In detail: do-it-yourself bathroom and toilet repair from start to finish from a real master for the site my.housecope.com.
Repairing a toilet in an apartment is not an easy task, despite the seemingly small amount of work. The lion's share of the difficulties is connected precisely with the size of the room and with the installation of plumbing fixtures and pipes in the toilet: risers, wiring, sewerage. Of course, it is better to entrust specific work to professionals, but it is quite possible to cope with cosmetic repairs without outside help. Let's find out how to make repairs in the toilet with our own hands, saving time, nerves and money, and find out where it should start.
Even a small repair of a toilet in a panel house will require a large number of different tasks. In this small room there are many different communications: piping, sewerage, heating, lighting. Replacement of the toilet itself is often required. In some cases, a defective statement for overhaul may be required.
First you need to decide on the sequence of repairs in the toilet. Renovation begins in an old house or in a new building with the development of design and calculation of the necessary materials. It is advisable to carry out further stages of repair in the following order:
- removing old coatings from ceilings and walls;
- replacement of heating risers and sewerage pipes, installation of toilet installations;
- replacement of wiring (if necessary);
- room cleaning;
- preparation of the floor, pouring the screed, laying the floor covering;
- installation of wall coverings (wallpaper, tiles, panels);
- if necessary - assembly of a sanitary cabinet;
- installation of a toilet bowl;
- installation of a new door.
Even the most modest toilet renovation takes a lot of time and requires a significant investment, since plumbing is expensive. The most inexpensive repair option in the toilet is a simple cosmetic one, when the drain or wiring is not changed, but only the ceiling and walls are refreshed.
Video (click to play). |
Quite often, the toilet is a tiny room in which, as they say, you cannot turn around. In the houses of the 137th series, the toilet, in which, in addition to the riser and pipes, a ventilation shaft is also located, is so small that there is practically no free space between the toilet bowl and the door. Within such a small space, the development of a design before starting repairs requires a special approach. When thinking over the interior of the toilet, it is necessary to take into account some important nuances.
- The central object of the toilet is the toilet. First of all, it should be comfortable. Snow-white sanitary ware looks best, although other colors can be chosen. The main thing is that it fits the general interior.
- A great option for a small room is a built-in toilet. This is a practical solution: the tank and sewer pipes are removed into the plumbing cabinet, dirt, dust and microbes do not accumulate on them. Cleaning becomes much easier. In addition, the toilet in the installation moves a few centimeters deeper into the toilet, which makes staying in a small room more comfortable.
- Most often, heating pipes and water meters are installed in the toilet. It is also recommended to sew them into a beautiful sanitary cabinet. The interior will only benefit from this. Opposite the meters and taps, a hinged hatch should be provided so that at any time you can turn off the water or see the readings.
It is recommended to decorate a small toilet in light colors, as they visually increase the space. At the same time, it is better to choose a dark color for the floor.
If you are tired of standard solutions, you can search for ideas on the Internet and create an unusual toilet interior in a new building.An interesting option is shown in the following photo.
You can decorate the toilet with wallpaper or paint the walls in an unusual way, but you should avoid aggressive tones or excessive variegation.
A black and white toilet will look stylish and non-standard, especially if you choose high-tech black plumbing.
The load on the toilet room is quite specific. There is often high humidity, pollution and unpleasant odors. Therefore, the toilet should be used finishing materials that do not absorb odors and dirt, resistant to high levels of humidity, easy to clean.
For the repair and leveling of the floor surface in the toilet, it will be advisable to use self-leveling floors. The mixture must be cement-based. For decoration, it is advisable to use porcelain stoneware tiles.
To level the walls of the toilet in a new building, you can use drywall, but only its moisture-resistant modification (the distinguishing feature is the green color of the sheets). For the frame, aluminum profiles are recommended, since the tree quickly rots from dampness and is affected by a fungus. You can glue tiles, paint or wallpaper on drywall.
When repairing a small toilet in an old building, this leveling method is inappropriate, since the already cramped space will decrease due to the crate. The walls can be plastered or using a glue method for installing gypsum board.
Important! Before applying the finish, a layer of plaster must be treated with deep penetration impregnation in order to protect it from the harmful effects of dampness.
The choice of finishing materials for walls is wide enough:
- Tile. It is worth giving preference to the kaolion-based material (it is white on the back).
- Porcelain stoneware.
- Dye. The best choice is an easy-washable latex compound.
