Following the instructions, you will reach the final stage. At the end, install the sink, hang a mirror and lamp, install furniture. The end result is a beautiful room.
People face difficulties when renovating the toilet room.The toilet is an important part of housing, which I advise you to repair thoroughly and correctly, taking into account all the little things. Where to start the painstaking process, I will tell below.
VIDEO
After going through a difficult path, in the end you will get a result that will delight you with freshness and originality. But more pleasure will bring the thought that the author of the masterpiece is yourself.
The combined bathroom has advantages and disadvantages. The main disadvantage is that the room is available only to one household. Plus - the ability to expand the area of \u200b\u200bthe bathroom. A washing machine or a closet for accessories can be easily placed in the combined bathroom.
In modern apartments, the toilet is separate from the bathroom. At the same time, the premises are characterized by a small area and there are often cases when a few centimeters are not enough to install furniture or another object. To fully consider the issue, consider how to combine a bathroom and a toilet.
This type of repair, in addition to construction work, provides for "paperwork". According to the rules, redevelopment in the apartment is coordinated with the relevant authorities. At the same time, changes are made to the housing plan.
When creating a preliminary plan, note the relocation of plumbing, changes in electrical wiring and plumbing systems. This is an incomplete list of factors that should not be ignored. Work on combining a bathroom is a small technical part of a huge job.
After approving the plan, switch to repairs. It is better if the household members go on a summer vacation for a while. As a result, they will protect themselves from discomfort, and no one will interfere with you.
Demolish the partition between the bathroom and the toilet, level the walls, which are usually extremely crooked.
Redo the pipes. If necessary, change their location so that they do not interfere. The same goes for the heated towel rail.
The next step involves laying electrical wiring. Route cables, locate switches and outlets, and install.
Coat the walls with a primer and level the floor with a concrete screed. Before laying the floor covering, whether it is a tile or other finishing material, fill the floor with bitumen. This will reduce the likelihood of flooding neighbors during a leak.
Stretch ceilings are a good option for a combined node. Just entrust their installation to professionals, as the arrangement of the ceiling involves the use of special equipment and skills.
Finish the walls and lay the flooring. To visually expand the space of the room, build a large mirror into each wall. The combined bathroom will turn out beautiful and original.
The final stage of the repair involves the installation of plumbing, furniture placement, connection of household appliances, installation of bath accessories - hanging soap dishes, hooks.
If you want to achieve results, listen to the recommendations. They will help to speed up and successfully complete the repair. When the family returns home, the beauty of the combined bathroom will surprise.
I devote the final part of the article to the layout of the bathroom and the intricacies of choosing furniture. If you have finances, organize a separate bathroom in the house, especially if the family is large. As a result, several people will be able to relieve their needs at the same time. If you like a combined bathroom, make sure that it has a sliding partition. With its help, divide the room into zones.
Room size. To make the toilet convenient and comfortable, allocate a few square meters for the arrangement. Excess space is not required. Design a bathroom according to tastes and preferences, but you should not overdo it with space - 6-10 squares are enough.
Furniture . Before buying furniture, decide what you want to see in the room. Usually this is a set of a sink, a mirror, a pencil case and a floor cabinet. Sometimes a hanging cabinet is provided. Before buying a bath set, make sure the quality. On the surface of the furniture, the paint should lie in an even layer.
Accessories. From accessories, choose models equipped with chrome-plated legs, handles and metal hinges. They also make accessories from plastic, covering with a layer of chromium. You should not buy such furniture, because chrome-plated or gold-plated plastic handles will quickly lose their original appearance.
Sink . Be sure to inspect the sink for chips and damage. Check the integrity of the product by light tapping. Buy a sink that makes a pleasant ringing. A dull sound is a sign of defects.
Bedside tables and wardrobes. When choosing bedside tables and lockers, be guided by the size of the room, the number of residents and tastes. If there is more than enough space, buy a large set that will fit a hair dryer, curling iron, shampoos and other things. If there is a problem with the area, pay attention to a set of cabinets and several hanging drawers.
