After ceramic tiles have been laid on the floor and walls and a suspended ceiling has been installed, you can start installing new plumbing elements in the previously provided places. The installation should be started with the bathtub, as this is the largest element and requires a lot of space for correct installation.
After the bathroom, a toilet bowl and a washbasin sink are installed in place. Next, the mixers are installed, the drain tank is connected and all elements are connected to the sewage system using plastic pipes with a rigid or corrugated base. This process will be described in detail by the bathroom renovation lessons presented in the video.
VIDEO
At the final stage of the repair, the finishing decoration of the room is carried out, which includes the installation of a mirror, the installation of various shelves and additional hangers, the installation of lamps, a washing machine, the placement of bath accessories and decor elements.
By watching video tutorials on bathroom renovation, you will receive the necessary theoretical knowledge and useful repair tips that will help you avoid many mistakes and significantly speed up the workflow.
Each person has a favorite place in the apartment, where he can completely relax, retire, relax. For some, this is their own room, for others, the kitchen, and for others, this place will be the bathroom. But, whatever it is, I want it to be beautiful and cozy there.
Most people live in apartments where the size of the bathroom leaves no room for imagination in terms of design. But even on three or five square meters, you can create a unique project with your own hands.
The training video will reveal all the secrets of DIY bathroom renovation.
Do-it-yourself bathroom renovation is designed for 14 days. That is, in two weeks the premises will change beyond recognition. During the repair, you will definitely need a "grinder", a hammer drill, a jackhammer or a sledgehammer.
You need to start with redevelopment, placing directly the bathroom, washbasin, mirror, heated towel rail, boiler and washing machine in the most optimal way. Dismantling work is also carried out, during which old tiles are knocked off the walls and floor, the suspended ceiling is removed, if there is one, all layers of putty and plaster are knocked off right down to the brick wall or slab. Old pipes are cut with the help of a grinder. The walls are treated with a primer.
Work is being carried out with the transfer and installation of risers and pipes for water supply and heating. The most durable today are metal-plastic pipes. Remember: risers must pass through ceilings to avoid future leakage problems.
Walls and floors are primed. Plaster "under the lighthouse" and floor screed are produced.
Installation of sewerage and water supply systems, including the installation of meters and collectors.
Electrical work, including the installation of sockets and lighting. The floor is waterproofed.
Installation of heated floors, on top of which tiles are laid. The tile seam is created using special crosses. Seams with a thickness of 1.5 mm look more aesthetically pleasing.
Grouting the previously laid tiles and installing the bathroom.
Installation of doors and tiling on walls. It is for walls that it is recommended to use glossy tiles so that as little dirt as possible is retained when water flows down it. With the laying of tiles, both on the floor and on the walls, you can dream up. For example, lay out diagonally. A grout is used for grouting.
To check the quality of the tiles, you need to stack the two together. There should be no gap between them.In addition, they must be of the same height, otherwise the seams may come off. The color of the tiles can be absolutely any, the main thing is that it does not irritate. Pastel colors are considered the most suitable.
With the help of a plasterboard board, which is installed at an angle, the space under the bathroom is closed. This is done in order to free up more free legroom (it is more convenient to approach the bathroom). Tiles are laid on top of the screen. Be sure to leave access to the space under the bathroom in the form of small holes closed with special doors or tiles that are attached to magnets. It is recommended to make a waterproofing sill to prevent water from flowing out of the bathroom into the corridor in the event of a leak.
After tiling, a heated towel rail is installed. A suspended ceiling is being installed. The joints between the bathroom and the walls are being worked out. A sink, faucets, sockets and lamps are being installed. A mirror is attached.
The renovation of the bathroom has been completed.
Whether to provide this business to professionals or to do the repair personally, everyone decides on their own. It takes a lot of effort, but the result will make you rejoice. You can also make a real museum of modern art out of a bathroom, with a little effort and adding fantasy.
DIY bathroom renovation for beginners! In the master class, we are talking about installing a bathtub in a bathroom on silicone.
alteration of a bathroom, dismantling, preparation for laying tiles, mosaics, the whole process from A to Z, part one.
The video examines in detail the decoration of the walls in the bathroom with plastic panels in 1 day with your own hands. Not expensive.
Do-it-yourself master class on laying tiles for repairing in a bathroom, you will also learn about the secrets of quality.
