DIY blind area repair

In detail: do-it-yourself blind area repair from a real master for the site my.housecope.com.

The destruction of the blind area around the building, the appearance of cracks and the germination of vegetation in them under the influence of time is a common occurrence. Especially if the coating was laid in violation of construction technology. If the problem is obvious, then repairing the blind area near the house with your own hands or with the involvement of competent workers must be carried out promptly, since the blind area has an important role to play - protecting the foundation from the penetration of precipitation and the formation of damage during severe frosts.

A blind area is a covering around a building with an average width of 80 to 150 cm, which protects the foundation from moisture and freezing... It is equipped with a certain slope to ensure the drainage of rainwater from the house. According to construction standards, the slope should be 5-10 cm for each meter of the blind area, while the edge adjacent to the wall of the house should rise, and the opposite should be level with the ground.

The lathing for pouring concrete during the repair of the blind area begins to be made from the lowest place, that is, from the point where the water is drained.

Then they move to the opposite side of the house, constantly monitoring the level of the slope.

The materials used to equip the protective structure with your own hands are:

  • concrete;
  • cement;
  • artificial and natural stone;
  • paving stones;
  • asphalt;
  • tile.

To repair the coating around the house with your own hands you will need:

  • shovel;
  • bucket;
  • wheelbarrow;
  • puncher;
  • materials for heat and moisture insulation;
  • building level;
  • sand;
  • crushed stone;
  • fittings.

Step 1. Preparation for pouring the solution.

Before carrying out the main work, the surface of the old coating should be cleaned from dust and dirt. Expand cracks and remove completely destroyed areas. Prime the edges of cracks to improve adhesion. To close the gaps that have formed, to save cement mortar, you can use pieces of the old destroyed blind area. To do this, they are laid out there before pouring.

Video (click to play).

Image - DIY blind area repair

The stage of preparing the blind area for pouring the solution

Step 2. Preparation of the solution.

For this, the following ingredients are used: sand - 2.6 parts, cement M500 or M400 - 1 part, crushed stone - 4.5 parts, water - 125 liters per 1 cubic meter. ready-made solution, as well as other additives. The shelf life of the finished mixture is about 2 hours.

Image - DIY blind area repair

Preparation of a solution for repairing the blind area

It is better to start pouring concrete from the highest point, periodically monitoring compliance with the planned slope. Repair of large areas of damaged blind area should be carried out using a reinforcing mesh.

Image - DIY blind area repair

The third step is pouring concrete.

After pouring, the concrete is compacted and leveled.

After completion of the work, the surface is covered with a damp cloth and left to dry gradually, occasionally sprinkling with water, so that the concrete does not dry out too quickly and does not crack.

After complete drying of the concrete, the formwork is removed.

  1. Lack of a waterproofing layer. This is an important structural element that separates all other layers from the ground and prevents the penetration of moisture from the outside.
  2. Poorly compacted, uneven backfill. Insufficient thickness of the top layer.
  3. Construction work under unfavorable climatic conditions. According to the technology, it is impossible to carry out such work on the eve of frost, in the heat, before the onset of rains. All these factors will have an extremely negative effect on the quality of the coating, disrupt the process of solidification and germination of cement crystals.
  4. Lack of expansion joints. Multiple changes in temperature throughout the year lead to expansion, contraction, frost heaving of the soil, which increases the likelihood of destruction of the concrete structure. To prevent this from happening, expansion joints should be placed in it, which can partially compensate for these phenomena. Usually they are placed every 1.5-2 meters in order to distribute the emerging vibrations, but less is possible.

The strength and durability of the foundation, as well as the absence of unplanned waste of time and money for repairs, depends on the quality of the concrete structure, made in compliance with the technology. It is easier to do everything once with your own hands in accordance with the established norms than to deal with the consequences of incorrect laying of the coating all the time.

The appearance of cracks, cracks, vegetation germination, swelling are common problems for the old blind area. There are many reasons for the violation of the integrity of the concrete surface or paving slabs - this is non-compliance with laying technologies, the negative impact of moisture, atmospheric precipitation. The cracked blind area does not fulfill its functions and in order to protect the foundation, work should be done to repair the coating.

