DIY bathroom and toilet repair

In detail: do-it-yourself bathroom and toilet repair from a real master for the site my.housecope.com.

There are many ways to revitalize the interior of the bathroom. In the process of repairing the toilet, you can add interesting details with your own hands. In this article, we will talk about some transformation techniques that will help in the design of the space.

If we are talking exclusively about ideas, watch as many photos as possible. Before starting the repair, it is advisable to represent the final result as accurately as possible. Although some of them will definitely change anyway. If your toilet is already ready for renovation, the following plan can be used.

  1. We decide on the decoration of the walls (plastic panels, PVC, wallpaper or tiles)
  2. Choosing how to hide pipes
  3. We decide whether we need a wardrobe where it will be located
  4. Choosing a toilet
  5. We look at the trends in the finishing of the current year

These are the main steps. Read about each of them with photo examples here - use the plate for quick navigation. And now - cool ideas as such, so that you can pick up something interesting and useful.

Yes, pictures. Many would say that this is a very bad idea for renovation. Nevertheless, practice takes place. The classic design option is a golden frame against a background of red walls.

For each style, you can choose the right picture that will effectively decorate the room. The frame of the product must also correspond to the overall concept.

The tone of the walls continues throughout the painting.

Image - DIY bathroom and toilet repair

A massive white frame sets off the active background and matches the color of the plumbing.

Plant motifs on the wall echo decorative flowers.

The bright pattern is in harmony with the color of textiles and hanging baskets.

Video (click to play).

Pratika shows that most people prefer to make built-in lamps or something else inconspicuous in the toilet. But you can, on the contrary, make lighting a part of the design! A modern design white chandelier matches the shade of the floor, toilet and sink against a wood grain backdrop.

The chandelier is massive enough for this bathroom and attracts attention. Let's skip the jokes!

Decoration in New Year's style. The filling of the niche can be changed, depending on the mood.

An unpretentious composition on the background of wooden dies - a wreath of dried flowers and decor in the form of a dried fish. The idea is easy to bring to life, and its implementation with your own hands does not take any energy at all.

Antique forms complement the marble walls.

Red and white interior in country style for Valentine's Day. Anyone can make such a design.

Candles can replace the main light in the evening.

The accent tone of the stylized bird and the organic shapes of the lamps break the severity of the interior.

Open shelves look spectacular only if order reigns on them.

The wood texture of the shelves matches the material of the cabinet. The three primary colors look great in a single space.

A capacious shelf is formed by the upper edge of the installation box.

In a small bathroom or in a room with brightly decorated walls, avoid piling up furniture, choose a laconic form of plumbing.

A suspended toilet with installation looks compact, without unnecessary details.

Choose plumbing in the same range, especially if the room is miniature.

When choosing an active pattern for the walls, give up wall cabinets in the toilet.

Suspended toilet bowl with installation in a bathroom with an area of ​​0.7 sq. m.

A minimum of items in a combined bathroom with an area of ​​1 sq. m. This was the main idea of ​​the repair: we do everything simply, concisely, and most importantly - cheaply and with our own hands. Tile collections have long been selected by designers in showrooms.

Image - DIY bathroom and toilet repair

No, really. Anything can be found on the market these days.So why not get creative with the choice of plumbing during the renovation? The black collection of sanitary ware looks unusual and is combined with the decoration of the space. The interior is also complemented by a painting in a black frame and a spectacular vase. The twisting branches in a vase are similar in shape to a water heater.

Toilet and sink in the form of truncated and inverted cones. The perspective of the marina and the futuristic shape of the sanitary ware in the interior look interesting and stylish.

Plumbing in vintage style.

Specular reflections distort the perception of real geometry. This is not the most popular technique when repairing a toilet with your own hands; many simply do not perceive this idea in such an intimate room. But this effect allows you to visually expand the boundaries of small rooms.

The mirror makes the room not so narrow (visually).

The article is addressed to those who are going to repair the toilet with their own hands, but have no experience. I will tell you about the most popular and affordable finishes and offer a step-by-step algorithm for working. You just need to follow my recommendations to get a quality result.

Image - DIY bathroom and toilet repair

The photo shows an example of how you can carry out the work yourself

Image - DIY bathroom and toilet repair

Even in a small area, you can create a comfortable and attractive environment.

