and ceilings will move. All these movements lead to the appearance of cracks, and they can damage the finish coat. Therefore, there is advice: to use not the most expensive finishing materials, which you will not mind replacing in three to four years with new, better quality ones.
The choice of materials is a daunting task
Most of the questions arise with the tiles laid on the walls and the screed. Cracks in them are most noticeable, and pleasure is not cheap - both in terms of the cost of materials and the price of work. Therefore, the screed is made floating - without connection with the walls, and instead of tiles on the walls in the bathroom and toilet, they are finished with vinyl wall panels.
Tiles on the walls and floors are often laid in the kitchen, and they try to choose the most attractive collections, which cost a lot. There are two ways out. The first is to use a plastic or furniture board instead of a tiled apron in the kitchen, and lay linoleum on the floor for now. Second, lay the tiles, but have a certain amount in reserve to replace the broken tiles. After all, it is not a fact that in three or four years the same collection will still be produced. Yes, even if so, then the color to pick up one to one is unlikely to succeed.
Many of the owners of new apartments simply do not think about how quiet their home will be. Not yet before. But by the time you enter, it will be too late. The current trend in multi-storey construction is to make the construction as easy as possible in order to save on the foundation. Lightweight materials are great, but the problem is they conduct sound well.
Soundproofing in an apartment is an important point
As a result, it turns out that the repair is completed, and you, if you wish, can take notes of the conversations of your neighbors, and they are yours. Far from being a rosy prospect. Therefore, it is worth thinking about soundproofing. Yes, these are additional costs and considerable, but silence is more important.
VIDEO
Not so long ago, those who received a warrant for an apartment in a new building could move in and live in peace. Today, before moving into a new home, the owners will need to make repairs. Most housing is rented out without finishing. This is a way to reduce the cost of an apartment. Residents are given the opportunity to acquire their own corner at an affordable cost. The result is an economy option. The most popular type of housing is studio. The owners buy the walls without finishing, partitions. You will need to paint the walls, install plumbing, level floors, surfaces. The new settlers carry out a complete roughing and finishing work. The owners should not forget about the pre-finishing work. The correct procedure for repairs in a new building without finishing is described below.
When starting to renovate a new building, keep in mind that the finishing will be done from scratch. This is especially true for a studio apartment. Many people plan to make expensive repairs using expensive materials, which is unacceptable. The reasons for this are as follows:
the structure undergoes shrinkage for the first year, due to which cracks appear on the surface for the first time;
cracks are formed on the walls, ceiling, floor;
due to deformations, the decoration and repair of the apartment in a year will have to be done again, which will cause numerous problems.
Result of building shrinkage Cracks in plaster due to building shrinkage
It is necessary to start repairs with the following processes:
distribution of sanitary pipes;
wiring bookmark;
underfloor heating installation, screed filling;
leveling the surface of the walls;
construction of suspended ceilings.
The procedure for performing repair work in a new building cannot be changed.
Wall alignment Wiring bookmark Laying of sanitary pipes Floor screed
In the first year, you need to do the rough, dusty work with your own hands, go to the pre-finishing work, then the finishing work is done. It is recommended that you do the dirty work after you receive your keychain. This is not done by chance, new settlers who have received the keys to the apartment pay for a container for collecting construction waste. The whole house will be serviced.
The management company gets rid of the garbage within six months. If you do not start repairs right away with all the tenants, then you will have to take out the garbage, then you will have to yourself. Further export is no longer included in the cost of services.
Another important plus when performing rough, preparatory work after receiving a bunch of keys in a new building - no one lives in the house, which means that it is allowed to boldly make noise, work with a puncher, knock with a hammer at night and in the morning, which cannot be done later. After the completion of the main work, a fine finish is performed, you can stick inexpensive wallpaper, lay ordinary linoleum and for the first year after delivery you can be content with this for now. This economy option is suitable for young families starting from scratch.
The main work has been done, the house has become clean, comfortable, you can take a break. There are a number of works that tenants in a new building want to do, but experts strongly recommend giving up, otherwise then you will have to redo it again, both from the preliminary and all subsequent work, that is, to start from scratch.
