In detail: do-it-yourself bathroom renovation from a real master for the site my.housecope.com.
Most of the repair work in the bathroom can be done independently without the help of specialists. This is especially true for the cosmetic decoration of the room, since even a novice master can hide pipes in a GKL box and lay ceramic tiles. Before carrying out the work, you need to draw up a design project for the bathroom and determine where to start repairing the bathroom.
Basic work when repairing a bathroom can be done independently. A novice craftsman can easily flood a screed with his own hands, make waterproofing, plaster walls, solder plastic pipes, assemble a drywall box and lay tiles.
More skills will be required when installing electrical wiring. In this case, people with no experience should contact a specialist.
Renovations in the bathroom should be made in accordance with the technology. All construction work must be carried out in strict sequence.
The main question that arises before renovating a bathroom is where to start remodeling a bathroom. Experts recommend determining the budget at the first stage. It is necessary to designate the upper price bar for finishing materials, since all expenses will fall on them. Having a rough estimate will avoid unnecessary expenses.
It is recommended to buy building materials in one store, since discounts are often given for bulk orders. The required amount of dry mixes can be calculated knowing the surface area on which they will be applied. Tiles and porcelain stoneware need to be bought with a margin of 10-15%.
To reduce costs, you should refuse to help a designer. You can think over the style of the room and the arrangement of furniture yourself. To facilitate the task, it is worth creating a three-dimensional model of the room using a computer program.
Video (click to play).
The correct sequence of renovation in the bathroom is the key to a quality finish. All work is carried out in several stages. To begin with, the old finish and pipes are dismantled in the room, all unnecessary items are removed.
Then the surfaces of the walls and floor are leveled. After that, they move on to marking up communications. The layout of the electrical and ventilation must be thought out in advance. Then the room is finished. The final stage is the connection of plumbing and the installation of furniture.
Dismantling the bathtub, old coatings and doors.
Plastering walls.
Engineering works (rough installation of pipes, electricians).
Leveling the floor.
Waterproofing works.
Sealing of pipes in a plasterboard box (if necessary, installation of the installation on the gypsum board).
Laying tiles.
Installation of the door leaf.
Ceiling decoration.
Plumbing connection.
It is not recommended to start renovating a bathroom without planning it in advance. First you need to think over the design of this room. You should decide on the style of the interior, its colors, think over the arrangement of furniture.
Experts recommend drawing a diagram of the room, indicating on it the dimensions of the walls, sockets, lamps, switches and pipes. At this stage, you need to calculate the area of the surfaces that will need to be finished.
An important part of planning is the choice of finishing materials and plumbing. For repairs, they choose ceramic tiles, plastic panels. Do in the bathroom and decorative plaster walls. It is better not to save on building mixtures. It is recommended to choose plumbing equipment taking into account the size of the room.
To finish the bathroom, you will need the following rough materials: