Do-it-yourself toilet repair in a new building

In detail: do-it-yourself repair of a toilet in a new building from a real master for the site my.housecope.com.

The process that really requires special attention is the renovation of a bathroom in a new building. This is not surprising, because as soon as the owner moves to a new apartment, more often than not, he sees bare walls and the absence of any design.

Image - DIY toilet repair in a new building

Renovation of bathrooms in a new building

Unfortunately, it is strongly discouraged to make expensive repairs in the first year of residence, because otherwise, after a while, repair work will have to start from the very beginning. This is due to many factors, such as the shrinkage of the foundation, and, as a consequence, a slight shrinkage of the entire structure. How to act in such a situation will be discussed further.

We are starting to renovate a bathroom in a new building. First of all, you should determine for yourself the fact who exactly will carry out the repair work: attracted specialists, or you yourself. It is also recommended to determine the approximate scope of work. In this situation, the advantage lies in the fact that there is no need to remove the old tiles, but special attention will need to be paid to leveling the walls: the conveyor work of regular plasterers is rarely even satisfactory.

Among other things, you should imagine exactly how the room should look after the completion of the renovation. This applies not only to the decoration of walls and ceilings, but also to the arrangement of pieces of furniture and plumbing.

Given the fact that the house was recently erected, you should not immediately make expensive repairs to the bathroom in a new building. It is much more relevant to purchase inexpensive tiles and stick them on the walls and floor. As for the ceiling, decorative panels are ideal for it. This approach is due to the slight shrinkage of the structure. Depending on the time elapsed after the foundation is poured, shrinkage can take from 1 to 3 years.

Video (click to play).

If you neglect this advice, you can get extremely negative consequences. So, expensive tiles will begin to crack and very soon lose their attractiveness.

Among other things, new settlers can expect such surprises as "flooding" by neighbors from above, as well as leaks in their own apartment. In the first case, you will have to urgently repair the ceiling. As for the second option, it will force the urgent opening of the floor covering and the repair of communications, if inspection hatches were not provided.

During repairs in an apartment located in a new building, specialists, as well as the owners themselves, are faced with a number of features that are completely uncharacteristic for secondary housing. Let's consider them in more detail:

  • Careful wall alignment is often necessary. In this case, it is recommended to find out in advance if there are voids. To do this, you can use a regular hammer. If there are indeed voids, they will need to be filled with a plaster mixture;
  • As for the alignment itself, it is in most cases that it takes a long time. As a rule, a bathroom in a new building, like most surfaces in the entire apartment, has walls and ceilings that need to be removed;
  • Before starting the finishing work, you need to complete all the work related to the laying of utilities. This applies to heating, plumbing and electricity. Practice shows that it is better to replace these systems immediately.
  • There is no need to dispose of old wall and floor coverings;
  • Possibility to choose any design. If your own imagination and wishes are not enough, you can see examples of photos and videos.
  • There is no need to dispose of old wall and floor coverings;
  • Possibility to choose any design. If your own imagination and wishes are not enough, you can see examples of photos and videos.

First of all, you need to do all the "dirty" work. They include the following steps:

  • floor screed;
  • alignment of walls and ceilings.

Next, you should decide where exactly the plumbing will be located. This is necessary in order to prepare in advance all the necessary channels for water pipes and other communications.

The next stage is the laying of communications, as well as a grounding device. After that, you can start installing sockets and ventilation grilles. When the preparations are fully completed, the finishing of the bathroom in the new building can be started.

The final stage is the arrangement of pieces of furniture and plumbing.

It's no secret that the services of qualified specialists are quite expensive. That is why, in most cases, those who decided to purchase a new building prefer to turn to craftsmen who came from other (not at all European, but quite the opposite) countries and who work illegally. As a rule, the cost of their work is much lower, which is crucial in most situations, but one should not forget the popular wisdom about being stingy and double payment.

In this case, it should be remembered that the illegal worker can be “found” at any time by representatives of law enforcement agencies and sent to their sunny homeland. Among other things, it is not uncommon for construction crews to receive an advance payment and, after a few days, simply disappear without even starting work. To avoid this, payment should be made after the fact, that is, as the bathroom in the new house takes on a finished look.

Another feature concerns the quality of work. The fact is that illegal builders are well aware that if low quality is revealed, the customer will not be able to contact the company and make a claim, which means that you can not particularly strain.