Repairing a toilet is both simple and complex. Simple because the volume of work is small due to the small area, and difficult for the reason that, due to lack of space, you need to think carefully about everything.

All work can be broken down into 10 stages:

  1. Development of the future interior;
  2. Purchase of the necessary materials and tools;
  3. Dismantling of old plumbing and decoration;
  4. Replacement of communications and laying of new ones (if necessary);
  5. Construction of a box for masking pipes;
  6. Floor covering device;
  7. Wall decoration;
  8. Ceiling decoration;
  9. Installation of plumbing and other equipment;
  10. Door installation.

Image - DIY bathroom and toilet repair

To get a neat bathroom, you will have to carry out a number of works

You do not need to think about where to start work, since first of all you need to think over the layout and decoration.

To do this, you need to do the following:

  • Measure the area at your disposal. This is the main aspect that determines what you can deliver and how to arrange the elements.... Unfortunately, most often there is very little space and you have to adapt to the circumstances, and not come up with interesting solutions;
  • Determine what equipment will be installed. If there is very little space, then most often only the toilet is placed. If there is more space, then you can add a washbasin, bidet or even a urinal, it all depends on your wishes;

Equipment installation standards: from the center of the toilet bowl to the wall should be at least 40 cm, the sink should be located at a distance of at least 30 cm;

Image - DIY bathroom and toilet repair

It is important to position the plumbing correctly

  • A wall-hung toilet can be an excellent solution. It does not take up space on the floor, but a metal frame will have to be attached to the wall, which will take about 10 cm of space. This option looks very attractive, but in installation it is much more difficult, this also needs to be taken into account;

Image - DIY bathroom and toilet repair

Wall hung toilet - an interesting solution for small spaces

  • The color scheme should be in soothing colors. You should not use bright colors and variegated finishes, it does not look the best in the bathroom. You can look at design ideas on the Internet, there are a lot of examples, and anyone will find an option to their liking.

Image - DIY bathroom and toilet repair

There are many options, find the one that you like and which you can implement

After you have decided on an approximate design, you can proceed to the selection and purchase of materials. You must measure the area of ​​the floor, ceiling and walls in advance in order to quickly calculate the approximate costs for one or another finishing option.

First, let's figure out what you can put on the floor:

  • Ceramic tiles are the most popular solution. There are a huge number of types on sale, so there will be no problems with the choice.If you need a cheap option, then I will give you a little advice: look for substandard in stores, it is inexpensive, and due to the small volume, you can choose good ceramics. Most often, the marriage is not visible, but you can save very well;

Image - DIY bathroom and toilet repair

The tile is a great solution, the material looks good and is not afraid of moisture and cleaning agents

  • Self-leveling floor is a relatively new solution that is great for a bathroom. The coating is not cheap, but due to the fact that the floor space is small, the cost of installing it will be only slightly higher than when using ceramics. In addition, this option can be implemented with your own hands, which is also important.

Image - DIY bathroom and toilet repair

Such coatings can simulate a wide variety of images.

For walls, you can use the following options:

  • Ceramic tile. You can create patterns or even ceramic paintings on the walls. For the most discerning, a mosaic is suitable, a very effective, but also quite expensive coating;

Image - DIY bathroom and toilet repair

Tiles are great for walls too

  • Budget finishing option - PVC panels. They cost a little, but they also look much worse than the same tile. But if you need to do it cheaply and reliably, then this decision will come in handy;

Image - DIY bathroom and toilet repair

PVC panels are good for toilets

  • You can even stick wallpaper on the walls. You need to choose moisture resistant options. I would recommend using glass fiber as it can be repainted. That is, you can easily carry out cosmetic repairs and refresh the room in the future, simply by changing the color of the walls.

Image - DIY bathroom and toilet repair

Wallpaper allows you to create a very original setting.

As for the ceiling, it is easiest to implement one of two options with your own hands:

  • Fastening of plastic panels. They look good on the ceiling and are inexpensive. You can choose a more expensive option - rack metal ceilings. They look presentable and are almost indistinguishable from plastic in installation;

Image - DIY bathroom and toilet repair

This option looks good.

  • You can just putty the surface and paint it. If the ceiling is curved, then it is easier to build a frame and fix moisture-resistant drywall... So you get an even base, which must be putty with a thin layer and painted.

Image - DIY bathroom and toilet repair

The color of the ceiling is matched to the rest of the finish

As for the tool, its list depends on the selected materials for finishing. Below I will provide a list of fixtures where necessary.