- Washable wallpaper. They should be based on polyester or propylene, paper wallpapers in the toilet quickly deteriorate.
- PVC panels. Suitable for "economy" type repairs.
The ceiling surface can be painted or a stretch ceiling made of PVC film can be installed, which will help prevent damage to the finish in the event of a leak from the neighbors on top.
The doors to the bathroom can be both standard and smaller, as in the houses of the 137 series. And this creates a lot of problems for the owners, since it can be problematic to find such a canvas. Only one recommendation can be given here - the door should be deaf.
When all questions on materials have been resolved and a design has been selected, you can begin the repair process. Where to start renovating a toilet? From dismantling old materials: removing the toilet, removing coverings, wallpaper, removing garbage, etc.
Repairing a toilet in a new building is easier: there is no need to change pipes, dismantle the old finish.
The next stage of the renovation is the installation of a new sewerage system. Now they use plastic. It is much lighter and cheaper, but not inferior in strength to traditional materials. When buying any plumbing kits, you need to check if all the rubber gaskets are in place. If they are not enough, there may be problems with the sealing of the joints.
Then they change pipes and wiring. Risers are now also made of polypropylene. They must be firmly attached to the wall, especially a hot water pipe, since they can deform under the influence of high temperatures. With the economy option, the pipes are not touched, since the price of repairs from this significantly increases. If the toilet is suspended, the installation is installed at this stage of the repair.
When doing electrical wiring in the toilet in a new building, you need to remember that the wires must be hidden in a special corrugation, and the junction boxes and wire connections must be taken out of this room.
Another point is ventilation. Often it turns out to be clogged, so it is necessary to clean it and close it with a special grill.
For efficient ventilation, it is advisable to equip a forced draft.
The repair is being completed by installing a toilet bowl and assembling a plumbing cabinet.
Knowing how to make repairs in the toilet and what kind of work you have to do, you just have to decide whether you can do everything yourself or whether it is better to entrust some of the work to professional craftsmen.
The cost of redecorating a turnkey toilet in Moscow ranges from 14-25 thousand rubles, in St. Petersburg such repairs will cost 10-22 thousand rubles. The price for overhaul with replacement of pipes starts from 35 thousand rubles.
You can save money by doing some of the work yourself, for example, dismantle the old coating, make a screed, etc. If you have no experience in performing any operations, you can watch training videos, look through photos in search of inspiration.
There are many ways to revitalize the interior of the bathroom. In the process of repairing the toilet, you can add interesting details with your own hands. In this article, we will talk about some transformation techniques that will help in the design of the space.
If we are talking exclusively about ideas, watch as many photos as possible. Before starting the repair, it is advisable to represent the final result as accurately as possible. Although some of them will definitely change anyway. If your toilet is already ready for renovation, the following plan can be used.
- We decide on the decoration of the walls (plastic panels, PVC, wallpaper or tiles)
- Choosing how to hide pipes
- We decide whether we need a wardrobe where it will be located
- Choosing a toilet
- We look at the trends in the finishing of the current year
These are the main steps. Read about each of them with photo examples here - use the plate for quick navigation. And now - cool ideas as such, so that you can pick up something interesting and useful.
Yes, pictures. Many would say that this is a very bad idea for renovation. Nevertheless, practice takes place. The classic design option is a golden frame against a background of red walls.
For each style, you can choose the right picture that will effectively decorate the room. The frame of the product must also correspond to the overall concept.
The tone of the walls continues throughout the painting.
A massive white frame sets off the active background and matches the color of the plumbing.
Plant motifs on the wall echo decorative flowers.
The bright pattern is in harmony with the color of textiles and hanging baskets.
Pratika shows that most people prefer to make built-in lamps or something else inconspicuous in the toilet. But you can, on the contrary, make lighting a part of the design! A modern design white chandelier matches the shade of the floor, toilet and sink against a wood grain backdrop.
The chandelier is massive enough for this bathroom and attracts attention. Let's skip the jokes!
Decoration in New Year's style. The filling of the niche can be changed, depending on the mood.
An unpretentious composition on the background of wooden dies - a wreath of dried flowers and decor in the form of a dried fish. The idea is easy to bring to life, and its implementation with your own hands does not take any energy at all.
Antique forms complement the marble walls.
Red and white interior in country style for Valentine's Day. Anyone can make such a design.
