Do-it-yourself apartment renovation where to start secondary housing
In detail: do-it-yourself apartment renovation where to start secondary housing from a real master for the site my.housecope.com.
Have you finally made a decision to renew the interior of your home? Then the knowledge of what stages of apartment renovation await us and how to observe their sequence will come in handy. So many, at first glance, imperceptible nuances can arise.
If you determine the sequence of actions in advance, the result will only please.
This is a chance to significantly save your budget, since you don't have to redo anything and buy in a hurry, while overpaying.
The duration of the work will be reduced. Self-organization always contributes to a faster completion of the case.
The first mistake of the owner, who decided to start construction work, is the thoughtless purchase of building materials. Often, due to haste, he buys a lot of excess, but what is actually needed, on the contrary, remains on the shelves. After all, even for groceries, it is better to go with a well-thought-out list. Read how to start repairs in our article. It all starts with an estimate. In this case, it is advisable to invite a specialist for consultation, even if only independent work is planned in the future.
Before starting the repair, it is necessary to develop a project and draw up an estimate With a well-defined plan and a competent list of everything you need, you can start.
We draw your attention once again: to avoid mistakes, alterations and downtime during the repair process, be sure to adhere to the ready-made plan.
Step-by-step repair steps
It all starts with total preparation. Such jobs include:
removing old wallpaper;
dismantling of plaster;
destruction of walls and partitions not provided for in the new project;
removal of floors;
dismantling of surfaces intended for replacement.
Repair stages in a new building skip the dismantling stage, proceeding directly to the next step.
Dismantling the interior
First of all, they carry out work on the installation of communications. Before making repairs, you need to do all the operations that can destroy new coatings: installation of windows, doors, wiring and ventilation. Also, pipe wiring can be attributed to this stage. Read more about this in our articles:
Video (click to play).
All old electrical wiring is removed and a new one is installed. The safety instructions for the placement of outlets will help you to position the electrical components correctly and use wires with a sufficient cross-section. For example, you should take care of the presence of thick wiring and grounding at the point to which the washing machine will be connected.
At this stage, you can change the entire layout of the apartment, bringing novelty and additional comfort to the interior.
With the help of partitions (especially if the extra walls are removed), you can create an office, a nursery, divide a bathroom. Most often, bricks or foam blocks are used for such purposes, less often drywall. By covering the new wall with soundproof plaster, you can achieve more comfort. When creating partitions, it is important to take into account the squaring of the premises, sometimes it is better to leave one large room than to make five small ones. In addition, the creation of unnecessary partitions can lead to a violation of the natural ventilation of the apartment. So when erecting additional walls, be sure to consult with professionals. Articles on our site on the topic:
For plastering work, it is recommended to use a ready-made cement-sand mixture (DSP) or gypsum plaster, which will eliminate possible mistakes in self-mixing the proportions of sand and cement. If there is not enough experience in such work, it is still better to hire specialists.Firstly, it saves time, and secondly, you do not have to redo unsuccessful work. More details:
Pouring concrete, equalize the floor. The quality of these works will affect the subsequent placement of furniture in the room. Probably more than once faced with the problem of leveling a table, chest of drawers, armchairs and, more significantly, a washing machine. A good screed will help avoid such difficulties in the future. More: leveling wood and concrete floors.
At least a week should pass between the screed and the installation of drywall for the room to dry out. We install the iron sectional base, leveling the surface of the ceiling. Then we mount the drywall sheets. More detailed articles on this topic:
If you have not encountered such work before, then it is better to invite a specialist. The cost of fixing a marriage is much higher than paying a professional. After all, the tile itself is not cheap, and any possible flaws will be visible from the outside: this is usually the most beautiful and conspicuous part of the interior.
Moreover, the complexity of the work directly depends on the complexity of the pattern on the tile. More details in our articles:
The stages of bathroom renovation are slightly different from those in other rooms:
design;
dismantling;
installation of pipes;
finishing work on the ceiling;
installation of electrical wires;
finishing work on walls and floors;
installation of lamps;
installation of ventilation and heating equipment;
door assembly.
The stages of repairing a bathroom are shown in the video:
So, whether the walls are painted or wallpaper is glued, this is already starting to give the room a complete look. We have come to the finish line! Details in the following articles:
Experts were divided about the sequence of actions at the last stage. Some believe that wallpaper should be glued after laying the floor covering, others - on the contrary. But most still prefer to finish the renovation activities with flooring. Read also:
With the wall covering sorted out, the floor looks as it was intended. The repair is over!
Careful planning of the course of renovation works greatly simplifies the matter and saves the budget. Do not be lazy to calculate everything in advance (preferably, together with a specialist).
It should be noted that the stages of bathroom renovation are slightly different due to the increased complexity. But the right approach to work makes any difficulties insignificant and easily surmountable. We wish you successful installation work!
How to start repairs in a new building from scratch. The sequence of stages of repair in a new apartment.