Shelves and niches. It is useful to equip the bathroom with niches and shelves of open or closed type. They will help with the storage of bath utensils. Be sure to provide a place for clothes and bath towels. A hanger or a set of hooks will help solve the issue.
I hope that the day of knowledge was not in vain, and you learned a lot of useful information.
Good day, gentlemen and ladies! I want to tell my story about the renovation of the bathroom and toilet, separate. From the purchase of the apartment, the renovation of the bathroom was postponed for 3 years, since other rooms were a priority. The right hour has come, we were just on vacation with the whole family in another city, I spontaneously decided to come home a month earlier before the end of the vacation to start work. This was at the beginning of 2016. Therefore, all materials were purchased in the city of Mirny, if they had planned in advance, they could have been ordered from the mainland and would have received significant savings. The budget turned out to be around 150 thousand (approximately + -30 thousand more), purely based on materials. The main amount is collected from the bath, tiles, plumbing. I basically did all the work myself, if others did it, then you can safely add another 150-200 thousand for the work (probably) to the amount of materials. In our city, all prices are very high, it's a fact.
We have a house built in 1996, the square is small, the bathroom, toilet, balcony are very tiny. But the prices of apartments are the same as in Yakutsk, and the squares are less.
Probably I will post in the form of a photo report with notes. There were a lot of photos.
There were old Soviet square tiles on the floor, which were glued either with concrete or with super glue; Neighbors sorry again. Wallpaper was pasted on the walls, which were painted.
A good semi-professional assistant in the repair and cleaning of carpets.
Stocked up with tiles. Honestly, I don’t remember how much they cost. Wall tiles cost 110 rubles / tile. Russian production. Quality for 3 with a minus. Even in the same box, the dimensions are different in length and width, so when you glue it, the level starts to play. And if you ordered from the mainland in advance, then for this money you could order branded imported tiles, they don’t have such a jamb, they say.
A simple toilet bowl, for 7 thousand Karl. Big mistake.
The bathroom is acrylic, I like it, it's voluminous. Length 150 cm.
The old tub was metal. cooled down quickly.
We are in full swing preparing the base of the floor. Applying a deep penetration primer. Then a concrete screed.
Neighbor Aunt Lyuba made squats from time to time, Soft delicious buns!
Work to replace old metal pipes. I called the plumbers of the housing and communal services, they turned off the water, made 2 transitions from the hot water and cold water risers to plastic, and also installed 2 counters, 1 heated towel rail. Emptying my wallet by 10,000.
This photo shows how old metal pipes are clogged.
For a complete replacement of pipes, they asked for another 15 thousand rubles. That's without wall shredding. And my wife had an interesting idea. After watching a YouTube video on the installation of polypropylene pipes, I decided to do it myself. I bought a welding machine for 2 thousand rubles.In principle, nothing complicated. The main thing is not to overexpose the pipes in the welding machine.
Didn't like the paint on the wall. To remove paint, I made this design from a 5 liter bottle with a connection to a vacuum cleaner. The result is not particularly pleased, because. very long, dusty and noisy. I’ll tell you in advance, it’s easier how to do it: we clean the paint that comes off by itself, then we go through the paint again with a scraper or chisel, then we buy a solution - concrete contact, apply it and that’s it. The surface becomes flaky, like rough sandpaper. The tile adhesive adheres to it.
Here are the marks from the grinder on the wall.
Since the floors are very uneven, the slope is 3-5 cm per 1 meter, it is necessary to make an even level using the so-called beacons (green dots on the floor). Then between the beacons we throw a solution of concrete and connect the beacons. We will fill in the inner squares along these lines.
As a result, we get a flat floor. There will be a bathtub on the right, so I decided to save concrete there, we can equalize the level with the help of legs.