Candles can replace the main light in the evening.
The accent tone of the stylized bird and the organic shapes of the lamps break the severity of the interior.
Open shelves look spectacular only if order reigns on them.
The wood texture of the shelves matches the material of the cabinet. The three primary colors look great in a single space.
A capacious shelf is formed by the upper edge of the installation box.
In a small bathroom or in a room with brightly decorated walls, avoid piling up furniture, choose a laconic form of plumbing.
A suspended toilet with installation looks compact, without unnecessary details.
Choose plumbing in the same range, especially if the room is miniature.
When choosing an active pattern for the walls, give up wall cabinets in the toilet.
Suspended toilet bowl with installation in a bathroom with an area of 0.7 sq. m.
A minimum of items in a combined bathroom with an area of 1 sq. m. This was the main idea of the repair: we do everything simply, concisely, and most importantly - cheaply and with our own hands. Tile collections have long been selected by designers in showrooms.
No, really. Anything can be found on the market these days. So why not get creative with the choice of plumbing during the renovation? The black collection of sanitary ware looks unusual and is combined with the decoration of the space. The interior is also complemented by a painting in a black frame and a spectacular vase. The twisting branches in a vase are similar in shape to a water heater.
Toilet and sink in the form of truncated and inverted cones. The perspective of the marina and the futuristic shape of the sanitary ware in the interior look interesting and stylish.
Plumbing in vintage style.
Specular reflections distort the perception of real geometry. This is not the most popular technique when repairing a toilet with your own hands; many simply do not perceive this idea in such an intimate room. But this effect allows you to visually expand the boundaries of small rooms.
The mirror makes the room not so narrow (visually).
The article is addressed to those who are going to repair the toilet with their own hands, but have no experience. I will tell you about the most popular and affordable finishes and offer a step-by-step algorithm for working. You just need to follow my recommendations to get a quality result.
The photo shows an example of how you can carry out the work yourself
Even in a small area, you can create a comfortable and attractive environment.
Repairing a toilet is both simple and complex. Simple because the volume of work is small due to the small area, and difficult for the reason that, due to lack of space, you need to think carefully about everything.
All work can be broken down into 10 stages:
- Development of the future interior;
- Purchase of the necessary materials and tools;
- Dismantling of old plumbing and decoration;
- Replacement of communications and laying of new ones (if necessary);
- Construction of a box for masking pipes;
- Floor covering device;
- Wall decoration;
- Ceiling decoration;
- Installation of plumbing and other equipment;
- Door installation.
To get a neat bathroom, you will have to carry out a number of works
You do not need to think about where to start work, since first of all you need to think over the layout and decoration.
To do this, you need to do the following:
- Measure the area at your disposal. This is the main aspect that determines what you can deliver and how to arrange the elements.... Unfortunately, most often there is very little space and you have to adapt to the circumstances, and not come up with interesting solutions;
- Determine what equipment will be installed. If there is very little space, then most often only the toilet is placed. If there is more space, then you can add a washbasin, bidet or even a urinal, it all depends on your wishes;
Equipment installation standards: from the center of the toilet bowl to the wall should be at least 40 cm, the sink should be located at a distance of at least 30 cm;
It is important to position the plumbing correctly
- A wall-hung toilet can be an excellent solution. It does not take up space on the floor, but a metal frame will have to be attached to the wall, which will take about 10 cm of space. This option looks very attractive, but in installation it is much more difficult, this also needs to be taken into account;
Wall hung toilet - an interesting solution for small spaces
- The color scheme should be in soothing colors. You should not use bright colors and variegated finishes, it does not look the best in the bathroom. You can look at design ideas on the Internet, there are a lot of examples, and anyone will find an option to their liking.
There are many options, find the one that you like and which you can implement
After you have decided on an approximate design, you can proceed to the selection and purchase of materials.You must measure the area of the floor, ceiling and walls in advance in order to quickly calculate the approximate costs for one or another finishing option.
First, let's figure out what you can put on the floor:
- Ceramic tiles are the most popular solution. There are a huge number of types on sale, so there will be no problems with the choice. If you need a cheap option, then I will give you a little advice: look for substandard in stores, it is inexpensive, and due to the small volume, you can choose good ceramics. Most often, the marriage is not visible, but you can save very well;
The tile is a great solution, the material looks good and is not afraid of moisture and cleaning agents
- Self-leveling floor is a relatively new solution that is great for a bathroom. The coating is not cheap, but due to the fact that the floor space is small, the cost of installing it will be only slightly higher than when using ceramics. In addition, this option can be implemented with your own hands, which is also important.