Wall design with wallpaper. How to correctly combine different types of wallpaper, interior photos. Tips for choosing colors and patterns.
What to look for when buying a screwdriver. Performance instructions and tips for choosing. Battery type and capacity, power.
Most of the happy owners of apartments on the secondary market are concerned about the arrangement of their real estate. Before starting repairs, you need to decide on its scale. Some secondary housing only needs a cosmetic update.
But it happens that a major overhaul of secondary housing is required with the replacement of all communications. If you do all the work yourself, you get a good economy. Before proceeding with the alteration, it is necessary to decide what work will be performed and where to start the repair.
Overhaul
There are usually stages such as:
Coordination of redevelopment of premises.
Replacement of electrical wiring, sockets, additional lighting. Change of water supply and drainage pipes, as well as plumbing fixtures. Renovation of the heating system.
Replacement of window frames, interior and exterior doors.
Performing the necessary additional work before finishing walls, floors, ceilings.
Change of old finishing materials.
Installation of built-in furniture and appliances, if provided.
Redecorating
It can be limited only by changing the finishing materials on the walls, floor and ceiling, relying on a ready-made design project. But before such a replacement, it is necessary to thoroughly prepare the surfaces.
There are three reasons for this.:
To prevent new decorative coatings from falling off along with old putty or plaster.
So that new finishing materials do not deteriorate while working with them.
So that the chosen finish looks right.
So that the work does not end ahead of time, due to the lack of material support, it is necessary to correctly calculate the forthcoming costs. Depending on what you are going to repair, the necessary measurements of the room are made.
Knowing the size of the room, you can make any calculation. Then, in specialized stores, the prices of the building materials of interest are monitored. It is worth making a separate expense column for kitchen repairs if built-in appliances are installed.
Upgrading multiple rooms is best done in stages, starting with the farthest. This will help to avoid excess dirt that is formed from construction debris. Still, such a sequence will help solve the problem associated with the release of the renovated room from furniture.
Where to start renovating the kitchen - with drawing up a design project. He will show you exactly where to place the sockets with switches, where to lead the pipes, at what height it is necessary to lay the apron of the working area. Therefore, it is better to repair the kitchen step by step, relying on the design.
In order for the repairs in the apartment to proceed systematically, it is necessary to follow a certain sequence.
Dismantling work
The beginning of the overhaul begins with dismantling work. Old finishing materials are removed from walls, floors, ceilings. If necessary, openings are changed and unnecessary partitions are demolished. When repairing a one-room apartment, it is better to dismantle it in all rooms at once - in the room, in the kitchen, in the bathroom with a toilet and in the corridor.
This will save money on garbage disposal. If the repair of a two-room apartment is or more, then the dismantling can be done one by one, in the sequence which premises will be repaired.
Surface preparation
After the dismantling, it turned out to be an unfinished apartment. In the empty "box" the power supply system is replaced, all openings are prepared, new additional partitions are erected and the walls are plastered. Water supply and sewerage pipes, heated towel rails and heating radiators are being changed.
You need to carefully consider the water supply and power supply systems when making repairs to the kitchen and bathroom.
Aligning walls and ceilings
As soon as all electrical wires and pipes are hidden in special grooves, the walls are aligned with the ceiling by plastering and puttying. It's worth starting from the ceiling. The evenness of the surfaces is checked by the level.
Ceiling repair
The leveled ceiling can be painted, wallpaper or stretched. It all depends on what kind of design the room has.
The kitchen ceiling or in the bathroom must be made in such a way that large condensation does not form on it. Otherwise, mold will form in the future.
Replacement of windows and doors
When replacing windows, all cracks must be carefully insulated or filled with polyurethane foam. Then the window sill, slopes are installed, and outside - the ebb. During the entire process, it is necessary to monitor the evenness of the installation. This is necessary so that the window does not warp during operation.
It is better not to remove the protective film from the windows until the end of the repair work. Door frames are usually easy to install. The main thing is that everything should be set according to the level.
After completing the work on the ceiling and walls, you can proceed to the floor. When making repairs to a three-room apartment, furniture and things can be transferred to the new floor only then the skirting boards will be installed.
The old coating is removed from the floor, a leveling screed is made. Only after the floor is level over the entire surface can you start laying decorative materials.
Bathroom and toilet renovation
When repairing a bathroom with a toilet, you should pay special attention to the tightness of the installed pipes and water supply to the plumbing.
In such rooms, decorative coatings are chosen that are not afraid of moisture. A new bath, shower, toilet and bidet are being installed. In rare cases, the restoration of the bath enamel is done.
When purchasing materials, it is necessary to make a small stock in order to avoid a shortage of it during repairs.
So that the work does not get up, it is worth preparing all the necessary tools in advance.
Dust will settle much faster if water is sprayed with a spray gun during dismantling or chipping.
Partitions to be demolished should not be classified as load-bearing walls, as their dismantling is strictly prohibited. Especially if it is a panel house.