Next, a layer of waterproofing is applied. For every fireman. Before each layer of concrete or waterproofing, we apply a primer for better adhesion.
We glue the tiles, between the tiles we make a distance of 2 mm, using crosses. In the future, the inter-tile space is filled with a special grout.
Bath installation. Behind the bathroom, he ditched the wall and put a pipe from the mixer there. When you switch the mixer mode to a shower, the water will go from above. This is the wife's idea.
On the left is a strobe for electrical wiring, they connected a washing machine and made sockets. Right for the shower. Red is the concrete contact layer.
2 faucets)) The bathroom fills up 2 times faster))
On the wall we begin to glue the tiles from the level of the bath. First we go through 1 horizontal line, then 2 rows of tiles. How to glue tiles can be viewed on the Internet, I watched YouTube)). There you can find the entire technological process of repair.
By the way, our walls are very crooked, sometimes with a propeller, sometimes with a slope. nightmare. And no one knew how to level the walls and would not have had time in time. The most difficult sections were the corners. More glue, time and nerves. Now the walls are not curved at all.
My mistake. Glued the mirror to the tile adhesive. The mirror is old from the previous owners.
Here you can see it very well. From above, the corner goes back to back, and from below it begins to diverge. The issue was solved by grouting and more glue)).
The ceiling is already done. Lighting - 5 point diode lamps, enough for the eyes. A shower was installed, it works well (China), I bought it in Yakutsk, I don’t remember in which store.
Drying glue ruined the reflective layer.
Dismantling with your favorite perforator.
I bought an ordinary countertop, in our city there is nothing but ordinary things. Or they will make it to order “like a cool one” at three prices.
Found a nightstand just the right size.
Not a single centimeter between the wash cabinet and the bathroom. Back to back. My perfectionism kicks in. The tabletop was installed on the corners in the wall and on the nightstand. Holds tight. At least jump.
Voila. The joint was smeared with white sealant.
Here is the end result.
The upper plinth needs to be redone, trash. The shower is good.
Toilet. The foundation has been prepared.
Concrete screed. It is done in the bathroom.
Waterproofing. Don't forget the primer.
And we begin to glue the floor tiles.
There are many pipes, meters, etc. To hide all this wealth, we make a frame structure from profiles with drywall.
Concrete contact is also applied to the drywall, then the tiles are glued. The ceiling is the same as in the bathroom, here 2-point. By the way, both the bathroom and the toilet are equipped with ventilation systems (fans). A very necessary thing.
Behind the toilet they made a hidden shelf.
That's all. In time, spent a year. 1 month did the main thing. Then a little bit, then the doors were changed, then they made a shelf in the toilet.
In Yakutsk, you can do everything even cheaper, and in a more original way, there are more choices in stores and prices are lower than ours. So keep it up. Post made so that others are not afraid to make repairs, everyone can also, even better . The main desire.
Step-by-step instructions for repairing a bathroom and toilet.
To start repairs in the apartment, according to most finishers, you should definitely start from the bathroom. I will explain why: this is the dirtiest and dustiest part of the repair, requiring not only the dismantling of old tiles, plumbing, doors, and sometimes the entire walls of the bathroom.
So the first thing we do is we take out the old plumbing: a bathtub, a sink, a toilet bowl ... In short, everything that costs, weighs, lies .
• Next stage: we cut off with the help of a grinder all the old pipes to the tap located on the riser .
• Using a perforator, knock down the old tile .
It is important if the plaster under the tile moves away from the wall, bunit ... it must also be beaten off.
• We dismantle the old door along with the box .
• We change the risers . Now we turn our attention to the water and sewer risers. This is a very important part of the repair and it is necessary to change them. After the renovation it will be very problematic. If you are not a specialist in plumbing work, then to replace the risers, it is better to invite qualified craftsmen, but you can do the internal plumbing yourself.