It is not recommended to engage in the first year in a new building:
ceilings, make the walls in a studio apartment out of plasterboard, putty on finishing, take advice not as an economical option, take into account that at first all the seams are cracking;
laying tiles for the bathroom, any fine finish will do, poor tightness will lead to water flowing to neighbors, mold will appear from high humidity.
The tiled bathroom floor will be a barrier to other renovations.
The phrase that the miser pays twice is incorrect. The first year, such an economical solution will help save finances, especially for those who start from scratch.
If you still want to live immediately in normal conditions, then any repair work should be done by professionals. You can do it yourself if you are confident in your skill. It should be borne in mind that cracks may appear over time, but you can reassure yourself that they will be visible only when a person is resting on the couch.
In order not to have to redo something, it is necessary that any rough, fine repair work is carried out in a new building, and it does not matter whether it is a studio apartment or not, in a certain sequence. Seeing the bare walls of their home, each owner immediately has a question: "Where to start?" The repair procedure is as follows:
planning the space is simple to do. Even before the rough work is done, you need to draw a plan of your apartment on a piece of paper (or using a computer program). Decide immediately on the place of plumbing. It is necessary to outline the place of the bath or shower stall, toilet. The photo on the left shows exactly how you can install plumbing. Outline the kitchen, corridor. Especially accurately, everything needs to be planned in a studio-type housing;
Apartment layout
insert windows if they have not been inserted. Usually new buildings are rented already with inserted windows. But if there was an agreement that only the walls will be built, then you need to immediately think about which company windows to choose and immediately decide whether the installation will be done by yourself or by specialists. It is more profitable and more convenient if the work on installing windows will be entrusted to professionals. Ideal - if the apartment is already rented out with windows;
Installation
to lay out pipes for water supply, sewerage. The wiring starts from a common riser and is carried out for all plumbing. Install a toilet, washbasin, shower stall. Collecting the sewer is easy with your own hands. Uncertain owners should contact specialists;
Pipe routing
carry out the installation of electrical wiring - the work must be treated with maximum responsibility. Usually, in new buildings, the wiring is done, but it is not always of high quality. Check everything, if in doubt, change it. Electrical appliances may occasionally be present, but these are usually also of poor quality. Therefore, it is better to do it yourself at your own discretion. The economy option is inappropriate for this work;
Installation of electrical wiring
making a floor screed - arrangement in a new building is an important stage in the repair. If the building is made of concrete, then pouring the screed is necessary. It is necessary to fill the subfloor with concrete mortar, then level everything out. The lightest and most popular wet screed. The owner can make it with his own hands. With its help, the unevenness of the surface is eliminated, the cracks are smeared;
Floating screed
to align the walls - to do something grandiose with the walls in the first year is not worth it. The house will shrink and cracks may appear. For the first time, it is better to purchase inexpensive wallpaper for an apartment. It should be borne in mind that in a year you will again have to trim the walls, grease the cracks, that is, you have to start doing all the repairs anew. If the plaster or other fine finish has not been done, then it must be done, then leveled, putty cracks, irregularities. Additional finishing is not needed yet;
Aligning walls and ceilings
to make the installation of the ceiling - this work is one of the difficult ones. The ceiling can be anything. But experts do not recommend making a plasterboard suspended ceiling in a new building. With the shrinkage of the house, distortions may appear, and cracks may go along the seams. To get started, you can simply putty, level the surface and paint. For the first renovation, such a finish will be enough;
Installation of a suspended plasterboard ceiling
install doors - you need to install doors before wallpapering or painting the walls. When the ceiling, floor is decided, the doors are installed. Great attention should be paid to the entrance doors.It is not worth saving on them, here such an economical decision would be inappropriate. Solid ones with good sound insulation can be installed immediately.
Door installation
The studio apartment began to be in great demand. Economy option for a young family. Housing turns out to be inexpensive and young families can quite afford it. Before starting repairs in such an apartment, you must immediately outline where the recreation area, kitchen, corridor, and bathroom will be.