Hello my construction friends! Today I will show you how you can make repairs in the bathroom with your own hands: put it.
Repair of a bathroom in an apartment on your own and with your own hands. It is not difficult, you just need a will, free.
Hello everyone! My name is Lena Thank you for your likes and subscriptions! I live in Orenburg, Volga Federal District LET'S.
In this video, we will tell you about the main stages and features of the cosmetic renovation of the bathroom. Nice.
50% DISCOUNT on the video course “Do-it-yourself apartment renovation”: 30% DISCOUNT on the NEW video course:
Do-it-yourself master class on laying tiles in the bathroom. Laying tiles in 10 minutes! Laying tiles 3 times.
1.H OVERVIEW Getting Started DIY Bathroom Repair video REVIEW! Modern Bathroom Design Ideas Combined.
DIY bathroom restoration, liquid acrylic. The method of restoration of the old cast iron is very succinctly shown.
TITANIUM REPAIR company. Repair of bathrooms, toilets, apartments. Large selection of materials, catalog with photos.
Modern design and renovation of a beautiful bathroom combined with a toilet with your own hands!
Do-it-yourself bathroom repair combined with a toilet video Do-it-yourself shower tray
The whole process ! Repair of a small bathroom combined with a toilet with your own hands video instruction.
70% DISCOUNT on the video course “Do-it-yourself apartment renovation”: 30% DISCOUNT on the video course “Ceiling.
Channel overview. DIY apartment renovation video Link to video Link to ours.
Plumbing Store - The video examines the terrible state of the bathroom in Khrushchev where.
TOP Modern Design DESIGN AND REPAIR OF BATHROOM and toilet with your own hands Video Beautiful. Master Class.
Before embarking on an independent bathroom repair, especially if this is the first such experience, you must carefully read the instructions, and then see how the work is done "live". So, today we will talk about how to make a bathroom renovation: videos, photos, expert recommendations, everything is at your service.
The step-by-step bathroom renovation can be divided into two stages: dismantling and mounting.
They start by removing old plaster, tiles and other finishing materials, dismantling plumbing equipment and pipes in the following order.
In the photo, the dismantling of old finishing materials
unscrew the drain pipe, then close the resulting hole with a plug;
carefully dismantle the bath and take it out of the room;
in the same way, unscrew the drain siphon and sink drain pipe, close the hole with a stopper;
dismantle and take out the sink;
cut pipes;
knock down the tiles on the walls and floor.
Advice! If the washbasin does not need to be replaced, to avoid damage during the repair process, cover such plumbing with a blanket and then with oilcloth.
Now we turn to the installation stage, which includes the purchase of the necessary materials, the installation of new pipes, plumbing and finishing the premises. The laying should be done on your own only if you already have experience in such work, since this process requires a clear calculation.
New pipes are installed with old ones in the same plane with a neat, even joint. Particular attention is paid to the calculation of the mixer installation - the distance to the walls should take into account the thickness of the mortar and tile layer .
hot and cold water pipes are bred point by point;
connect to a heated towel rail;
replace taps on risers;
install fine filters;
install pressure regulators and manifolds.
Next, they carry out the necessary electrical work, connecting the light and the hood, and proceed to the facing with ceramic tiles.
Advice! When buying a tile, be sure to make an accurate calculation of the required amount and add a small margin to it. If errors were made in the calculation (or several tiles will be damaged), it can be difficult to buy the selected collection in addition.
A video with detailed step-by-step instructions will show you how to perform the cladding correctly and beautifully.
After viewing, the installation process will not seem so complicated, provided that the instructions are followed strictly, even a beginner will be able to do it.
VIDEO
Now you can proceed to repairing the ceiling in the bathroom, which is finished with PVC panels (price - from 230 rubles per sheet).
If you are ready to continue renovating the bathroom, the video will tell you how to properly install the bath.
shut off hot and cold water valves;
apply the sink to the wall and mark the installation locations of the fastening bolts;
using a drill, holes are drilled in the marked places;
if the wall is finished with plasterboard, be sure to install a metal structure;
install the sink and tighten the nuts;
After installation, the sink should be stable in a horizontal plane, not swing and be securely fixed.
Advice! Before buying a sink with a foot, you need to measure the distance from the water supply valves to the floor. Often this height is 80 cm, however it is better to check to avoid problems during installation.