• Checking the hood . Let's move on to the extraction. If we do not want the bathroom to be stuffy, we need to check the operation of the hood. To do this, we bring a burning candle to the hood and evaluate its work by the tongue of the flame: the better the hood works, the more intense the flame is sucked into the chimney pipe. If the hood does not work correctly, we either clean it or install a fan in it.
• We prime the walls . At the next stage, I suggest a good clean up: take a broom and sweep out all the debris and dust from the bathroom. After all the dust has settled, we take a deep penetration primer and prime the walls.
• Installing beacons . After the primer has completely dried, we install beacons for further plastering of the bathroom. Lighthouses must be installed strictly according to the level, observing the plane of the wall and maintaining 90-degree angles.
• Plastering the walls . Beacons installed? Let's get to the plaster. To do this, we need a rule, a spatula, a drill and a mixer nozzle for a drill. Bathrooms are plastered, as a rule, with dry gypsum mixtures, since there is no shortage of them on the market. I usually use Rotband plaster. We take a bucket of 12 liters and prepare a solution in it as written in the instructions. Using a spatula, we throw a solution between the beacons of one wall 50 centimeters from the floor. Then we take the rule, press it to the lighthouses and pull it up - we get a flat surface. We remove the excess from the rule. And so on all the walls - from the floor to the ceiling. There are not large pits left, it does not matter - then we level it with a spatula. If everything is smooth and beautiful, then you have coped with the task.
• Leveling the floors . The next step is the floors. We level them with the help of "self-leveling floors". We dilute the mixture as stated in the instructions, it can even be a little thinner, and spread it all over the floor with a spiked roller. After drying, the walls and floors, just in case, we check by level, we eliminate unevenness.
• We make a detailed plan of the bathroom . At the next stage, we must decide on the design of the bathroom, where? as? and at what height? there will be a bath, a sink, a mirror, a washing machine (if any), a towel dryer, a toilet bowl, a box covering the risers. To do this, we take a tape measure and measure our bathroom - after plastering, the dimensions have changed. Then we take a pencil and a sheet of paper, and sketch everything. Let's call it a bathroom plan. In order for the plan to be accurate, at this stage, we need to buy all the bathroom objects. It is important to remember: if the bathtub is tied to the size (I mean that your bathtub is not half a football field, but for example 1m.70cm by 1m.50cm), then you need to buy a bathtub as long as possible. And if your size is 1m.68cm. - you need to buy a bath for 1m.70cm. Then 2cm. let's go through. This seems to have been sorted out.
VIDEO
Video - turnkey bath repair
• We make (draw) a detailed marking of the water supply and sewerage . If everything is purchased, then we continue. We collect a bath in a free room. We put it on its legs and level it. As a rule, for most bathtubs, the height of the legs is adjustable - we adjust the height for ourselves. We measure the height and width of the bath. We transfer the dimensions to the wall in the bathroom. All the same - we do the same with the sink and washing machine. The next thing we do is mark on the walls how we will have water supply and sewerage. The bathroom faucet is usually installed in the center 10 cm above the bath - this should also be sketched on the walls. The distance between the pipes leading to the bathroom faucet should be 15cm. We mark the plumbing for the sink, based on the structural features of the bedside table, and the length of the flexible hoses of the mixer. We mark only one pipe under the washing machine - cold. We sketch the sewer pipes at an angle towards the riser (so that there is a drain). If a small slope can be made under the bath and sink, then under the washing machine the output should be at a distance of 50 cm. from the floor.
• Making (drawing) a detailed layout of electrical wiring . The next thing we do is determine the electrical wiring. How many sockets will we have, and where - if there is a washing machine, then next to it. Use an electric razor - next to the mirror. If you have an illuminated mirror, you will need to bring a wire under it (decide at what height). There will be a fan - we bring it out under it.
• We make strobes . When we have completely decided and sketched, we take a perforator and gouge according to the plan. Next, we clean up and primer the strobes.
• We install plumbing and sewerage . At the next stage, we mount the water supply (comb) and sewerage. Don't forget to install water meters and filters as well. Since our water supply is retracted into the walls, it is better to use pipes made of polypropylene or metal-plastic pipes.