Often the owners receive apartments with main load-bearing walls. This allows you to make a special layout, to show imagination. Someone is satisfied with the studio option, someone needs separate premises. Partitions are made of plasterboard. Layout options may vary. The main thing is to decide during the renovation where you need to locate a particular room so that you do not have to redo it in the future.
New housing is a huge joy. Do not be afraid of self-repair work. This approach is a profitable solution. The owners immediately equip their own corner. You should not be in a hurry with repair work. Before you start, you need to consult with experts.
All stages of renovation work in a new building.
VIDEO
Almost always, new housing is acquired by a happy newcomer from the developer's company without interior decoration and repair, but with communications brought into the apartment. Firstly, such housing in a new building will be cheaper, and secondly, almost always the repair and arrangement of an apartment by the developer is performed extremely carelessly, using cheap materials. Thirdly, there is a desire to complete some stages of apartment renovation with your own hands or with the hands of good craftsmen.
First, you need to make an audit and inspection of the apartment, to establish problem areas of walls, ceilings and floors. Then we proceed in the following order. We determine what requires repair and finishing in the first place. If the time and money for a complete renovation of the apartment is not enough, it is necessary to put in order first of all:
Front door and windows, apartment ventilation;
Perform full and highest quality electrical wiring and wiring of sockets around the apartment. This stage must be thought out in as much detail as possible, draw up a connection diagram and a circuit for laying wires into walls;
Connect the water and collect the sewerage system in the bathroom and toilet, install a toilet bowl, washbasin and shower cabin;
If the start time of the renovation of an apartment in a new building coincided with the heating season, be sure to check the degree of heating of the aluminum registers with a remote thermometer.
In the process of carrying out the listed preparatory work, you can calculate the sequence of repairs in a new building.
Much in the repair of housing in a new building depends on the availability of time and money resources. Having bought a "bare" apartment and having issued the necessary documents for the right of ownership, you automatically start paying rent and housekeeping, for using the adjacent territory, for the removal of household waste and construction waste. After connecting electricity and water, a new apartment in a new building began to bring you a loss in the form of costs for its maintenance and decoration. The longer the repair time for an apartment in a new building, the more it will cost you.
There are two main options for approaching the issue of finishing a new apartment in a new building:
Planned renovation and finishing of the apartment. In this case, the owners draw up a detailed map and a schedule for finishing work, in which all the main types of finishing and installation of devices are prescribed in stages. Such repairs, as a rule, are carried out from scratch to completion by one team of craftsmen. The completion date of a repaired object may take several weeks or months. The disadvantages of this approach include the constantly growing price and cost of work, sometimes exceeding the cost of the estimate by more than two times. As a result, if due to unforeseen circumstances there are not enough funds, the repair can be delayed for an indefinite period.
Fast renovation from scratch.In this case, all the above stages of repair in a new building are carried out by the hands of hired craftsmen with direct control of the quality of work on your part. An apartment in a new building within a week will be prepared for further decoration of the rooms. In addition to communications, the smallest room of the apartment is finished and equipped with temporary linoleum and wallpaper. In such a room there are still no amenities, but it can be used as housing - a temporary hut and a warehouse for building materials. All other work is performed as free funds and time become available.
The first option is well suited if the family has small children or elderly people who need to provide some comfort and convenience. The second option is considered more economical and quicker, especially if, after finishing the kitchen, bathroom, toilet and one room, housing is rented, with the consecutive bringing the remaining rooms of the new building to condition.
Among the most popular horror stories for new buildings, it is customary to consider stories about the shrinkage of the walls of the house and its foundation. In reality, a similar process for a multi-storey building should finally be completed by the time the building is put into operation. This period is on average no more than 18 months. If, after 1.5 years, cracks form in the corners, the ceiling or at the joints and in the masonry of the walls, the tiles in the bathroom fall off, and the doors are deformed with skewed doors, this means that the new building has certain problems with the stability of the foundation. With the repair, you should wait until the main thing is clarified - what is happening with the new building.
Before starting work, first inspect the lock on the front door. The model and standard equipment of the door can be subject to separate agreement. Indicate in the addendum to the contract which model of door and lock you want to install. If it becomes necessary to take additional security measures, first of all, change the lock supplied when the new building was handed over.