Do-it-yourself finishing includes installing heated towel rails, mirrors, shelves, and possibly connecting a washing machine.
Installation of heated towel rails, mirrors, shelves
When everything is ready, carefully examine the result. If there are minor imperfections, fix them immediately.
We hope you found our article helpful. In order to more accurately understand the technological and practical issue, our website contains detailed photo and video instructions, in which you will find useful information on this issue.
Many home craftsmen do not know where to start repairs in the bathroom and in what sequence to perform such work. We have prepared detailed and understandable instructions.
The room in which we receive water treatments is considered to be very specific. Serious humidity and temperature fluctuations are constantly present here; water pours in large volumes.It is clear that for the repair of such a room, it is necessary to select special materials that are able to withstand all negative influences. For the decoration of the premises of interest to us, they usually choose:
plastic panels;
porcelain stoneware;
tile (for wall and floor decoration).
These materials have the required qualities, allowing them to be used in a room where there is steam and high temperatures.
Bathroom decoration with plastic panels
In addition, the bathroom should have a special atmosphere conducive to human relaxation. This means that you need to competently think over the design of this room and choose the right color scheme. Most often, bathrooms are performed in pastel colors that do not irritate a person, but, on the contrary, soothe his nervous system after a busy day. Professional designers recommend finishing sanitary ware with products of beige, blue, peach, blue shades.
Thus, bathroom renovation should begin with drawing up a design project, selecting and purchasing the required materials. At this stage, you will need to foresee a lot of little things and purchase a lot of different products, ranging from sewer pipes and glue for installing tiles to valves and a heated towel rail.
Now you need to decide on the scope of work and draw up a plan for their implementation. The sequence for self-repairing a bathroom is usually as follows:
Preparing the room for renovation activities.
Analysis of the condition of the existing flooring and the choice of technology for its restoration or complete replacement.
Floor repair, insulation and waterproofing.
Installation of sewer and water pipes.
Laying of electrical wiring.
Plastering of ceiling and wall surfaces, covering them with the selected material and insulation.
Installation of an efficient ventilation system.
Installation of sanitary equipment.
The given sequence will allow you to spend a minimum of time on giving the room for water procedures the ideal look.
VIDEO
Where to start preparing the described room for its complete transformation with your own hands? Of course, with the dismantling of all plumbing fixtures installed in it, as well as furniture (if any), lighting fixtures, mirrors and hanging structures. If you're doing a major bathroom renovation, be sure to remove your faucets and faucets.
Removing old tiles in the bathroom
After that, proceed with the removal of old finishing materials. Remove the cladding from the walls and ceiling, knock down the ceramic tiles (along with the layer of glue that held them), rinse off the paint. If you have a punch, the preparation of the bathroom for a good repair is much faster - feel free to knock down everything that leaves the ceiling and walls. Your task is to get to the brick or panel masonry and floor slabs.
After such actions, it will be necessary to align the walls in the bathroom, which you "bared", and carefully treat them with primers. You should choose them wisely. Do not forget that now there are a variety of primers - bioprotective, hydrophobic, contact, increasing adhesion, strengthening. If you do not know what kind of composition you need to purchase, be sure to consult with a specialist. Real help in this matter is often provided by consultants of good construction stores.
The next step in preparing the bathroom is to revise the flooring. When the old screed showed itself exclusively from the best side during operation (for example, you forgot to turn off the water, it flowed for a couple of hours, while a drop of moisture did not seep to the neighbors below), leave it. If the tie has clearly served its purpose, it must be removed.
This operation is performed with a perforator with a chisel. The old cementitious tile backing can also be removed with these tools.An important point! If you will not touch the old screed, it is better to clean the substrate with a grinder equipped with a grinding cup-shaped wheel (usually called a diamond cup). The cost of such a device is quite high. But it will always come in handy for the master who does all the housework with his own hands.
Now you can sweep out all the dirt and debris and proceed directly to the repair work.
VIDEO
It is recommended to make the screed with a solution consisting of the following components:
sifted quartz sand;
cement M500 (you can also take M400);
PVA emulsion;
water.
The ratio of cement to sand is 1 to 4. You need to mix the same amount of water as you do cement. It is most convenient to form a screed with your own hands using marker beacons. The mixture is applied in a layer of about 4–5 cm, rubbed with a building rule, after which it must be carefully smoothed with a polyurethane foam or stainless steel polisher to an ideal state (no cracks, swells and other defects). Very important! A made screed based on sand and cement must not be touched for 40 days. During this time, no work in the bathroom must be performed.