Such coatings can simulate a wide variety of images.
For walls, you can use the following options:
- Ceramic tile. You can create patterns or even ceramic paintings on the walls. For the most discerning, a mosaic is suitable, a very effective, but also quite expensive coating;
Tiles are great for walls too
- Budget finishing option - PVC panels. They cost a little, but they also look much worse than the same tile. But if you need to do it cheaply and reliably, then this decision will come in handy;
PVC panels are good for toilets
- You can even stick wallpaper on the walls. You need to choose moisture resistant options. I would recommend using glass fiber as it can be repainted. That is, you can easily carry out cosmetic repairs and refresh the room in the future, simply by changing the color of the walls.
Wallpaper allows you to create a very original setting.
As for the ceiling, it is easiest to implement one of two options with your own hands:
- Fastening of plastic panels. They look good on the ceiling and are inexpensive. You can choose a more expensive option - rack metal ceilings. They look presentable and are almost indistinguishable from plastic in installation;
This option looks good.
- You can just putty the surface and paint it. If the ceiling is curved, then it is easier to build a frame and fix moisture-resistant drywall... So you get an even base, which must be putty with a thin layer and painted.
The color of the ceiling is matched to the rest of the finish
As for the tool, its list depends on the selected materials for finishing. Below I will provide a list of fixtures where necessary.
It is worth starting work by removing everything unnecessary. The process is simple, but it requires a lot of effort and a significant investment of time.
The sequence of work is as follows:
- First of all, old plumbing is removed. Most often, you just need to remove the corrugation from the toilet. If you have old equipment, you will have to break up the cement that used to strengthen the joints;
You can temporarily put a new toilet in order to use the bathroom
- The floor is usually covered with old tiles, which are very firmly in place. You can knock it down with a hammer and chisel, or with a puncher. The process is dusty and noisy, so it is better to work during the day;
Removing old tiles is a tedious job
- If there are tiles on the walls, then they are removed in the same way as from the floor. If the surface is covered with wallpaper, they need to be soaked and removed. Painted surfaces do not need to be cleaned if the paint adheres to them firmly. The exception is oil formulations, they must be removed, it is best to use a special wash for work;
Everything that does not hold well is removed from the walls
- If there is whitewash on the ceiling, then it must be soaked with water and removed with a spatula. Painted surfaces are inspected, only damaged areas can be removed.
At this stage, the following works are performed:
- If the old riser does not inspire confidence, then it is advisable to replace it with a new plastic one. Most often, you have to change the section from floor to ceiling, adapters are placed on the connections, and the structure itself is easily assembled from the constituent parts of the configuration you need;
The riser is attached to special clamps
- If you need to lay pipes around the room, then it is best to hide them in the grooves.... Communication may be needed if you put a sink and bidet or bought a toilet with a bidet. It is important to think about the correct pin layout so that everything is convenient. Even if it is not necessary to lay pipes in new places, it is advisable to replace the old steel communications with new plastic ones;
It is better to hide the pipes in the wall
- Do not forget about laying the wiring to the fixtures and the fan, if any. It is also better to hide them in grooves.
To hide the sewer pipes, you need to build a box. If the riser goes in the corner, then only this part of the room is closed, and if in the middle, then it is easier to make a partition and sew up the entire space behind the toilet.
The instructions for carrying out the work are simple:
- For the frame, we will use metal plasterboard profiles. Guiding elements are attached along the walls, and the structure is formed by the main profile;
- First, the structure is marked, vertical lines are drawn along the walls using a level or plumb line, the outlines of the future box are drawn on the floor and ceiling;
For accurate marking, you can use a square.
- A wall profile is fixed along the perimeter of the future structure. To do this, holes are drilled in the walls for fast mounting dowels with a diameter of 6 mm;
Guiding elements define the outline of the future structure
- Then the frame is attached, for this, the main profiles are used. To give the structure rigidity, it is reinforced with ribs, which are located every 40-50 cm;
The frame must be rigid
- The last step is to mount the moisture-resistant drywall. It is cut into pieces of the required size and fixed with special self-tapping screws with a fine pitch.
When carrying out the cladding, do not forget to leave an opening for the installation of the door to check the condition of the equipment and take readings from the meters.