Pervaya Dacha Company offers a major overhaul of old blind areas or the elimination of small cracks both in Moscow and throughout the Moscow region.

The company's specialists know how to repair the blind area in a short time. Contact us on the specified data right now, and we will eliminate even the most difficult problems.

Before you repair the blind area around the house, you should understand the features of its design.

A blind area is called a tape of concrete, asphalt or paving stones 0.8-1.5 m wide, framing the house around the entire perimeter and serving to protect the foundation from the negative effects of moisture, frost and other climatic troubles.

The role of the blind area is extremely important: a protective belt, erected over the foundation, minimizes the risk of cracks, flooding and subsidence of the building, and increases the operational life of the foundation.

Any blind area consists of two layers:

  1. Subbase that provides a solid base for the top layer and consists of sand, fine gravel or crushed stone.
  2. Covering, preventing the penetration of moisture to the foundation. The pavement is erected from a concrete mixture, asphalt or paving slabs.

Even the most durable blind area is not immune from cracks and subsidence. Faced with such a problem, contact the specialists of the "First Dacha Company", who will accurately determine the cause of the destruction and will professionally restore the concrete or slab structure.

Often, the blind area, erected over the foundation, undergoes deformation, which can lead to a violation of the integrity of the walls. There are several known reasons for the appearance of cracks and cracks in the blind area, for example:

  1. Time factor: the old coating was often exposed to atmospheric precipitation, temperature changes, as a result of which the blind area begins to crumble, small cracks form in it, which expand more and more over time.
  2. Uneven foundation settlement: the appearance of gaps in the old foundation protection is due to a violation of the tightness between the blind area and the basement surface. The belt is detached from the house, and water penetrates into the formed cracks. In order to avoid the destruction of the foundation, it is necessary to urgently repair cracks and cracks.
  3. Shrinkage of the protective belt due to soil subsidence.

The most common problem with the blind area should be highlighted as a separate point - we are talking about a violation of the technology of laying the protective contour. Routine repair of the blind area is often required due to improper installation of the strip above the foundation. In an effort to save on building materials and reduce labor costs, home owners run the risk of getting a low-quality result.

There is nothing surprising in the fact that after a few years, deformation changes occur with such blind areas and the structure requires urgent repair work.

There are many mistakes made when laying the belt. We focus on the most typical cases:

  • the blind area has subsided: the reason lies in the absence of a leveling layer or its insufficient thickness;
  • cracks appear in the blind area: the problem is the absence of a sand and gravel layer or the absence of gutters;
  • the blind area is crumbling: the path width may have been set to the wrong width, and it is cracking under the influence of water flowing from the roof of the building.

Remember the time! It is not recommended to install the belt on the eve of cold weather, in conditions of intense heat or heavy rains. These processes disrupt the process of hardening and germination of cement crystals, which means that the coating will be fragile and soon it will be necessary to repair the concrete blind area.

Cracks and cracks: how to repair the blind area around the house?

What if the blind area is cracked? Carry out repair work immediately - on your own or by contacting the First Cottage Company. However, do not forget that saving on the services of specialists is not always profitable, because if you violate the technology for protecting the foundation, you may face new problems in a year.

To repair a concrete strip (for 1 sq. M) you will need:

  1. Concrete mix - 32 kg of M 500 cement, 0.08 cubic meters of crushed stone, 0.05 cubic meters sand.
  2. Pillow - 1 sq. m. geotextile, PVC films, 0.05-0.1 cubic meters. sand, 0.1 cubic meters rubble.
  3. Reinforcement - 12 lm fittings with a diameter of 0.6 cm, 1 sq.m. reinforcing mesh 50x50 with a diameter of 0.3 cm, 1 sq.m. nets 150x150 with a diameter of 0.3 cm.