Create a new concrete floor screed
Waterproofing a room with high humidity is best done with polyester or aquaizol materials. Do not use ordinary waterproof film for this purpose. Lay the waterproofing material as carefully as possible, the joints between its individual parts are connected in two ways:
Building hairdryer.
By gluing mastic with a special composition.
The waterproofing is installed on the walls by 25-30 centimeters. Note that in the corners of the room, the presence of cuts in the moisture-proof film is not allowed. Better fold the insulating material, make folds. But never cut the film.
VIDEO
It is almost impossible to see open sewer pipelines in apartments these days. Such communications spoil the whole look of the bathroom, nullify all the tricks of the designers. Shtrob the walls in order to hide the pipes is also not an option. This procedure is very tiring, dusty and really time-consuming.
Installation of piping in the bathroom
For this reason, sewer pipes are now most often installed according to a special technique - they are launched along the bottom in a bundle, and then masked with galvanized slopes. The latter can then be easily glued with silicone tiles (facing). The silicone composition is used for fixing the slope from the floor surface and to the wall.
Unfortunately, it is impossible to carry out repairs in the bathroom at all without shading. In any case, you will need to make two grooves for cases when a separate mixer is installed on the washbasin, or one if a common mixer is used. One thing calms down - the length of the strobes will be minimal. In addition, they are positioned vertically. It is relatively easy to punch them with your own hands, which cannot be said about horizontal strobes.
For a heated towel rail, it is advisable to install metal-plastic pipes. You shouldn't even look for other options these days. Such tubular products are ideal for use. They can be easily folded down and sloped using transition fittings.
But for the cold water supply system in the bathroom, polypropylene pipes (PPN) are more suitable. They are easily welded into a solid and reliable monolithic structure, and then hidden in the walls. It should be said right away that it is advisable to purchase fittings for such pipes from solid plastic. It is impractical to use metal reinforcement elements. They can leak at any time. But the sealed plastic will never let water through.
The installation of the pipeline should begin with the installation of sewer pipes. Using sealant and seals, you will spend no more than one day assembling them. After that, feel free to install polypropylene products for cold water and solder them. Be sure to blow out the pipes in the grooves with polyurethane foam.This will ensure that the pipeline does not fog up. And the heat loss in this case will be significantly reduced. Follow the recommended piping sequence and your bathroom repairs will go faster.
Electrical wiring is carried out with a cable protected by a double insulating layer. It is desirable to place the wire in a metal or plastic corrugation. It is better to use a metal sheath as it shields the wiring perfectly.
VIDEO
Having dealt with the communications, proceed to the processing of wall surfaces. Wall plastering is performed with two compositions - starting (it has increased tenacity) and finishing. The latter perfectly levels the treated surface. Plastering is necessary from the ceiling to the floor.
The following stages of repair work:
Ceiling insulation and cladding. Thermal insulation is recommended to be performed in the form of a cake, consisting of two glass-magnesium sheets and a heater placed between them. The cladding can be made with clapboard (plastic) or laminated boards, which are fixed to the ceiling with construction silicone or strong assembly glue.
Laying tiles on the floor. The sequence of the operation is as follows - mount the products with glue, starting from the door, tap each tile with a hammer (rubber). All trimmed rows should be installed last and after the adhesive under the remaining rows has completely hardened.
Wall covering. It is produced with plastic panels, porcelain stoneware, ordinary tiles.
VIDEO The last stages of work are cleaning the ventilation duct (or installing a new one), installing a sink, a bathtub (shower cubicle), mixers, water meters. If you were able to do all the previous operations, the plumbing placement will take place without difficulty. There are no special wisdoms here.
That, in principle, is the whole step-by-step plan for self-repairing a bathroom. You just need to start implementing it and after a while enjoy the new look of your room for water treatments.
This video will allow you to see all the stages of bathroom renovation - from scrapping the plumbing booth to finishing.
Before the start of the renovation, the bathroom was 150x135 cm, and the toilet was 110x70 cm.
After the completion of all the repair work and the demolition of the slate sanitary cabin, the combined bathroom has dimensions - 235x160 cm.
The plasterboard sanitary cabinet has a minimum size of 30x50 cm.