When choosing a construction team, you should also consider the financial side of the issue. There are often cases when the choice and purchase of building materials is entrusted directly to workers. Thus, the owner does not spend his own time traveling, but, at the same time, may become a victim of the dishonesty of specialists. This applies to both the cost of materials and their quantity. To avoid this, experts recommend not to neglect shopping trips.

An alternative is to visit construction markets and supermarkets in advance, study their assortment and prices for materials that will be needed for repairs. It is also recommended to calculate in advance the amount of material and make an estimate.

Based on the above, you should be very careful when choosing specialists. It is best if it is a construction team that officially works for a company, where it will be possible to send a claim in case of non-conformity or poor quality.

Almost always, new housing is acquired by a happy newcomer from the developer's company without interior decoration and repair, but with communications brought into the apartment. Firstly, such housing in a new building will be cheaper, and secondly, almost always the repair and arrangement of an apartment by the developer is performed extremely carelessly, using cheap materials. Thirdly, there is a desire to complete some stages of apartment renovation with your own hands or with the hands of good craftsmen.

Read also:  Repair of a washing machine indesit do-it-yourself bearing replacement

First, you need to make an audit and inspection of the apartment, to establish problem areas of walls, ceilings and floors. Then we proceed in the following order. We determine what requires repair and finishing in the first place. If the time and money for a complete renovation of the apartment is not enough, it is necessary to put in order first of all:

  • Front door and windows, apartment ventilation;
  • Perform full and highest quality electrical wiring and wiring of sockets around the apartment. This stage must be thought out in as much detail as possible, draw up a connection diagram and a circuit for laying wires into walls;
  • Connect the water and collect the sewerage system in the bathroom and toilet, install a toilet bowl, washbasin and shower cabin;
  • If the start time of the renovation of an apartment in a new building coincided with the heating season, be sure to check the degree of heating of the aluminum registers with a remote thermometer.

In the process of carrying out the listed preparatory work, you can calculate the sequence of repairs in a new building.

Much in the repair of housing in a new building depends on the availability of time and money resources. Having bought a "bare" apartment and having issued the necessary documents for the right of ownership, you automatically start paying rent and housekeeping, for using the adjacent territory, for the removal of household waste and construction waste. After connecting electricity and water, a new apartment in a new building began to bring you a loss in the form of costs for its maintenance and decoration. The longer the repair time for an apartment in a new building, the more it will cost you.

There are two main options for approaching the issue of finishing a new apartment in a new building:

  1. Planned renovation and decoration of the apartment. In this case, the owners draw up a detailed map and a schedule for finishing work, in which all the main types of finishing and installation of devices are prescribed in stages. Such repairs, as a rule, are carried out from scratch to completion by one team of craftsmen. The completion date of a repaired object may take several weeks or months. The disadvantages of this approach include the constantly growing price and cost of work, sometimes exceeding the cost of the estimate by more than two times. As a result, if due to unforeseen circumstances there are not enough funds, the repair can be delayed for an indefinite period.
  2. Fast renovation from scratch. In this case, all of the above stages of repair in a new building are carried out by the hands of hired craftsmen with direct control of the quality of work on your part. An apartment in a new building within a week will be prepared for further decoration of the rooms. In addition to communications, the smallest room of the apartment is finished and equipped with temporary linoleum and wallpaper. In such a room there are still no amenities, but it can be used as housing - a temporary hut and a warehouse for building materials. All other work is performed as free funds and time become available.

The first option is well suited if the family has small children or elderly people who need to provide some comfort and convenience. The second option is considered more economical and quicker, especially if, after finishing the kitchen, bathroom, toilet and one room, the housing is rented, with the consecutive bringing the remaining rooms of the new building to condition.

Among the most popular horror stories for new buildings, it is customary to consider stories about the shrinkage of the walls of the house and its foundation. In reality, a similar process for a multi-storey building should finally be completed by the time the building is put into operation. This period is on average no more than 18 months. If, after 1.5 years, cracks form in the corners, the ceiling or at the joints and in the masonry of the walls, the tiles in the bathroom fall off, and the doors are deformed with skewed doors, this means that the new building has certain problems with the stability of the foundation.With the repair, you should wait until the main thing is clarified - what is happening with the new building.