The hatch will be inserted after finishing
We will start from this part of the room. First, let's figure out how a ceramic floor is made. To work, we need a certain set of materials and tools, listed in the table.
The bathroom is one of the smallest rooms in an apartment or private house in size. But, despite this size, this room is considered the most difficult from the point of view of architects.
Bathroom renovation, where to start
The first difficulty is that this is where all the layouts of engineering communications are concentrated. Any unskilled intervention in the wiring diagram will have very negative consequences for the entire structure. We will tell you how to competently solve problems with engineering communications in the article a little below.
The second difficulty is that the operating conditions for building materials, plumbing equipment and special furniture are the most difficult. Constant high air humidity, frequent direct contact of architectural elements with water and high temperatures require special materials and construction technologies. This is the only way to ensure the reliability and durability of the premises.
As with all construction work, bathroom renovations should start with planning. There are two reasons for the need to renovate the bathroom, there is a big difference between them, respectively, and the planning methodology is not the same.
The bathroom was damaged by flooding or fire. Such situations cannot be foreseen, and the consequences should be eliminated as soon as possible. Accordingly, there is no time for calm planning, decisions have to be made very quickly.
The flood always happens unexpectedly
Another major problem is finance.If you have time to carefully prepare for scheduled repairs and save money, then the consequences of the accident must be eliminated as quickly as possible.
The aftermath of the flood must be dealt with quickly
How to act in order to eliminate the consequences of emergency situations in a short time and with minimal losses? How to plan your bathroom renovation correctly?
-
Make an audit of the condition of equipment and building elements. Take this stage very responsibly, the more you notice the problems, the more complete the purchases can be made. And this means that there will be no need to go back to the store for every missed trifle and waste precious time.
Make an audit of the condition of equipment and building elements
Buy materials with the most similar properties
Make a work plan
When the preparatory planning stage is completed and materials have been purchased, you can begin repair work.
The situation is much calmer, there is time to think over and weigh everything in detail. What is recommended to consider when planning a renovation?
-
Consider your financial capabilities. At the same time, add up the price of all materials and the cost of their installation. If the repair is major, then you need to calculate the number and cost of re-equipment or installation of new engineering networks. The list of works includes the dismantling of old equipment and finishing materials (in the case of a major overhaul), preparation of wall, floor and ceiling surfaces, installation of water supply and sewerage, electrical wiring, installation of plumbing equipment and surface finishing. The specific list largely depends on the selected building materials and technologies.
Assess your financial capabilities
Consider the cost of plumbing or construction services
Draw a sketch of the room
Check the condition of the walls and choose materials for leveling, finishing
Only after clarifying all the questions, you can proceed to the direct repair of the premises.
The scheme of actions may change slightly, taking into account the peculiarities of the repair and the condition of the room. But for most cases, bathroom repairs need to be done in this sequence.
Step 1. Dismantling of old wall, ceiling and floor cladding. Use an electric hammer drill or manually remove the wall cladding. Don't try to preserve old ceramic tiles. Firstly, it is unlikely that it will be possible to reuse it due to its very unsightly appearance. Secondly, you can never predict how many pieces will remain intact and how many will have to be broken. Thirdly, the time spent on neatly knocking down old tiles can be used more rationally.
Step 2. Dismantle old plumbing and sewerage systems.
Important. If personal knowledge in plumbing intricacies is not enough, then we strongly recommend consulting a professional. Unskilled intervention in the installed heating, water supply and sewerage systems can completely disable them.
Cut metal pipes with a grinder, put the waste in one place. If the rest of the rooms are residential, then take measures to prevent the spread of dust. Always close the door, prevent drafts, cover furniture with plastic wrap. You will have to wear a respirator in the bathroom.
Step 3. Find out the location of the old wiring. This is not as difficult as it seems, but only if the wiring is laid in compliance with the PUE. Knowledge of the hidden wiring diagram will allow you to avoid many unpleasant situations during wall chasing or plaster removal.
How do I find the wiring in the wall?
How to find out the location of the wiring under the plaster?
- Find the wiring box on the wall, it should be under the ceiling. In the wiring box, several conductive cables converge, it has holes for their output. Modern boxes are made of plastic, in old houses there are iron ones.
- Find all switches and sockets on the wall, and on the ceiling where you connect the lighting fixtures. One of the main rules for installing electrical wiring is that all cables should be bent only at right angles, in direction they can only be vertical or horizontal.