It is worth starting work by removing everything unnecessary. The process is simple, but it requires a lot of effort and a significant investment of time.

The sequence of work is as follows:

  • First of all, old plumbing is removed. Most often, you just need to remove the corrugation from the toilet. If you have old equipment, you will have to break up the cement that used to strengthen the joints;

Image - DIY bathroom and toilet repair

You can temporarily put a new toilet in order to use the bathroom

  • The floor is usually covered with old tiles, which are very firmly in place. You can knock it down with a hammer and chisel, or with a puncher. The process is dusty and noisy, so it is better to work during the day;

Image - DIY bathroom and toilet repair

Removing old tiles is a tedious job

  • If there are tiles on the walls, then they are removed in the same way as from the floor. If the surface is covered with wallpaper, they need to be soaked and removed. Painted surfaces do not need to be cleaned if the paint adheres to them firmly. The exception is oil formulations, they must be removed, it is best to use a special wash for work;

Image - DIY bathroom and toilet repair

Everything that does not hold well is removed from the walls

  • If there is whitewash on the ceiling, then it must be soaked with water and removed with a spatula. Painted surfaces are inspected, only damaged areas can be removed.

At this stage, the following works are performed:

  • If the old riser does not inspire confidence, then it is advisable to replace it with a new plastic one. Most often, you have to change the section from floor to ceiling, adapters are placed on the connections, and the structure itself is easily assembled from the constituent parts of the configuration you need;

Image - DIY bathroom and toilet repair

The riser is attached to special clamps

  • If you need to lay pipes around the room, then it is best to hide them in the grooves.... Communication may be needed if you put a sink and bidet or bought a toilet with a bidet. It is important to think about the correct pin layout so that everything is convenient. Even if it is not necessary to lay pipes in new places, it is advisable to replace the old steel communications with new plastic ones;

It is better to hide the pipes in the wall

  • Do not forget about laying the wiring to the fixtures and the fan, if any. It is also better to hide them in grooves.

To hide the sewer pipes, you need to build a box. If the riser goes in the corner, then only this part of the room is closed, and if in the middle, then it is easier to make a partition and sew up the entire space behind the toilet.

The instructions for carrying out the work are simple:

  • For the frame, we will use metal plasterboard profiles. Guiding elements are attached along the walls, and the structure is formed by the main profile;
  • First, the structure is marked, vertical lines are drawn along the walls using a level or plumb line, the outlines of the future box are drawn on the floor and ceiling;

Image - DIY bathroom and toilet repair

For accurate marking, you can use a square.

  • A wall profile is fixed along the perimeter of the future structure. To do this, holes are drilled in the walls for fast mounting dowels with a diameter of 6 mm;

Image - DIY bathroom and toilet repair

Guiding elements define the outline of the future structure

  • Then the frame is attached, for this, the main profiles are used. To give the structure rigidity, it is reinforced with ribs, which are located every 40-50 cm;

The frame must be rigid

  • The last step is to mount the moisture-resistant drywall. It is cut into pieces of the required size and fixed with special self-tapping screws with a fine pitch.

When carrying out the cladding, do not forget to leave an opening for the installation of the door to check the condition of the equipment and take readings from the meters.

Image - DIY bathroom and toilet repair

The hatch will be inserted after finishing

We will start from this part of the room. First, let's figure out how a ceramic floor is made. To work, we need a certain set of materials and tools, listed in the table.

Step-by-step instructions for repairing a bathroom and toilet.

According to most finishers, repairs in an apartment should be started from the bathroom. Let me explain why: this is the dirtiest and dustiest part of the renovation, requiring not only the dismantling of old tiles, plumbing fixtures, doors, and sometimes the entire bathroom walls.

So the first thing we do is we take out the old plumbing: a bath, a sink, a toilet bowl ... Everything that costs, weighs, lies.

• Next stage: with the help of a grinder we cut off all the old pipes to the crane located on the riser.

Using a punch, knock down the old tiles.

It is important if the plaster under the tiles moves away from the wall, bunches ... it must also be beaten off.

We dismantle the old door together with the box.

Change risers... Now we turn our attention to the plumbing and sewer risers. This is a very important part of the renovation and must be changed. After renovation it will be very problematic. If you are not a specialist in plumbing work, then to replace the risers, it is better to invite qualified craftsmen, but you can do the internal wiring of the water supply yourself.