• We mount a heated towel rail . At the next stage, we invite craftsmen or install a heated towel rail ourselves. Pipes are also mounted in the wall.
VIDEO
• We mount the box . So we still have not closed risers, and we fix it. We assemble a box from a metal profile and sew it up with drywall. Drywall must be moisture resistant - it is green. Also, do not forget about the technical hatch, you will need it to have access to the taps and the meter. Then we install a perforated corner on the corner of our box and plaster the entire box.
• Priming the walls and floor . As a result, what we see is a completely plastered bathroom, without visible pipes and wires. Once again, we look at everything in detail for the presence of irregularities. If there are any, we fix it with a spatula and sandpaper.
• Laying out the floor . Now lay out the floor tiles. For this we need - a drill, a mixer, a bucket, an ordinary spatula, a notched trowel, a professional tile cutter, crosses (1.5-2mm.).
We lay out the tiles so that all the cut edges are under the bathtub and sink. So in sight we will have only a whole tile. Do not forget to use the level and insert crosses.
• We lay out 1 row of wall tiles under the bathroom from the floor . Then you will need to lay 1 row of wall tiles under the bathroom - for waterproofing. If you use a small tile, then 30 centimeters from the floor will be enough.
• We wipe the tiles under the bathroom (wall, floor) .
• Installing a bath . It's bath time. We bring the bath, set it strictly according to the level and length and width. Let's break the bath.
• Laying wall tiles . Laying out wall tiles. We start right from the bath, from the most prominent corner, and drive in a circle. From the sides of the bath, you need to drill the slats so that all the tiles go on the level. Finish the top, remove the slats and report the bottom. Let the tile dry and remove the crosses.
• We overwrite the seams .
• We mount the ceiling . Now we need to decide what we will do with the ceiling. There are several options: putty and paint, suspended from plastic panels, tension. They are all good in their own way, you choose.
• We install the door. It's time to install the missing plumbing - sink, washing machine, toilet, faucets, bath screen.
It remains to hang a mirror, put sockets and the bath is ready.
This order of work will prevent you from making the most common mistakes, where the quality of the work done suffers, and sometimes leads to redoing.
Carrying out repairs in the apartment, it will certainly come to the bathroom with a toilet. If you have certain experience, skills and decide to do your own bathroom renovation, answer a few questions first:
what do you want to get in the final result from the repair of the bathroom and toilet;
how much you expect to spend on repairs;
What kind of repair is needed: cosmetic or major.
The bathroom room, perhaps, is the leader among all the others in terms of the number of visits per day, therefore, its arrangement must be approached responsibly and take into account such characteristic nuances as high humidity, steam formation and temperature changes.
The process of repair work will begin with the dismantling of old and installation of new water pipes. Do not do this type of work yourself, unless of course you are a professional plumber. Otherwise, you will face a flood and a lot of trouble. If you decide to do this yourself, buy plastic water and sewer pipes.
For sewer pipes, the connection is made with rubber gaskets, and for plumbing - with a soldering iron. After installation is complete, check the connections for leaks.
The location of communications must be carefully planned in advance so that in the future it does not slow down the progress of work.
Since the bathroom is a very humid room, the surface finishing material must also be moisture resistant and not be afraid of a sudden change in temperature. You need to rid the walls and ceiling of the previous
If there is a large area, you can sheathe the walls with moisture-resistant drywall. Next, the surfaces are covered with a primer, which will also serve as protection against fungal diseases. After the final drying, you can proceed to further work. For finishing, you can choose moisture-resistant wallpaper, paint materials or ceramic tiles.
If you have a combined bathroom, you can choose materials for finishing in two colors, thereby visually dividing the space.