VIDEO VIDEO VIDEO
Home page »Publications» Do-it-yourself bathroom repair: video and photo, instructions for beginners
Do-it-yourself bathroom renovation is an urgent issue, since at a certain point in time any room needs repair, especially the bathrooms in Khrushchev.
Any renovation in the bathroom: cosmetic or major, done by yourself, will save a lot of money.
However, if there is not enough knowledge and skills for some work, then it is better to turn to professionals, since the safety of using the bathroom depends on this.
It is also important to choose high-quality materials for the bathroom in order to avoid repeated repairs, for example, inexpensive tile adhesive entails unpleasant consequences in the form of fallen off tiles.
For the correct execution of the work, you need to know: how to make repairs in the bathroom. It is also recommended to watch all the stages in more detail on the video.
As a rule, both cosmetic and major repairs in the bathroom with your own hands begin with preparatory work. To carry out repair work, the room must be completely vacated.
It will be ideal if only a sewer riser and a drainage system remain in the room, as in the photo.
Walls need to be cleaned from the old coating to the concrete base.
Cleaning should be done with high quality; even the smallest areas with old mortar and plaster should not remain on the surface.
If we talk about a bathroom in a Khrushchev, then there may be a box that provides ventilation.
This box can be safely removed and replaced with a drywall box.
The next step is to install the pipes. Polypropylene pipes are recommended. Polypropylene is an inexpensive material ideal for a bathroom.
Steel pipes are cheap, but they corrode and therefore have a short lifespan. Work begins with a plumbing. As a standard, the walls are either plastered or covered with plasterboard.
In the presence of a box, pipes are drawn close to the walls without special recesses for pipes in concrete, as in the photo. The pipes are fixed to the wall using clamps.
In the case of drywall, the tight fit of the pipes to the walls is explained by the fact that when installing the drywall box, the bathroom space decreases, and due to the dense arrangement of the pipes, the reduction in area will be minimized.
Sewerage requires pipes with a diameter of 50 mm. When constructing a drywall box, all pipes are mounted inside, in other cases special recesses are made.
The indentations should be such that the pipes can be completely hidden in the wall. After that, the walls are plastered.
In this case, sewer pipes must be placed at the bottom, closed with a box along the entire length. This method is recommended for bathrooms in Khrushchev.
The next step is very important - the installation of electrical wiring. The electrical wiring in the bathroom provides good lighting and also allows the use of various household appliances.
The location of sockets, lamps, switches should be thought out in advance. If there is a drywall box, all wiring must be hidden behind it.
All wires must be insulated. For this, the wires are placed in a cable channel or insulating corrugation.
If the plasterboard box is not included in the plans, for example, in a Khrushchev, then the electrical wiring is attached to the wall and covered with plaster.
Sometimes it is necessary to make electrical wiring on a plastered wall, in which case it is necessary to make grooves in which the wires are laid, after which they are covered with plaster or alabaster.
In detail, the installation of electrical wiring in the bathroom is presented in the video.
VIDEO
When the premises are prepared, the pipeline and electrical wiring are ready, all materials are purchased, you can proceed to finishing work.
Finishing work in the bathroom begins either with plastering the walls, or with the manufacture of a drywall box, which will serve as the basis for any design idea.
Plaster is a cheaper option for finishing in a bathroom. When plastering walls, the surface is first primed. After that, beacons are exhibited, as in the photo.
To do this, vertical strips are attached to the surface, along which the surface will be aligned using the rule.
There should be such a distance between the planks that, when aligning along the edges of the rule, 10 cm remains before the planks.
When the beacons are ready, you can proceed to preparing the plaster solution.
For the solution, cement and sand are mixed, after which the mixture is applied to the wall and leveled with a rule.
If necessary, the plaster can be applied in two layers: first, one layer is applied, and after it dries, the second. The next day, the plaster is trowelled in order to remove irregularities.
The main task is to create a smooth wall surface for further tiling. This finishing method is shown in the video.
VIDEO
Consider making a drywall box in a bathroom. The frame of the box is made of a metal profile. You need to start with fixing the UD profile from the bottom and from the top along the walls.
Next, insert the CD profile vertically with a pitch of 40 cm. Along the CD profile, every 50 cm, fastening brackets are fixed. The profile and brackets are fixed with self-tapping screws.