For repair work with a tiled blind area, you will need (taking into account the consumption per 1 sq. M.):

  1. Pillow - 0.05-0.1 cubic meters of clay, 0.15-0.2 cubic meters of sand, 0.1 cubic meters of crushed stone with a diameter of 0.3-1 cm, as well as PVC film, geotextiles.
  2. Finishing layer - 10 kg of cement M 500, 3-10 kg of sifted sand.
  3. The front layer is a tile, a border.

The managers of the First Dacha Company will help you not to make a mistake in the calculations. After ordering the current work with a blind area, our specialist will arrive at the facility, calculate the amount of material required to seal the cracks and display all costs in the estimate.

When it comes to the foundation, do not postpone the work with the blind area. Noticing that the protective strip is cracking or that the blind area has subsided, immediately purchase building materials and start restoring the old structure. There is another option: contact "Pervaya Dacha" - a company that will help fill up all the cracks and cracks in a short time.

Repair of the blind area is divided into major and current. What is the difference between the two types of repairs and how to organize work with the foundation and blind area?

If in some places the blind area is cracked and cracks with a small thickness appear on it, minor current repairs will help out.

The repair technology in the case when the blind area has burst or cracked, involves the following actions:

Step # 1. Cleaning the surface in the area of ​​a gap or chip.

Step # 2. Treatment of each crack with several layers of deep penetrating primer mortar.

Step # 3. Sealing defects with a cement-sand mixture in a ratio of 1: 2 using a spatula. After the filling is dry, we rub the surface with dry cement.

Step # 4. Elimination of peeling by cleaning the surface and filling the areas with a composition containing:

  • 75% mastic;
  • 15% asbestos;
  • 10% crushed slag.

At the final stage, sprinkle a layer of sand over the strip.

Repair work with a blind area sometimes requires major intervention. The decision to restore the protective belt for the foundation is made only after a detailed analysis and determination of the technical condition of the structure.

Dismantling and major restoration are carried out exclusively in the event of complete destruction of the old blind area. The range of services includes work on:

  • renovation of slabs, installation of a new concrete base;
  • replacement / restoration of drainage;
  • renovation of foundation waterproofing;
  • repair of the reinforcing layer;
  • dismantling the blind area or partial replacement of its elements.

Often, overhaul is impractical, because the higher the degree of damage to the tape, the more expensive it is to work with the blind area. If the strip sagged, separated from the base, cracked in several places, it is cheaper and easier to mount a new belt for the foundation.

The specialists of the First Dacha Company will tell you which type of repair will be more profitable in each specific case - current or capital. If the blind area is cracking, call us immediately: we know what to do even in the most difficult situations.

Some problems with the blind area can be solved on your own without resorting to the help of professionals. The recommendations of specialists for independent work with revenge relate to the following issues:

  • the formation of gaps between the blind area and the foundation: we eliminate delamination with a sealant or waterproofing filler;
  • the appearance of cracks with a large thickness: we clean the gap and fill it with concrete, after a few days we treat the surface with a primer;
  • complete destruction of the strip: we demonstrate the destroyed part and rebuild the blind area.

Still have questions? Contact the representatives of the "Pervaya dacha company" who understand all the intricacies of protection of the foundation. We will provide free consultations on cooperation and will send an expert to the site as soon as possible!

You can familiarize yourself with all types of blind area here.

The blind area around the house is an integral part of the building, protecting the foundation from rainwater entering it. It is a waterproof coating located around the perimeter of the entire building.

After some time, the protective strip can be destroyed. This can be due to a number of factors:

Such phenomena as partial shedding, cracking, delamination indicate the need for current repairs of the protective coating of the house.

Consider the reasons associated with the destruction of the blind area and the specifics of the repair of the protective tape.

There are several types of blind area:

Its restoration depends on the materials used in its manufacture.

Repairing a cobblestone defensive line involves replacing damaged areas. This will require a chisel and hammer. With these tools, deformed boulders are removed from the structure. On the empty space, it is necessary to pour a mixture of sand and gravel or crushed rubble to level the layer, then tamp everything well, fill it with cement mortar and put in a suitable cobblestone. If there are small cracks, it will be enough to seal them with concrete.