The most important condition is compliance with your wishes, taste preferences and, of course, the presence of harmony is important. To lay the tiles, stock up on glue, the tile itself, a level and a spatula for applying the mortar. Glue the underside of the tile with glue and press it firmly to the surface. Do the same with the rest. Laying should begin in the direction from the floor to the ceiling.
If necessary, the material can be cut with a special tool. Facing the walls, consider the location of the heated towel rail, which is also subject to replacement. Choose the battery that you like the most, since the assortment in the store is simply huge.
With independent repairs, only you are responsible for the selection of material and design for the room. In the ceiling section, give preference to moisture-resistant drywall or plastic panels. These materials are quite simple to install and operate. And their fastening is carried out on a metal frame.
When installing, provide holes for mounting lighting fixtures. Do not be afraid to experiment with the color of the ceiling, making it match the wall decoration.
In the apartments of the old layout, the bathroom has a very small area, which needs to be maximized at least visually. This can be achieved with the help of color schemes and small tricks: use mirrors, they perfectly increase the space visually.
Opt for underfloor heating, which is installed with a special electrically heated floor, or with hot water pipes (so-called water floor).
For flooring, you can use laminate, ceramic tiles, parquet or linoleum.
The main selection criteria are moisture resistance, resistance to temperature changes and the absence of a slippery surface.
Following all the above recommendations, you can carry out an independent repair of the bathroom. However, get ready for the fact that you will spend a lot of time, however, the result will fully justify your costs.
Learn how not to do bathroom renovation:
VIDEO
Helpful repair tips:
VIDEO
The restroom seems to be the smallest room in the house, and the trouble is the most. A lot of time is spent on the installation of plumbing. And I already regret that we did not make a bathroom in retro style. Here in the photo she looks very personal. I have everything done in the style of romanticism. And by the way, we placed the washing machine in the kitchen. Now few people install it in the bathroom.
When you move into a new apartment, it is quite natural to want to make it the home of your dreams and change everything there. Actually, it was the same for me - I moved to a odnushka, which probably saw repairs back in Brezhnev's times. So, at the entrance we have an apartment with a separate bathroom and toilet, but very small.
These are such tiny spaces that are called "do not turn around." Therefore, we decided to combine a bath with a toilet. We have two advantages at once:
the bathroom becomes more spacious
instead of two doors in the corridor there will be one, which means additional space in the corridor, which is also small.
This is what we have in the bathroom: small tiles on the floor, tiles, metal-plastic pipes, a partition between the bathroom and the toilet - brickwork. We cleaned the walls to the maximum from tiles and a layer of paint. The sink was removed, it needs to be replaced, but the bathtub was left, it is cast iron and in good condition.
The ceilings in the apartment are at different levels, a niche is hidden under the plywood, although it was quite possible to make a locker. However, now it is irrelevant, we will change the location of the door.
Such a mosaic tile adorned the walls of the toilet, you will not find such a one now.
Branch risers from the toilet to the bath. The pipes, as we see, in this old house have been replaced with new ones.
A red brick partition is decorated with a decent layer of plaster - 3-4 cm, we knock down all this "wealth". We'll tear down the wall. We still need this brick.
We diligently knock down all this thick layer of plaster, remove the fiberboard panel, which the pipes in the toilet were sewn up with. We closed the toilet itself, so as not to clog. Dirt, as you can see, enough!
We work in the old fashioned way, with a wide chisel and a hammer. All this work could have been done with a puncher, but we didn’t have one. All materials are already old, so plaster and tiles are easily knocked off.
Here is a wall hiding behind a layer of plaster and tiles.
The most difficult thing was to remove all this “beauty”, as we see, the workers did not regret the mixture.
The walls are uneven - at the ceiling, the thickness of the plaster layer reached as much as 6 cm.
We knock everything down, we remove the lamp.
This is how the wall opposite the partition looks like, it is also brick. We knock out the ventilation grill, put a new one in its place.
Now, finally, the most interesting thing - we dismantle the partition between the bathroom and the toilet, we save the bricks, as I said, they are in good condition, so why spend money on extra materials. Whole bricks are stored in the bathroom.