- Draw vertical lines from sockets and switches, draw a horizontal line under the ceiling from the distribution box. There should be wiring in the plaster along these lines. To be sure, deviate from them by 5-10 cm in each direction. The fact is that not all electricians are conscientious about their duties, in order to exclude damage to cables it is better to make a margin.
Thus, you will find out where you can hammer in the plaster without fear, and in which places to be extra careful. But in any case, before starting work, you should turn off the machine in the bathroom.
Work on the installation of electrical wiring
Step 4. Install new wiring, sewer and water pipes. We strongly recommend placing all pipes under the wall cladding. The work is much easier if the walls are finished with different slabs.
Important. Before installing pipes and electrical wiring on the wall, you need to indicate the location of the switches and sockets, the connection points for the sink and bathtub. It is advisable to know the dimensions and features of plumbing, taking into account these data, you can accurately calculate the height of the location of water sockets and drains. Due to this, installation work will be accelerated, and the reliability of fixing plumbing will increase.
Step 5. Start leveling the ceiling, walls and floor. For the floor, professionals recommend using cement screeds, they have the highest performance indicators. If you plan to make a heated floor, then you need to take into account the total thickness of the cake and mark the position of the tiles on the wall from it.
For leveling, you need to prepare a container, a spatula, a level, a tape measure
The leveled walls are moistened during the drying period of the mixture
Step 6. After the screed has completely hardened, start laying the partitions. Their location should take into account the size of the bath or shower stall, the layout of the room, the presence of additional architectural elements, etc. merits.
First, beat off the position of the first row of blocks on the floor, check all dimensions and angles. Be sure to control the position of each row of blocks, it is better to lay them under the rope. To increase the stability of the partition across the row, tie the blocks with a perforated metal tape, fix it with self-tapping screws of the appropriate length. Use the same metal tapes to fasten the blocks to the main walls of the bathroom.
Step 7. Begin the installation of sewer pipes. If you are doing a major overhaul of a room, then you should study the purpose of each existing branch, otherwise you can turn off other rooms of the apartment or house. It is better to use plastic pipes. Connect them into a socket, for sealing all additional elements have rubber gaskets. The pipes are fixed to the wall with special clamps. If finishing plastering is planned, then walls need to be channeled under the pipes. The location of the electrical cables, drawn earlier on the wall, increases the safety of the work.
Good day, ladies and gentlemen! I want to tell my story of bathroom and toilet renovation, separate. Since the purchase of the apartment, the renovation of the bathroom was postponed for 3 years, since other rooms were the priority. Now the right time has come, we were just on vacation with the whole family in another city, spontaneously decided to come home a month earlier before the end of the vacation to start work. This was at the beginning of 2016. Therefore, all materials were purchased in Mirny, if they had planned in advance, they could have been ordered from the mainland and would have received significant savings. The budget turned out to be around 150 thousand.(approximately, another + -30 thousand), purely on the basis of materials. The main amount is collected from baths, tiles, plumbing. Basically I did all the work myself, if others did, then I can safely add another 150-200 thousand to the amount of materials for the work (probably). In our city, all prices are very high, this is a fact.
We have a house in 1996, the area is small, the bathroom, toilet, and balcony are very tiny. But the prices of apartments are the same as in Yakutsk, but the squares are lower.
Probably I will make a post in the form of a photo report with notes. We got a lot of photos.
On the floor lay old Soviet square tiles, which were glued either with concrete or with super glue, hammered with a perforator for 3 days 3 nights). Sorry neighbors again. The walls were covered with wallpaper that was painted.
A good semi-professional assistant in the repair and cleaning of carpets.
I bought tiles, I honestly don’t remember how much they cost. Wall-mounted ones cost 110 rubles / tile. Russian production. The quality is 3 minus. Even in the same box, the dimensions in length and width are different, so when you glue, the level begins to play. And if they had ordered from the mainland in advance, then for this money it would have been possible to order branded imported tiles, they do not say such a jamb.
A simple toilet, for 7 thousand. Karl. Big mistake.
The bathroom is acrylic, I like it, voluminous. Length 150 cm.
The old bathtub was made of metal. cooled down quickly.
The preparation of the sub-floor is in full swing. Deep penetration primer application. Then the concrete screed.
Neighbor Aunt Lyuba made adjustments from time to time, Soft tasty buns!