A protective strip made of concrete is used most often due to its affordability in price, as well as positive performance.

Image - DIY blind area repair

Repair of a concrete blind area is divided into two types:

  1. Covering up small single discontinuities.
  2. Replacing large destroyed areas when the house subsides.

To prevent further deformation of the coating and the ingress of water into the foundation of the house, repairs must be carried out immediately after the detection of defects.

To eliminate destruction, you can use a mixture of concrete and construction glue, special polymer materials, moisture-resistant foam... Penetrating into the formed cracks, such mixtures quickly harden. It is necessary to pay attention to the fact that cement is not suitable for these purposes, because it does not cover the entire depth of the crack, but only its upper part.

When restoring the asphalt belt, all areas to be repaired must be dismantled to its full depth. The resulting pit is cleaned and the bottom and edges are treated with liquid resin. After that, a new layer of asphalt is covered and compacted with a roller, while the new layer must be higher than the old one.

The rolling of the new coating must be done from the edges towards the center.The result is a stronger grip.

Restoring a blind area from a tile involves replacing a defective part of it. Before replacing a new one, rubble or sand is added to the recess, after which a new tile is laid.

If it is necessary to replace a large part of the tape, you can use a mixture of sand and cement in a dry form using gunning (the solution is applied with a cement gun under compressed air pressure). After gunning, the surface must be moistened for 14 days.

Image - DIY blind area repair

The desire to reduce costs when choosing a structure, building materials and technology leads to the fact that soon after the construction of the protective tape it has to be repaired. And the upcoming repairs will require a lot of money.

Consider the most common mistakes made in strip manufacturing:

  1. The lack of a leveling layer will lead to a rapid settling of the protection. To prevent this from happening, it is necessary to make a good abutment of the tape to the foundation.
  2. A thin leveling layer and poor tamping will result in sagging and cracking.
  3. The absence of longitudinal and transverse expansion (temperature) joints between the strip and the foundation - with temperature drops and soil movements, the structure will not be able to contract and expand. As a result, recovery may be required after the first winter. The expander can be a roofing material folded in two layers, located between the foundation and concrete.
  4. Absence of a sand and gravel layer - when placing concrete directly on the ground, heaving of the soil will lead to deformation of the protective strip.
  5. When the thickness of the tape decreases towards the edge, its destruction occurs under the action of streams of water flowing down from the roof of the building.
  6. Absence of gutters - the surface of the blind area crumbles from the flowing water.
  7. Not reinforcing the concrete strip - in this case, the service life of the structure is reduced.
  8. Using a mixture of sand and clay when laying the blind area - under the influence of frozen clay, parts of the concrete can flake off.
  9. Pouring concrete without dividing into segments will lead to the rapid destruction of the entire belt.

Image - DIY blind area repair

The decision on the need to repair the protective strip is made after a detailed study and establishment of the technical condition of the strip and foundation.

Major restoration is carried out in the event of almost complete destruction of the blind area.

This type of restoration includes:

  • renewal of slabs;
  • replacement or restoration of the drainage system;
  • repair of the reinforcing frame;
  • renovation of waterproofing;
  • moss and lichen removal;
  • dismantling the old tape or replacing new parts.

Small cracks existing in one area are combined into one zone, embroidered and then crushed stone is poured into the resulting depression and poured with polymer concrete.

During major repairs, a layer of concrete is poured above the level of the previous protective strip - this ensures better adhesion of the new to the old one.

To repair the blind area, you need to use high-quality materials and be clearly guided by construction technology.

Consider the list and quantity of materials required to perform work to eliminate defects in the protective strip.

To repair a concrete blind area (width 1 meter, thickness 10 centimeters) you will need:

For the preparation of concrete (1 m2):

  • cement M 500 - 32 kg;
  • screenings or crushed stone (5-10 mm) - 0.08 m3;
  • sand - 0.05 m3;

For the pillow:

  • geotextile, PVC film - 1m2;
  • sand - 0.05-0.1 m3;
  • screenings or crushed stone (3-10 mm) - 0.1 m3;