How to start repairing the toilet with your own hands

In detail: how to start repairing the toilet with your own hands from a real master for the site my.housecope.com.

There are many ways to revive the interior in the bathroom. In the process of repairing the toilet, you can add interesting details with your own hands. In this article, we will talk about some transformation techniques that will help in the design of the space.

If we are talking exclusively about ideas, watch as many photos as possible. Before starting the repair, it is advisable to represent the final result as accurately as possible. Although some of them will definitely change anyway. If your toilet is already ready for renovation, the following plan can be used.

  1. We decide on the decoration of the walls (plastic panels, PVC, wallpaper or tiles)
  2. Choosing how to hide pipes
  3. We decide whether we need a wardrobe, where it will be located
  4. Choosing a toilet
  5. We look at the trends in the finishing of the current year

These are the main steps. Read about each of them with photo examples here - use the plate for quick navigation. And now - cool ideas as such, so that you can pick up something interesting and useful.

Yes, pictures. Many would say that this is a very bad idea for renovation. Nevertheless, practice takes place. The classic design option is a golden frame against a background of red walls.

For each style, you can choose the right picture that will effectively decorate the room. The frame of the product must also correspond to the overall concept.

The tone of the walls continues throughout the painting.

Image - How to start repairing the toilet with your own hands

A massive white frame sets off the active background and matches the color of the plumbing.

Plant motifs on the wall echo with decorative flowers.

The bright pattern is in harmony with the color of textiles and hanging baskets.

Video (click to play).

Pratika shows that most people prefer to make built-in lamps or something else inconspicuous in the toilet. But you can, on the contrary, make lighting a part of the design! A modern design white chandelier matches the shade of the floor, toilet and sink against a wood grain backdrop.

The chandelier is massive enough for this bathroom and attracts attention. Let's skip the jokes!

Decoration in New Year's style. The filling of the niche can be changed, depending on the mood.

An unpretentious composition on the background of wooden dies - a wreath of dried flowers and decor in the form of a dried fish. The idea is easy to bring to life, and its implementation with your own hands does not take any energy at all.

Antique forms complement the marble walls.

Red and white interior in country style for Valentine's Day. Anyone can make such a design.

Candles can replace the main light in the evening.

The accent tone of the stylized bird and the organic shapes of the lamps break the severity of the interior.

Open shelves look spectacular only if order reigns on them.

The wood texture of the shelves matches the material of the cabinet. The three primary colors look great in a single space.

A capacious shelf is formed by the upper edge of the installation box.

In a small bathroom or in a room with brightly decorated walls, avoid piling up furniture, choose a laconic form of plumbing.

A suspended toilet with installation looks compact, without unnecessary details.

Choose plumbing in the same range, especially if the room is miniature.

When choosing an active pattern for the walls, give up wall cabinets in the toilet.

Suspended toilet bowl with installation in a bathroom with an area of ​​0.7 sq. m.

A minimum of items in a combined bathroom with an area of ​​1 sq. m. This was the main idea of ​​the repair: we do everything simply, concisely, and most importantly - cheaply and with our own hands.Tile collections have long been selected by designers in showrooms.

Image - How to start repairing the toilet with your own hands

No, really. Anything can be found on the market these days. So why not get creative with the choice of plumbing during the renovation? The black collection of sanitary ware looks unusual and is combined with the decoration of the space. The interior is also complemented by a painting in a black frame and a spectacular vase. The twisting branches in a vase are similar in shape to a water heater.

Toilet and sink in the form of truncated and inverted cones. The perspective of the marina and the futuristic shape of the sanitary ware in the interior look interesting and stylish.

Plumbing in vintage style.

Specular reflections distort the perception of real geometry. This is not the most popular technique when repairing a toilet with your own hands; many simply do not perceive this idea in such an intimate room. But this effect allows you to visually expand the boundaries of small rooms.

The mirror makes the room not so narrow (visually).

Step-by-step instructions for repairing a bathroom and toilet.

According to most finishers, repairs in an apartment should be started from the bathroom. Let me explain why: this is the dirtiest and dustiest part of the renovation, requiring not only the dismantling of old tiles, plumbing fixtures, doors, and sometimes the entire bathroom walls.

So the first thing we do is we take out the old plumbing: a bath, a sink, a toilet bowl ... Everything that costs, weighs, lies.

• Next stage: with the help of a grinder we cut off all the old pipes to the crane located on the riser.

Using a punch, knock down the old tiles.

It is important if the plaster under the tiles moves away from the wall, bunches ... it must also be beaten off.

We dismantle the old door together with the box.