Work on replacing old metal pipes. I called the plumbers of the housing and communal services, they cut off the water, made 2 transitions to plastic from the hot water and cold water risers, and also installed 2 counters, 1 heated towel rail. Having emptied my wallet for $ 10,000
This photo shows how old metal pipes are clogged.
For a complete replacement of pipes they asked for another 15 thousand rubles. This is without breaking the walls. And my wife had an interesting idea. After watching a video on the installation of polypropylene pipes on YouTube, I decided to do it myself. I bought a welding machine for 2 thousand rubles. In principle, nothing complicated. The main thing is not to overexpose the pipes in the welding machine.
Didn't like the paint on the wall. To remove paint, I made just such a structure from a 5 liter bottle with a connection to a vacuum cleaner. The result was not particularly pleasing, because very long, dusty and noisy. I'll tell you in advance, it's easier how to do it: the paint that leaves itself - we clean it, then we go through the paint again with a scraper or chisel, then we buy a solution - concrete contact, apply and that's it. The surface becomes flaky, like coarse sandpaper. Tile glue is calmly adhered to it.
There are traces of a grinder on the wall.
Since the floors are very uneven, the slope is 3-5 cm per 1 meter, it is necessary to make an even level using the so-called beacons (green dots on the floor). Then, between the beacons, we throw a concrete solution and connect the beacons. We will fill in the inner squares along these lines.
As a result, we get a flat floor. There will be a bathtub on the right, so I decided to save some concrete there, we will level the level with the help of the legs.
Next, a layer of waterproofing is applied. For every fireman. Before each layer of concrete or waterproofing, apply a primer for better adhesion.
We glue the tiles, make a distance of 2mm between the tiles, using crosses. In the future, the inter-tile space is filled with a special grout.
Bath installation. Behind the bathroom, he chipped the wall and put a pipe from the mixer in there. When you switch the mixer mode to the shower, water will flow from the top. This is the wife's idea.
On the left is a strobe for electrical wiring, we connected a washing machine and made sockets. Right for the shower. Red is the concrete contact layer.
2 mixers)) The bathroom fills up 2 times faster))
We begin to glue the tiles on the wall from the level of the bathtub. First we go through 1 horizontal line, then 2 rows of tiles. You can see how to glue tiles on the Internet, I watched YouTube)). There you can find the entire repair process.
By the way, our walls are very crooked, sometimes with a propeller, sometimes with a slope. nightmare. And no one knew how to level the walls and would not have time. The most difficult areas were the corners. More glue, time and nerves. Now the walls are not crooked at all.
My mistake. I glued the mirror to the tile glue. The mirror is old from the previous owners.
Here you can see very clearly. Above, the corner goes back to back, and from below it begins to diverge. The question was solved by grouting and more glue)).
The ceiling has already been made. Lighting - 5 point diode lamps, enough for the eyes. A shower is installed, it works well (China), bought in Yakutsk, I don’t remember which store.
Drying glue spoiled the reflective layer.
Dismantling with your favorite hammer drill.
I bought an ordinary countertop, we have nothing but ordinary things in our city. Or in the tridoroga they will make to order "cool type".
Found a bedside table just in size.
Not a single centimeter between the cabinet and the bathroom. End-to-end. My perfectionism gets high. I installed the tabletop on the corners in the wall and on the bedside table. Holds on tight. At least jump.
Voila. The joint was smeared with white sealant.
Here is the final result.
The skirting board needs to be redone, hack. The shower is good.
Toilet. The foundation has been prepared.
Concrete screed. It is done like in the bathroom.
Waterproofing. Don't forget about the primer.
And we begin to glue the floor tiles.
There are many pipes, meters, etc. To hide all this wealth, we make a frame structure from profiles with drywall.
A concrete contact is also applied to the drywall, then the tiles are glued. The ceiling is the same as in the bathroom, here it is 2-point. By the way, both the bathroom and the toilet are equipped with ventilation systems (fans). A very useful thing.
A hidden shelf was made behind the toilet.
That's all. In time, I spent a year. 1 month did the main thing. Then a little bit, then the doors were changed, then they made a shelf in the toilet.
Video (click to play). |
In Yakutsk, you can do everything even cheaper, and in a more original way, there are more choices in stores and prices are lower than ours. So go for it. The post was made so that others are not afraid to make repairs, everyone can also, even better... The main desire.