At the next stage, it is necessary to resolve the issue of installing an electrical switchboard, connecting an electric meter. This will make it possible to start using a power tool when renovating an apartment. To get rid of the need to use a large number of carriers and extension cords, plan the layout of the electrical wiring in the apartment. When doing this, consider the following:
For kitchens and bathrooms, wiring must be laid in sealed hoses and sleeves;
Lay a separate wire cable to the bathroom for connecting a boiler or washing machine. The cable cross-section must be rated for a current of at least 25 A;
An additional wire must be laid to the place where the air conditioner is installed;
It is necessary to lead a wire to the bathroom, to the kitchen, to the hall, which will be connected and used in the future when organizing additional grounding.
In addition to electricity, in order to create more or less normal conditions, it is necessary to connect hot and cold water meters and collect sewage in the bathroom and toilet. It is necessary to start work with the installation of a toilet and a washbasin.
Considering that good plumbing is expensive, for the first time you can install an inexpensive version of the toilet, assemble and connect plastic sewer pipes, a bellows and a washbasin sink. During the renovation of an apartment, plumbing can be replaced at any time. The installation of expensive plumbing increases the risk of damage to it during the repair; it must be installed at the final stage of the renovation of a new building.
To lay a plastic water supply using a perforator, we pierce channels in the walls of the bathroom, toilet, kitchen with a depth of 2.5-3 cm. Next, you need to solder the water pipes and connect the leads to the cistern and washbasin. Finally, we will install and connect cold and hot water meters to the domestic water supply system.
Before starting work, you will need to perform a large amount of cleaning the remnants of concrete and mortar. The main part will be for rough cleaning of walls, floor, ceiling, their chasing, alignment and trimming of seams. Such work gives a large amount of dirt and dust, so it will be necessary to organize good ventilation and wet cleaning inside the new building.
A separate point is to highlight the preparation of floors in each of the rooms for finishing. During the repairs in the apartment, it will be necessary to close up all the cracks, holes in the seams between the slabs, in the floor, in the interior walls of the new building. The most difficult thing will be leveling the floor with a cement mortar screed and reinforcing mesh. This procedure will need to be performed upon completion of the preparation of the walls and ceiling for finishing.
We will perform similar work in the kitchen, bathroom and toilet.
After rough cleaning, it will be necessary to prepare the walls in the kitchen and toilet for laying tiles on the walls and floors. Facing tiles can be laid with your own hands, but it is troublesome and takes a lot of time. Therefore, it is better to entrust the laying of tiles to masters specializing in this kind of finish. While the tiles are being laid, you can do your own repairs in one of the rooms of the apartment. The best option would be to lay decorative plaster or liquid wallpaper on the walls. If at the time of the start of repairs in the apartment of the new building the double-glazed windows in the windows were in a satisfactory condition, then you can start applying plaster on the walls of the room immediately.
Upon completion of the laying of tiles on the floor and walls in the kitchen, bathroom and toilet, you need to lay inexpensive linoleum in the corridor connecting these three rooms and the room in which the renovation was carried out using decorative plaster. This will reduce the amount of dust being raised and make cleaning the apartment easier.
Before finishing the walls in the apartment, it is necessary to align, and if a defect is found, to repair the interior doors. If your future plans include wallpapering, normally closing doors are essential for high-quality wallpapering. After the wall decoration is completed, we proceed to laying linoleum, laminate or carpet on the floor of the apartment. The most practical is considered to be a laminate for living rooms; for a corridor, an office version of linoleum with increased abrasion resistance. This type of work does not require special qualifications and is easily done with your own hands during the renovation of a new building apartment.
The final stage of the renovation is the connection of lamps and the installation of furniture in the apartment. Approximately 70% of the volume of work during repairs in a new building is quite available for doing it yourself. And only when performing special types of finishing - laying parquet, installing stretch ceilings, installing double-glazed windows or entrance doors in a new building, you will need the services of specialists.