At this stage, it is necessary to place mineral wool or foam insulation between the frame and the wall, as in the photo.
The partitions of the frame are made in the same way. A UV profile is required for the main perimeter, and a CV is used for the inner profile.
When the frame is ready, you can proceed to the sheathing with moisture-resistant plasterboard, which is attached to the profile with self-tapping screws 25 mm long. The joints between the sheets must be glued.
It is better to watch the manufacture of the box in the video. The box is not recommended for small rooms in Khrushchev.
VIDEO
The next step is wall cladding. There are various ideas for bathroom wall cladding. An excellent option is tiles, which are ideal for a room in a Khrushchev building.
The tiles must meet certain requirements: all corners must be straight, and the surface must be flat and perfectly flat.
It is recommended to use porcelain stoneware, which, of course, is not quite budgetary in price, but is more durable.
You need to start by calculating the number of rows and performing the markup. Laying should be started from the second row, since it is more convenient to lay the first row last.
The top row should only be made of solid tiles.
Glue is applied to the wall and tiles, and the evenness of gluing must be checked with a level. You cannot save on glue, since a cheap composition will not provide proper fixation.
Special crosses need to be installed between the tiles, which will ensure the same seams. In the corners of the walls horizontally, the tiles must be of the same width.
It is better to choose a slow-drying adhesive for tiles, this will eliminate errors in work without damaging the coating. When the glue sets, the crosses must be removed and the entire surface must be wiped.
Then you need to grout the joints with a special solution. The end result should look like the photo.
Every day starts and ends with a visit to the bathroom. Is this not a reason to carry out repairs in such an important room?
The owner of the bathroom shows in detail all the stages of work on which he had to work. The result is excellent, the bathroom has turned from an unsightly room into a cozy room.
VIDEO
A high-quality bathroom renovation cannot be done in a short time and at low cost. At the beginning of the next video, the presenter points out the mistakes of the masters. In addition to poorly glued tiles, improper laying of electrical wires, poorly made connections, many more mistakes were discovered that could lead to sad consequences. After dismantling all the problematic units, the master starts the renovation of the bathroom and lavatory with a new one. You will see how a quality repair is performed correctly and in what sequence.
VIDEO
In many city apartments, the bathroom and toilet facilities are too small and uncomfortable. The author of the following video proposes to make redevelopment and make a spacious bath that fully meets all sanitary and aesthetic requirements.
VIDEO
With a modern lifestyle, the bathroom should be not just a place to wash or take a shower, but a place where you can come after a hard day's work and just relax and wash away all the negative energy from yourself.
And for this, when the turn comes for repairs in the bathroom, you want to do it as best as possible and efficiently. In order to make high-quality repairs in the bathroom, first of all, you need to decide which material is best to use for finishing walls and floors.
First you need to make sure that the floor is flat. After all, any bathroom is not a bathroom, if its floor is not tiled, and for laying the tiles you need an even base. If this is an old house, then waterproofing is indispensable. After the waterproofing is completed and the control screed has dried, you can proceed to tiling the floor. On the construction market, there is a huge selection of tiles, both in size and type.
After laying the tiles on the floor, you can proceed to the walls. Alternatively, the walls can also be finished with the same tiles. It is not only beautiful and convenient, but also hygienic. But you must admit it is very simple. Despite all this, there are more modern technologies and materials for decorating walls in bathrooms. Some of these materials are moisture resistant plastic panels and MDF panels.
They can be either sheet type or typeset. First of all, it is necessary to treat the walls with special agents that have anti-fungal and moisture-repellent properties. Only then can you start installing the panels. When all the panels are installed, proceed to grouting and sealing with special sealants. To avoid the formation of condensation behind the panels.
For curtain walls, use plastic skirting boards. These skirting boards are attached to liquid nails. Plastic skirting boards are produced in a wide variety of shapes and colors. In order to decorate the wall with a plastic skirting board, you can choose any type of skirting board to your taste. Alternatively, you can use washable vinyl wallpaper to decorate the bathroom walls. They are not afraid of moisture and frequent cleaning.
Especially in urban apartments, a bathroom finished with natural wood looks very sophisticated and attractive. The grooved boards are coated with special antiseptics, and the top is covered with deck varnish perfectly resist the lip influence of water.
Video (click to play).
After all the processing procedures, such a coating will serve you for many years.