Before starting work, first inspect the lock on the front door. The model and standard equipment of the door can be subject to separate agreement. Indicate in the addendum to the contract which model of door and lock you want to install. If it becomes necessary to take additional security measures, first of all, change the lock supplied when the new building was handed over.

At the next stage, it is necessary to resolve the issue of installing an electrical switchboard, connecting an electric meter. This will make it possible to start using a power tool when renovating an apartment. To get rid of the need to use a large number of carriers and extension cords, plan the layout of the electrical wiring in the apartment. When doing this, consider the following:

  • For kitchens and bathrooms, wiring must be laid in sealed hoses and sleeves;
  • Lay a separate wire cable to the bathroom for connecting a boiler or washing machine. The cable cross-section must be rated for a current of at least 25 A;
  • An additional wire must be laid to the place where the air conditioner is installed;
  • It is necessary to lead a wire to the bathroom, to the kitchen, to the hall, which will be connected and used in the future when organizing additional grounding.

In addition to electricity, to create more or less normal conditions, it is necessary to connect hot and cold water meters and collect sewage in the bathroom and toilet. It is necessary to start work with the installation of a toilet and a washbasin.

Considering that good plumbing is expensive, for the first time you can install an inexpensive toilet bowl, assemble and connect plastic sewer pipes, a bellows and a washbasin sink. During the renovation of an apartment, plumbing can be replaced at any time. The installation of expensive plumbing increases the risk of damage to it during the repair; it must be installed at the final stage of the renovation of a new building.

To lay a plastic water supply using a perforator, we pierce channels in the walls of the bathroom, toilet, kitchen with a depth of 2.5-3 cm. Next, you need to solder the water pipes and connect the leads to the cistern and washbasin. Finally, we will install and connect cold and hot water meters to the domestic water supply system.

Before starting work, you will need to perform a large amount of cleaning the remnants of concrete and mortar. The main part will be for rough cleaning of walls, floor, ceiling, their chasing, alignment and trimming of seams. Such work gives a large amount of dirt and dust, so it will be necessary to organize good ventilation and wet cleaning inside the new building.

A separate point is to highlight the preparation of floors in each of the rooms for finishing. During the repairs in the apartment, it will be necessary to close up all the cracks, holes in the seams between the slabs, in the floor, in the interior walls of the new building. The most difficult thing will be leveling the floor with a cement mortar screed and reinforcing mesh. This procedure will need to be performed upon completion of the preparation of the walls and ceiling for finishing.

We will perform similar work in the kitchen, bathroom and toilet.

After rough cleaning, it will be necessary to prepare the walls in the kitchen and toilet for laying tiles on the walls and floors. Facing tiles can be laid with your own hands, but it is troublesome and takes a lot of time. Therefore, it is better to entrust the laying of tiles to masters specializing in this kind of finish. While the tiles are being laid, you can do your own repairs in one of the rooms of the apartment. The best option would be to lay decorative plaster or liquid wallpaper on the walls. If at the time of the start of repairs in the apartment of the new building the double-glazed windows in the windows were in a satisfactory condition, then you can start applying plaster on the walls of the room immediately.

Read also:  Do-it-yourself vaz 2110 speedometer repair

Upon completion of the laying of tiles on the floor and walls in the kitchen, bathroom and toilet, you need to lay inexpensive linoleum in the corridor connecting these three rooms and the room in which the renovation was carried out using decorative plaster. This will reduce the amount of dust being raised and make cleaning the apartment easier.

Before finishing the walls in the apartment, it is necessary to align, and if a defect is found, to repair the interior doors. If your future plans include wallpapering, normally closing doors are essential for high-quality wallpapering. After the wall decoration is completed, we proceed to laying linoleum, laminate or carpet on the floor of the apartment. The most practical is considered to be a laminate for living rooms; for a corridor, an office version of linoleum with increased abrasion resistance. This type of work does not require special qualifications and is easily done with your own hands during the renovation of a new building apartment.

The final stage of the renovation is the connection of lamps and the installation of furniture in the apartment. Approximately 70% of the volume of work during repairs in a new building is quite available for doing it yourself. And only when performing special types of finishing - laying parquet, installing stretch ceilings, installing double-glazed windows or entrance doors in a new building, you will need the services of specialists.