This is what we get in the end, when we removed all the garbage, knocked out the wall and the door frame of the toilet, there will be a wall here.
There will be little difficulty with the new floor, because there is a decent difference between the bathroom floor and the toilet floor, see how crooked the stool is.
Now this difference must be leveled to the maximum, we knock down everything superfluous with a hammer and a chisel, remove two layers of tiles in the toilet.
See how much space there will be in the bathroom combined with the toilet, there will be room for both the sink and the washing machine.
There is a lot of work with the floor in the toilet: check out which layer you have to remove, almost ten centimeters, to the very foundation.
We are preparing a place for the future wall, there used to be a door here, but there will be a wall, in the toilet in this place it will be possible to place a cabinet or shelves for accessories. Great solution for such a small apartment.
We arm ourselves with a trowel and a cement-sand mixture and build a new wall. Do not forget to use a level so that the wall is even.
View of the new wall from inside the toilet. Simultaneously with laying out the wall itself, we close up the cracks. An old bathroom door frame serves as a wall boundary. Subsequently, we will break the old box and put a new door.
This is how the work goes: broken bricks are also used, they can be inserted into large slots, and then covered with a mixture.
View from the outside: this is how much space will be added in the corridor due to the fact that there will be no door here. In a small area, every centimeter of roads.
The lamp was attached to the wall, but for now it just hangs on the ceiling. In the distance you can see a niche between the slab and the ceiling. Of course, it would be possible to make a locker, but we abandoned this idea, it would be painfully high and very unlikely to be used often.
We close it with a brick, cover the cracks. The old brick was not enough, so I had to buy a new one.
now it's time to dismantle the shaft with the riser. Everything had to be done extremely carefully so as not to turn off the toilet and not disrupt communications. After all, it’s not easy to live without a toilet.
They dismantled everything down to the pipes. There is a hole in the floor. So that the old cast-iron pipe does not fall, we strengthen the floor with fittings, put boxes on the counters so that they do not suffer during repair work.
We close up the hole at the site of the mine with a cement-sand mixture.
We level the floor between the bathroom and the toilet.
We dismantle the toilet. We sew up a riser for pipes. To do this, we needed metal profiles and the most common foam boards - cheap and absorbs excess water noise. We leave an audit window for access to counters. We seal all the cracks with mounting foam. There are also pipes for a heated towel rail.
We insert a new corrugation for the toilet. Before that, it was cast iron, and now it is movable plastic, which means that there will be no problems with installing a new toilet bowl.
We sew up the riser with drywall sheets. We make serifs on the walls - so that the finishing materials hold better.
Here we have such an ideal riser in the end. It seems that the whole wall is sewn up, but it is not - you can see a hidden hatch here so that we can have access to the plumbing system. For this, we needed canopies for furniture and a push mechanism for the door.
Now you can return to the floor, now you can finally level it to get rid of that ill-fated drop. Our assistants in this are a cement-sand mixture and a spatula. We leave to dry.
Because our walls are very uneven. They will have to be properly leveled and an impressive layer of plaster cannot be dispensed with. We install metal beacons for plastering, we will lose a couple of centimeters of space, but we have to sacrifice so that the walls are perfectly even.
We prime the surface, this is necessary in order to strengthen the wall itself (do not forget that the brick is very old) and this will improve adhesion to the finishing material.
Plastering process. As we can see, the layer is impressive, 3-4 centimeters.
Due to the fact that we have beacons installed, we see which layer needs to be applied.
Here's what it looks like in the end. Let's dry.
We cover the entire surface of the walls with plaster, then primer.
Let's go to the floor. Our floor will be tiled diagonally. This way of laying tiles is not easy, but it's worth it. This arrangement visually increases the space, and because our bathroom is small, we will try to add volume at least visually.