VIDEO
In modern multi-storey construction, there is a popular tendency to rent apartments without renovation, namely with a rough finish. Of course, there are new buildings on the real estate market that have been renovated by the developer.
Sometimes it is quite successful and does not require investment in the first few years until it gets bored. In addition, this is true for monolithic and brick houses, which shrink for several years. As for the technology of volumetric block construction, such houses do not settle, so repair work can be safely carried out in them.
How to start repairs in a new building? This question is asked by many, and it is not surprising, because there is a lot of work in front of you, and you do not know what to start. Let's try to figure it out together, and focus your attention on the main stages of renovation in a new building.
First of all, inspect the apartment for defects and defects in order to understand what scope of work awaits you.Decide what needs to be repaired or replaced first.
We can unequivocally answer that the list of important works includes:
Replacement of the entrance door, windows, ventilation, if necessary.
Wiring and placement of sockets in the apartment in the right amount, and it is better to decide on this right away, because you will need to groove the walls, and then repair the defects.
Connecting water, checking the sewerage system, installing plumbing in the bathroom and toilet, namely bathroom bowls, sinks, bidets, toilets, shower cabins.
If the start of repairs from scratch in a new building coincides with the heating season, using a thermometer, be sure to check the heating level of the radiators.
It is very important to know and remember that at the initial stage of the repair it is necessary to draw up a list of claims of the detected defects and defects to the company, the seller or the developer. It is best if you are compensated for the expenses in the amount of money, rather than redo it on your own.
Do-it-yourself start of repairs in a new building provides for the calculation and order of the stages of the necessary cases. An important factor affecting the speed of work is the financial side. Buying an apartment without renovation, in any case, you are forced to draw up all the necessary documentation for it, and at this moment you begin to pay utility bills.
And, as you know, you have to pay for everything: for garbage disposal, sewerage, heating, electricity, gas, cleaning of the local area. Thus, while not yet living in your apartment, you must spend money on its maintenance. Therefore, the earlier you start repairs in a new building, the more profitable for you.
When it comes to renovating an apartment in a new building, there are two different approaches.
This approach involves the need to think through everything to the smallest detail. It is necessary to draw up a detailed map and stages of finishing work. Here it is important to describe the main types of capital repairs in a new building, as well as the installation of devices. Very often, and this is completely justified, for such work, one team is hired from scratch, which will start and bring the job to the end. The timing of the repair can be different, it all depends on the footage of the apartment, as well as your financial capabilities.
This approach is characterized by the fact that all repair work is performed by a hired team, which will be constantly under your control. Thus, within a period of no more than 1 - 2 weeks, an apartment in a new building will be ready for further work. Along with laying communications in housing, they often prepare a small room in an apartment, where they lay the floor with a floor covering of your choice, decorate the walls, making the room ready for living. Further repair work in a new building with a rough finish can be carried out taking into account the appearance of money for this and free time, respectively.
It is believed that new buildings shrink the base and walls. ... In fact, experts assure that such processes are completed before the building is put into operation, and take about one and a half years.
In case you notice cracks on the ceiling and wall corners, tiles falling off in the bathroom, this indicates that the new house has problems with the stability of the base. In this case, do-it-yourself repairs in a new building should be postponed until the reasons for such phenomena are clarified.
Before proceeding with the renovation of a new apartment, check the front door and the lock on it ... You can choose the model and complete set of the door by prior arrangement. In the contract it is necessary to indicate the desired model of the door and the lock in it. In order to secure your home, it is recommended to replace the lock from the developer immediately.
Next, you need to do the electrical distribution board and connect an electric meter. These actions will make it possible to use electrical tools for repairs. It is recommended to decide in advance on the placement of wiring and sockets in the apartment, so that you do not have to buy carriers and extension cords.To get it right, keep the following points in mind:
In the kitchen and in the bathroom, you need to lay the wiring in sleeves and hoses for tightness.
In order to connect a washing machine and a boiler in the bathroom, you need a separate wire with a cross section of at least 25 A;
A separate wire is also required to install the air conditioner.
In the living room, bathroom, kitchen, you need to run a cable, the function of which will be additional grounding.
