homeCraftsDo-it-yourself apartment renovation where to start
Do-it-yourself apartment renovation where to start
In detail: do-it-yourself apartment renovation where to start from a real master for the site my.housecope.com.
Have you finally made a decision to renew the interior of your home? Then the knowledge of what stages of apartment renovation await us and how to observe their sequence will come in handy. So many, at first glance, imperceptible nuances can arise.
If you determine the sequence of actions in advance, the result will only please.
This is a chance to significantly save your budget, since you don't have to redo anything and buy in a hurry, while overpaying.
The duration of the work will be reduced. Self-organization always contributes to a faster completion of the case.
The first mistake of the owner, who decided to start construction work, is the thoughtless purchase of building materials. Often, due to haste, he buys a lot of excess, but what is actually needed, on the contrary, remains on the shelves. After all, even for groceries, it is better to go with a well-thought-out list. Read how to start repairs in our article. It all starts with an estimate. In this case, it is advisable to invite a specialist for consultation, even if only independent work is planned in the future.
Before starting the repair, it is necessary to develop a project and draw up an estimate With a well-defined plan and a competent list of everything you need, you can start.
We draw your attention once again: to avoid mistakes, alterations and downtime during the repair process, be sure to adhere to the ready-made plan.
Step-by-step repair steps
It all starts with total preparation. Such jobs include:
removing old wallpaper;
dismantling of plaster;
destruction of walls and partitions not provided for in the new project;
removal of floors;
dismantling of surfaces intended for replacement.
Repair stages in a new building skip the dismantling stage, proceeding directly to the next step.
Dismantling the interior
First of all, they carry out work on the installation of communications. Before making repairs, you need to do all the operations that can destroy new coatings: installation of windows, doors, wiring and ventilation. Also, pipe wiring can be attributed to this stage. Read more about this in our articles:
Video (click to play).
All old electrical wiring is removed and a new one is installed. The safety instructions for the placement of outlets will help you to position the electrical components correctly and use wires with a sufficient cross-section. For example, you should take care of the presence of thick wiring and grounding at the point to which the washing machine will be connected.
At this stage, you can change the entire layout of the apartment, bringing novelty and additional comfort to the interior.
With the help of partitions (especially if the extra walls are removed), you can create an office, a nursery, divide a bathroom. Most often, bricks or foam blocks are used for such purposes, less often drywall. By covering the new wall with soundproof plaster, you can achieve more comfort. When creating partitions, it is important to take into account the squaring of the premises, sometimes it is better to leave one large room than to make five small ones. In addition, the creation of unnecessary partitions can lead to a violation of the natural ventilation of the apartment. So when erecting additional walls, be sure to consult with professionals. Articles on our site on the topic:
For plastering work, it is recommended to use a ready-made cement-sand mixture (DSP) or gypsum plaster, which will eliminate possible mistakes in self-mixing the proportions of sand and cement. If there is not enough experience in such work, it is still better to hire specialists.Firstly, it saves time, and secondly, you do not have to redo unsuccessful work. More details:
Pouring concrete, equalize the floor. The quality of these works will affect the subsequent placement of furniture in the room. Probably more than once faced with the problem of leveling a table, chest of drawers, armchairs and, more significantly, a washing machine. A good screed will help avoid such difficulties in the future. More: leveling wood and concrete floors.
At least a week should pass between the screed and the installation of drywall for the room to dry out. We install the iron sectional base, leveling the surface of the ceiling. Then we mount the drywall sheets. More detailed articles on this topic:
If you have not encountered such work before, then it is better to invite a specialist. The cost of fixing a marriage is much higher than paying a professional. After all, the tile itself is not cheap, and any possible flaws will be visible from the outside: this is usually the most beautiful and conspicuous part of the interior.
Moreover, the complexity of the work directly depends on the complexity of the pattern on the tile. More details in our articles:
The stages of bathroom renovation are slightly different from those in other rooms:
design;
dismantling;
installation of pipes;
finishing work on the ceiling;
installation of electrical wires;
finishing work on walls and floors;
installation of lamps;
installation of ventilation and heating equipment;
door assembly.
The stages of repairing a bathroom are shown in the video:
So, whether the walls are painted or wallpaper is glued, this is already starting to give the room a complete look. We have come to the finish line! Details in the following articles:
Experts were divided on the sequence of actions at the last stage. Some believe that wallpaper should be glued after laying the floor covering, others - on the contrary. But most still prefer to finish the renovation activities with flooring. Read also:
With the wall covering sorted out, the floor looks as it was intended. The repair is over!
Careful planning of the course of renovation works greatly simplifies the matter and saves the budget. Do not be lazy to calculate everything in advance (preferably, together with a specialist).
It should be noted that the stages of bathroom renovation are slightly different due to the increased complexity. But the right approach to work makes any difficulties insignificant and easily surmountable. We wish you successful installation work!
How to start repairs in a new building from scratch. The sequence of stages of repair in a new apartment.
Wall design with wallpaper. How to correctly combine different types of wallpaper, interior photos. Tips for choosing colors and patterns.
What to look for when buying a screwdriver. Performance instructions and tips for choosing. Battery type and capacity, power.
Where to start repairing an apartment so that the repair work does not stretch out for an indefinite period, and the end result undoubtedly pleases you, this is what will be discussed in today's article. Renovation of the apartment requires serious preliminary preparation. The most important point is drawing up a detailed plan for future repairs, taking into account the smallest nuances. Consider, point by point, the advice of professionals on the correct organization of repair work in houses and apartments.