Before we started laying the tiles, we prepared the surface - leveled, repaired all the holes and potholes on the walls and floor, primed. The primer improves the adhesion of tiles to the floor. After applying the primer, let it dry.
Here is such a handsome floor we got in the end. Light-colored tiles again add space, and thanks to the pattern, dirt and drops are not visible on it.
It's time to remove the old door frame and install a new door. We dismantle thresholds.
We assemble a new door frame and install it in the opening. In order to prevent the door beams from bending, we put wooden wedges between the wall and the box.
The bases of the box themselves were fixed with metal corners. The outer wall of the bathroom is also plastered.
The door is the simplest, made of chipboard. Firstly, such a door is inexpensive and quite suitable for our interior. We hang it on loops. Then we carefully foam all the seams and cracks between the box and the wall.
New toilet, new toilet. Installed in place of the old one. Now we move on to preparing the walls for laying out the tiles. Our tools are a spray gun, which is very convenient for priming walls, simple and comb spatulas, crosses. I fixed the level on the wall, it will serve us as a starting profile.
We mix the tile adhesive. It will be very easy to check whether it is ready - we take a trowel or a spatula and scoop it up: if it does not drain immediately and does not fall off in a piece. This means that the consistency is ideal, if it is too liquid, add the glue mixture, if it is thick - water.
On the wall, we have already pre-made serifs, for better adhesion of the wall and tiles, and covered with concrete contact, for the same purpose. We draw marks for the tiles, we check everything with a level.
We begin to lay out the reference row, do not forget to use seam crosses, they guarantee that there will be no distortions.
We do the same manipulations with the other wall - we check with a plumb line whether the walls are vertical, we fix the starting level.
This wall is the most difficult - we have communications here. Here you have to rack your brains on how best to arrange the tiles, so that you don’t have to cut a lot. We lay out a decorative border, we have it as a guide - where there is no profile (above the taps), a board was attached under the tile so that the tile does not move out.
We drill a hole for the wiring with a diamond drill, we bring out the wires - here we will have a lamp.
Another difficult area is the space above the door, there is no support row, so in order for the tiles not to move, we will use the good old adhesive tape.
As you can see, we do not lay out the tiles up to the very ceiling, then there will be a suspended ceiling, so we leave 5 cm.
We rub the tile seams.
The tiles are in two shades of beige. Lighter tiles on top and darker tiles on the bottom help visually enlarge the space.
It's time to install a new heated towel rail. Mark holes for fasteners and drill.
Installing a heated towel rail is not an easy task; in order to mount it, you have to install a hook in the ceiling and hang it.
The holes on the wall are made, we report the tile and in the same places we make holes already in the tile itself.
Now it remains to lay out non-whole tiles in the corner.
We complete the installation process. In order not to confuse the cut tiles, we number them, which greatly facilitates the work.
Another way to save space in a tiny bathroom is to sink pipes into the wall.First, cuts were made with a grinder, and then strobes were hollowed out with a chisel, a chisel and a hammer, where the pipes were placed. Installed a new faucet.
Now you need to make holes in the tile itself. To do this, we use a special crown for drilling round holes. We install it on a drill and at low speed in a couple of minutes we get a neat hole.
We glue the tiles, we overwrite. No more pipes disfigure our bathroom.
This is what our bath looks like at this stage. We install the ventilation grill.
Alas, the pictures end there, but the repair does not. It remains for us to decorate the ceiling. This will be an aluminum rail suspended ceiling. As we have already said, our main task is to maximize the space, so we chose a glossy rail.
The spotlights helped us to make the bathroom very bright and therefore feel spacious. Then we hung a new sink, the space under the bathroom was covered with a special plastic screen in color.
No video.
Video (click to play).
As a result, we have greatly transformed the bathroom and received additional space, both in the bathroom itself and in the hallway. In the vacated space, you can put a washing machine and hang shelves. The repair turned out to be budgetary, we used to the maximum what is still quite suitable (brick, bathtub) and chose the most inexpensive materials.