When laying the wiring, use only a one-piece copper cable without solders and twists.
An important task for you will also connection of hot and cold water meters , and collection of sewerage in the bathroom. Also, install washbasins and a toilet.
Taking into account the fact that high-quality plumbing a priori cannot be cheap, for a start you can put a budget version of sinks and toilets, plastic sewer pipes. All this can be replaced if desired at any time.
In order to lay water pipes made of plastic, you need to use a puncher and drill holes 2.5 - 3 cm. Then, you need to connect the pipes by soldering them together and connect them to washbasins, bidets and cisterns. Water meters are connected at the final stage of working with sewerage.
At this stage of renovation in a new building, take care of cleaning the apartment from residual fractions of mortar and concrete. Your main task is to clean walls, ceilings, floors, where you need to grind, or cover up holes, cut seams, and so on.
It goes without saying that such work generates a lot of dirt, dust and waste. In this regard, it is necessary to make the ventilation system in the apartment at the highest level and carry out wet cleaning.
An important point in the sequence of repairs in a new building is the preparation of the floor in all rooms for further finishing.
Seal up any chips, cracks, holes and existing seams. The most difficult job is leveling the floors using cement screed and reinforcement mesh. This process is carried out after the preparation of the ceilings and walls has been completed.
After clearing the room from the results of rough work, you need to start preparing the walls and floor for laying tiles. Such facing material is often laid in bathrooms and as a sleeve under a kitchen set.
Also, a good option for wall cladding is decorative plaster, moisture-resistant plaster is used for the bathroom, and one that can be washed is suitable for the kitchen. There are many options for such a cladding in hardware stores. Anyway. The base must first be prepared and leveled.
In other rooms, the walls can be pasted over with wallpaper, there are also a lot of options, for any budget. Liquid wallpaper or plaster for wall decoration is also often used in apartment renovations. This facing looks wonderful.
Check the glass units in the window openings before starting finishing work, adjust or replace them if necessary.
For the floor, choose finishing materials to suit your taste and budget. They can be covered with linoleum, porcelain stoneware tiles, laminate, parquet boards or quartz vinyl tiles. Self-leveling floors with various colors and effects have been invented for the bathroom. They are certainly not cheap, but they look breathtaking.
Installing and connecting lighting devices in rooms, choosing furniture are already pleasant chores. The main finishing works have been completed. Now you can get into the details of the additional decor.
As practice shows, about 70% of major repairs in a new building can be done with your own hands without the involvement of specialists. Laying of parquet boards, stretch ceilings, installation of windows and doors, in most cases, requires the hands of professionals.
Organization of a living room and kitchen in one room.
Entrance to the bathroom or toilet from the living room and kitchen.
Moving the kitchen to the living room.
Placing a bathroom above the kitchen or living room of the neighbors below.
Kitchen equipment for rooms without windows.
Installation of wiring and sewer pipes in floor slabs and wall joints.
Any work to reduce or fill the ventilation channel.
Increasing the load force on the supporting structures.
Transfer of heating radiators and hot water pipes, which are connected to the transfer to the general system of the house, with their removal to loggias and balconies.
Connecting underfloor heating to a common heating system.
VIDEO
Changing the architectural design of the apartment.
Redevelopment with the removal of load-bearing walls, partitions, pillars.
Relocation or merging of bathrooms.
VIDEO
Transferring sanitary and technical equipment to a new place (stove, bathroom bowl, washbasins, toilets).
Arrangement in the bearing structures of doors or closing the opening.
Installation of double-glazed windows on balconies and loggias.
Installation of partitions, provided that the load on the floor slabs does not increase.
Renovation work in the apartment (cosmetics).
Installation of new engineering devices similar to those installed.
Installation and dismantling of built-in wardrobes and mezzanines.
Installation of air conditioners, antenna protection nets on the facade of the house.
Modification of the external facing of balconies and loggias.
Transfer of gas and electric stoves.
Finally, we will mention the stylistic directions in the design of apartments, but the choice is always yours. This is classicism, art deco, high-tech, loft, avant-garde, Scandinavian, Provence, minimalism, country.
Video (click to play).