Checking the hood... Let's move on to the hood. If we do not want the bathroom to be stuffy, we need to check the operation of the hood. To do this, we bring a burning candle to the hood and evaluate its work by the tongue of the flame: the better the hood works, the more intensely the flame is sucked into the chimney pipe. If the hood does not work correctly, we either clean it or install a fan in it.

We ground the walls... At the next stage, I propose to clean up properly: take a broom and sweep out all the debris and dust from the bathroom. After all the dust has settled, we take a deep penetration primer and prime the walls.

Installing beacons... After the primer has completely dried, we install beacons for further plastering of the bathroom. Lighthouses must be installed strictly according to the level, observing the plane of the wall and maintaining angles of 90 degrees.

Plastering walls... Have you installed the lighthouses? Let's start plastering. To do this, we need a rule, a spatula, a drill and a drill mixer attachment. Bathrooms are plastered, as a rule, with dry gypsum mixtures, since there is no shortage of them on the market. I usually use Rotband plaster. We take a bucket of 12 liters and prepare a solution in it as written in the instructions. Using a spatula, we throw a solution between the beacons of one wall 50 centimeters from the floor. Then we take the rule, press it against the lighthouses and pull it up - we get a flat surface. We remove superfluous from the rule. And so on all the walls - from floor to ceiling. There are not large pits left - it does not matter - then we level them with a spatula. If everything is smooth and beautiful, then you have coped with the task.

Leveling the floors... The next stage is the floors. We level them with the help of "self-leveling floors". We dilute the mixture as stated in the instructions, it can even be slightly thinner, and spread it all over the floor using a needle roller. After drying, the walls and floors, just in case, we check by level, we eliminate unevenness.

We make a detailed plan of the bathroom... At the next stage, we must decide on the design of the bathroom, where? as? and at what height? there will be a bath, a sink, a mirror, a washing machine (if any), a towel dryer, a toilet bowl, a box covering the risers. To do this, we take a tape measure and measure our bathroom - after plastering, the dimensions have changed. Then we take a pencil and a sheet of paper, and sketch everything. Let's call this a bathroom plan. For the plan to be accurate, at this stage, we need to buy all the bathroom objects. It is important to remember: if the bathtub is tied to the size (I mean that your bathtub is not half a football field, but for example 1m.70cm by 1m.50cm), then the bath should be bought as long as possible. And if your size is 1m.68cm. - you need to buy a bath for 1m.70cm. Then 2cm. screw it up. With this sort of sorted out.

Video - turnkey bath repair

We make (sketch) a detailed markup of the water supply and sewerage system... If everything is purchased, then we continue. We collect the bath in a free room. We put it on the legs and level it. As a rule, in most bathtubs, the height of the legs is adjustable - we adjust the height for you. We measure the height and width of the bath. We transfer the dimensions to the bathroom wall. All the same - we do the same with the sink and the washing machine. The next thing we do is mark on the walls how our water supply and sewerage system will go. A bathroom faucet is usually installed in the center 10 cm above the bathtub - this also needs to be sketched on the walls. The distance between the pipes to the bathroom faucet should be 15cm. We mark the water supply for the sink, based on the structural features of the bedside table, and the length of the flexible hoses of the mixer. We mark only one pipe under the washing machine - the cold one. We sketch the sewer pipes at an angle towards the riser (so that there is a drain). If a small slope can be made under the bath and sink, then the outlet under the washing machine should be at a distance of 50 cm. from the floor.

We make (sketch) a detailed marking of the wiring... The next thing we do is define the wiring. How many sockets will we have, and where - if there is a washing machine, then next to it. Use an electric shaver - next to the mirror. If you have a backlit mirror, you will need to bring out a wire under it (decide at what height). If there will be a fan, we will bring it out under it too.

Making strobes... When we have completely decided and sketched, we take a puncher and chase it according to the plan. Next, we remove and prime the grooves.

We install water supply and sewerage... At the next stage, we install the water supply (comb) and sewerage system. Don't forget to install water meters and filters as well.Since our water supply is retracted into the walls, it is better to use polypropylene pipes or metal-plastic pipes.

We mount a heated towel rail... At the next stage, we invite the masters or install the heated towel rail ourselves. The pipes are also wall-mounted.

We advise you to read:

DIY LED lamp repair