First of all, you need to decide on the complexity and volume of future repairs. To make the apartment bright and clean, sometimes it is enough to carry out cosmetic, superficial repairs: replacing the wallpaper, whitewashing the ceiling, changing the old linoleum, painting the walls, etc.
If you want to completely get rid of everything that is boring and old, decide on a major overhaul with the replacement of windows, leveling the walls, installing new floors, modern ceilings. Your home will be transformed and become new and beautiful.
You should not refuse the help of experienced specialists when carrying out major repairs. This is especially true for the creation of a modern design for your apartment, including redevelopment and the demolition of some walls and partitions.
Plan renovations based on your financial capabilities.
First, decide on the interior and design of each individual room that you plan to change in your apartment. You can seek advice from a professional designer, which will slightly increase your total financial expenses for repairs. For rooms where renovation will be carried out, it is necessary to complete detailed drawings of the successive stages of repair work.
We recommend that you complete five detailed renovation sketches for each individual room. In the first drawing, display the top view of the room, and in the other four, each wall. Complete each drawing with a detailed description and a plan for the sequential implementation of repair work, which will avoid omissions and inaccuracies in the work.
When drawing up a repair sketch, it is recommended to indicate:
Think over the location of the furniture. Those walls that will be most conspicuous need to be given special attention and use the highest quality finishes.
Think about where it would be best to place lamps and chandeliers so that the light illuminates the room as much as possible.
Given the location of the household appliances, indicate the locations for the outlets. To then correctly design the installation of electrical wiring in all rooms.
Consider the location of the main decorative elements: paintings, mosaics, brick walls.
In the repair plan, you need to indicate the desired finishing option: wallpapering the walls, painting, etc. To divide a room into separate zones, designers recommend painting one of the walls in a different color in order to focus on it and visually divide the room. These moments also need to be reflected in the plan.
According to the advice of experienced professionals, in order to avoid unnecessary dirt and dust when carrying out repair work, it is recommended to first of all carry out repairs in the rooms farthest from the front door. The final stage of the repair, it is advisable to choose passage rooms and a corridor through which building materials and tools are constantly sweeping. This is necessary in order not to stain or scratch the finish of the already repaired wall, not to damage the new floor.
An additional protection of the repaired room can be a cellophane film (fixed on the outside of the door), which will reliably protect the room from construction dirt, dust, plaster, paint, and accidental damage.
Do not carry out all repairs yourself. At your request, the execution of all repair work or only the performance of particularly complex repair operations can be entrusted to qualified specialists. Firstly, experience and knowledge will allow them to carry out repair work quickly and efficiently. Secondly, you do not have to additionally buy expensive tools, with the help of which the screed is ideally poured onto the floor or the tiles are laid out.
Even if the installation of an interior door seems easy to you, the slightest inaccuracy is unacceptable here. Of course, you can hang and arrange kitchen furniture, level the walls and paint a little yourself. But entrust more complex repair work to specialists so that you do not have to redo it, which can significantly increase your financial costs for repairs.
#one. After the final choice of the design of the appearance of the rooms, furniture and interior, it is necessary to draw up a complete list of the necessary building materials. Their number and total cost depends on the amount of repair work and how they are carried out. If the budget allows you, you need to purchase building materials with a small supply.
# 2.Make a separate list of decor items: holders, shelves, mirrors, paintings, etc. Start your purchases with the selected decor elements. If the planned decor element is not available, you can quickly change or create a new design version of the apartment renovation.
# 3. Make a list of the building tools you need to complete the renovation. To do this, you can use the advice of a sales assistant in hardware stores or qualified repairmen.
When the preparatory work has been carried out: plans and sketches of the repair have been drawn up, lists of the necessary materials and tools have been prepared, a decision has been made about the possibility of self-repair or with the help of repair specialists, you will be able to calculate the approximate total cost of the planned repair.
You should not rush to purchase all the materials when you visit your first store. In the compiled lists of materials and tools, put down the prices of different stores, which will allow you to make purchases at a minimum cost. Carefully consider the choice of repair crew services. Pay special attention not only to the proposed cost of repair work, but also to the feedback from your friends about the quality of repair services.
To protect furniture from damage, construction dirt and dust, collect it in a central area of the room. Then carefully cover with plastic wrap. This will free up access to the walls and ceiling. Move expensive equipment and clothes to other rooms.
Repair work should start with the most dusty ones: replacing window blocks, window slopes and installing new window sills. This will avoid dirt and dust during painting work, when it is forbidden to open windows in order to avoid temperature extremes and an increase in humidity. When windows, slopes and window sills are installed, cover them with plastic wrap or hardboard to avoid accidental mechanical damage and contamination.
Mark the installation locations of additional outlets, make the electrical wiring. Do not install sockets or plug them into the enclosure at this point.
In the case of welding work (for example, when replacing heating radiators), do them at the same time in different places of the apartment in order to quickly complete this dusty and difficult stage of work, sometimes including breaking down walls.
Before repairing walls, floors, ceilings, you must check their condition with a laser or water level. Begin by applying the thickest layers of mortar. As they dry out, you can carry out other minor repairs without downtime.
After completing this preparatory stage, proceed with the repair work, performing them in the following sequence: repair of the ceiling, walls, floor. Initially, work is carried out using putty, cement, gypsum mixtures. Then they begin to work on the installation of the floor, doors, slopes.
Final repairs:
Pasting or painting the ceiling.
Wallpapering or painting the walls.
Installation of flooring.
Installation of skirting boards, sills, platbands.