Change risers... Now we turn our attention to the plumbing and sewer risers. This is a very important part of the renovation and must be changed. After renovation it will be very problematic. If you are not a specialist in plumbing work, then to replace the risers, it is better to invite qualified craftsmen, but you can do the internal wiring of the water supply yourself.

Checking the hood... Let's move on to the hood. If we do not want the bathroom to be stuffy, we need to check the operation of the hood. To do this, we bring a burning candle to the hood and evaluate its work by the tongue of the flame: the better the hood works, the more intensely the flame is sucked into the chimney pipe. If the hood does not work correctly, we either clean it or install a fan in it.

We ground the walls... At the next stage, I propose to clean up properly: take a broom and sweep out all the debris and dust from the bathroom. After all the dust has settled, we take a deep penetration primer and prime the walls.

Installing beacons... After the primer has completely dried, we install beacons for further plastering of the bathroom. Lighthouses must be installed strictly according to the level, observing the plane of the wall and maintaining angles of 90 degrees.

Plastering walls... Have you installed the lighthouses? Let's start plastering. To do this, we need a rule, a spatula, a drill and a drill mixer attachment. Bathrooms are plastered, as a rule, with dry gypsum mixtures, since there is no shortage of them on the market. I usually use Rotband plaster. We take a bucket of 12 liters and prepare a solution in it as written in the instructions. Using a spatula, we throw a solution between the beacons of one wall 50 centimeters from the floor. Then we take the rule, press it against the lighthouses and pull it up - we get a flat surface. We remove superfluous from the rule. And so on all the walls - from floor to ceiling. There are not large pits left - it does not matter - then we level them with a spatula. If everything is smooth and beautiful, then you have coped with the task.

Read also:  DIY starter repair Skoda octavia tour

Leveling the floors... The next stage is the floors. We level them with the help of "self-leveling floors".We dilute the mixture as stated in the instructions, it can even be slightly thinner, and spread it all over the floor using a needle roller. After drying, the walls and floors, just in case, we check by level, we eliminate unevenness.

We make a detailed plan of the bathroom... At the next stage, we must decide on the design of the bathroom, where? as? and at what height? there will be a bath, a sink, a mirror, a washing machine (if any), a towel dryer, a toilet bowl, a box covering the risers. To do this, we take a tape measure and measure our bathroom - after plastering, the dimensions have changed. Then we take a pencil and a sheet of paper, and sketch everything. Let's call this a bathroom plan. For the plan to be accurate, at this stage, we need to buy all the bathroom objects. It is important to remember: if the bathtub is tied to the size (I mean that your bathtub is not half a football field, but for example 1m.70cm by 1m.50cm), then the bath should be bought as long as possible. And if your size is 1m.68cm. - you need to buy a bath for 1m.70cm. Then 2cm. screw it up. With this sort of sorted out.

Video - turnkey bath repair

We make (sketch) a detailed markup of the water supply and sewerage system... If everything is purchased, then we continue. We collect the bath in a free room. We put it on the legs and level it. As a rule, in most bathtubs, the height of the legs is adjustable - we adjust the height for you. We measure the height and width of the bath. We transfer the dimensions to the bathroom wall. All the same - we do the same with the sink and the washing machine. The next thing we do is mark on the walls how our water supply and sewerage system will go. A bathroom faucet is usually installed in the center 10 cm above the bathtub - this also needs to be sketched on the walls. The distance between the pipes to the bathroom faucet should be 15cm. We mark the water supply for the sink, based on the structural features of the bedside table, and the length of the flexible hoses of the mixer. We mark only one pipe under the washing machine - the cold one. We sketch the sewer pipes at an angle towards the riser (so that there is a drain). If a small slope can be made under the bath and sink, then the outlet under the washing machine should be at a distance of 50 cm. from the floor.

We make (sketch) a detailed marking of the wiring... The next thing we do is define the wiring. How many sockets will we have, and where - if there is a washing machine, then next to it. Use an electric shaver - next to the mirror. If you have a backlit mirror, you will need to bring out a wire under it (decide at what height). If there will be a fan, we will bring it out under it too.

Making strobes... When we have completely decided and sketched, we take a puncher and chase it according to the plan. Next, we remove and prime the grooves.

We install water supply and sewerage... At the next stage, we install the water supply (comb) and sewerage system. Don't forget to install water meters and filters as well. Since our water supply is retracted into the walls, it is better to use polypropylene pipes or metal-plastic pipes.

We mount a heated towel rail... At the next stage, we invite the masters or install the heated towel rail ourselves. The pipes are also wall-mounted.